HomeMy WebLinkAboutR-03-0526J-03-259
03/19/03
RESOLUTION NO. 03— 526
A RESOLUTION OF THE MIAMI CITY COMMISSION,
WITH ATTACHMENT(S), BY A FOUR-FIFTHS (4/5 THS )
AFFIRMATIVE VOTE, RATIFYING, APPROVING AND
CONFIRMING THE CITY MANAGER'S FINDINGS OF AN
EMERGENCY(S), WAIVING THE REQUIREMENTS FOR
COMPETITIVE SEALED BIDDING PROCEDURES AS
DESCRIBED ON THE EXHIBITS) ATTACHED AND
INCORPORATED; ALLOCATING FUNDS FROM THE
BUDGETS OF VARIOUS USER DEPARTMENT ACCOUNTS.
BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI,
FLORIDA:
Section 1. By a four-fifths (4/5th,) affirmative vote,
the City Manager's findings of an emergency (s), waiving the
requirements for competitive sealed bidding procedures as
described on the exhibit(s) attached are ratified, approved and
confirmed, with funds allocated from the budgets of various user
department accounts.
C
CITY COMMISSION
MEETING OF
li�so_ution DIo.
03- 5,0
Section 2. This Resolution shall become effective
immediately upon its adoption and signature of the Mayor.11
PASSED AND ADOPTED this 22nd day of _ May , 2003.
MANUEL A. DIAZ ,MAYOR
In accordance with Miami Code Sec. 2-36, since the Mayor did not indicate approval of
this legislation by signing in the designated place prcvi�dird, sa,,id legislation now
becomes effective with the elapse of ten ('110) days from the date of commission action
regarding same, without the Mayor exercising a vote.
ATTEST:
PRISCILLA A
CITY CLERK
e'7 P cilla A. Thompson, City Cerk
THOMPSON
AND CORRECTNESS:
GVHNUKU ViLARELLO
TY ATTORNEY
W7068:tr:MJC
�i If the Mayor does not sign this Resolution, it shall become
effective at the end of ten calendar days from the date it was
passed and adopted. If the Mayor vetoes this Resolution, it shall
become effective immediately upon override of the veto by the
City Commission.
Page 2 of 2
03- 526
RECEIVED
MaK 4 Z000
Donald H. Warshaw
TO City Manager
CITY OF MIAMI. FLORIDA
INTER -OFFICE MEMORANDUM j 99-n0-On6 _.
FROMJohn H. Ja on, Acting Director
Public Works Department
March 2'I ; 2000
DATE C; -_ E
Virrick Water Sports Center
SUBJECT. Floating Dock Project, B -3270-A
Approval for Increase in Contract
REFERENCE
ENCLOSURES
The Virrick Water Sports Center Floating Docks were approved as an "Emergency"
project on May 26, 1999 after a finding that a waiver of the formal competitive bid
process would be necessary in order to have the floating docks in place for the 1999
World Blind Sailing Championships which began October 16, 1999.
The informal bids received July 1, 1999, were over the architect's estimate and
negotiations began with the low bidder to "value engineer" the project to within the
architect's estimate. The bid price of $426,000 was reduced to $380,000. The cash
allowance was cut in half from $15,000 to $7500.00 and was included in the bid amount
accepted by the City on August 18, 1999. After approval by the City Manager, the
contract package was submitted to the Financial Oversight Board (FOB) on August 30.
FOB's approval was received September 1, 1999.
The project schedule was very tight even though the City approved the manufacture of
the floating dock components before the construction contract was finalized.
Fortunately, the floating docks were substantially completed on time (with a temporary
C.O.) and the World Blind Sailing Championships were a great success.
Although the floating docks were substantially completed on time, there is some
additional unforeseen work required to fully complete this project. The Miami Dade
County DERM-Coastal Construction Permit issued August 27, 1999, . after the bid
amount was finalized, required 68 tons of riprap boulders to be added to the project as
an environmental impact item. There was also unforeseen electrical work required by
the electrical inspector needed for the T.C.O. As a result, there is a need to increase the
construction contract by a total of $15,207.95. This increase would bring the total cost of
the floating dock portion of the overall project to $395,207.95 which is a little less than
the architect's original estimate for this work.
J -03-259
W7068
03- 526
Vimdc-FbatD0ck-CwVadI=ease
INTEP.nccirC %AcMnc r), - I
FILE MAY 2 6 1999 _
EMERGENCY FINDING
virrick Water Sports Center
Floating Dock for World Blind
Sailing Championships
CROU D�/nald Warshaw REFERENCES
City Manager
ENCLOSQRES
Based on information furnished to me by the Director of the Public Works Department and
the Director of the Parks and Recreation Department, 1 have found that a valid EMERGENCY
exists on the Virrick Water sports Center project due to the selection of the City of Miami as
the host City for the 1999 World Blind Sailing Championships for which new floating docks
need to be designed, permitted, and construction by October 16,1999.
In mid-February, 1999, the Chairman of the Shake -a -Leg organization informed City officials
that the City of Miami's virrick Water Sports Center (formerly Gym) had been selected as the
site for the World Blind Sailing Championships starting October 16, 1999. The plans for
renovating the Virrick Gym site into a Water Sports Center were approved by the City
Commission in July, 1998. The plans include new and larger floating docks to accommodate
greater access of the disabled and able bodied public, particularly young people, to the
waters of Biscayne Bay for sailing and other water sports activities. The City is supporting
the World Blind Sailing Championship event and both the Parks and Public Works
Departments have been directed to work closely together and expedite the construction of
the new floating docks for this event.
The Public Works Department met with the architect, Duany, Plater-Zyberk & Company (DPD,
and its, consultants, Environment Development Consultants (EDC), and prepared a schedule
for the design, environmental permitting, preparation of bid plans, manufacture of floating
docks, shipping, and final construction. Based on this schedule (see Memorandum of May 3,
1999 attached), there is not enough time for the City to follow formal bidding and award
procedures and meet the City's commitment to have the new floating docks constructed in
time for the World Blind Sailing Championships.
To meet the Championships' schedule, both Parks and Public Works Departments are
recommending the waiver of formal competitive bidding methods under Section 18-84 of
the Miami City Code since a valid emergency essential to the obligations of the City exists.
The Department of Public Works proposes to implement informal bidding procedures by
submitting the bidding documents to at least three (3) firms that are specialized and
experienced in the manufacture and installation of floating docks. upon receipt of bid
proposals, the firm with the lowest responsible and responsive bid will be awarded the
project.
This finding of an EMERGENCY and award of contract will be submitted
Commission at the earliest possible date for ratification and approval.
I'S
low
DHW �JJL1Vmm
T'
C: Raul Martinez, Assistant City Manager
Judy S. Carter, Director, Purchasing Department
James J. Kay, Director, Public Works Department
Alberto Ruder, Director, Parks b Recreation Department
EMERG-FloarDOck-Vlrrlck-MEMO. doc
03 -
to the City
526
Donald H. Warshaw, City Manager
vrrick Water Sports Center — Floating Dock Project — Increase in Contract
Page No. 2
There is funding available in the Safe Neighborhood Parks Bond funds for this work
under CIP No. 333124. Since this is an 'Emergency' project, which was approved by
the FBO at the original contract amount of $380,000, we are requesting your approval
for the $15,207.95 increase in contract, which will also require FOB approval. With this
increase the construction can be finished, and we will be submitting the final contract to
the City Commission for ratification.
If this request meets with your approval please indicate bypigning below:
Donald H. W rsha , City Manager
Date:
c: 4aul Martinez, Assistant City Manager
Albert Ruder, Director, Parks & Recreation Department
Allan I. Poms, Chief Architect, Public Works Department
vVrix.FkWtD'x*-c 1n=,x 03— 526
-- - - -- - - - 'M OP 11x11 A. FLoFODA ~
. JUL 18 2002 _
RPS14"CE MEMORANDUM _ 02-03-079
to : Carlos A. Gimenez °ATI ` July 2, 2002
CityMmum sem: Pmagency Repairs sty
Raaovations to Bathrooms at
mor. (3,rietias P. Abram. Dr:octor Drager Key Matmz
Conferaacea„ Conventions & Public FacrMdes e+aosursc
Thu memormdmn nerves to rsgveac your aathmization to invesse lira amount for Public Worla Job
No. 8-6417 for emergency rgmirs and r=vations to the bathroom faeftes at Din= Rey Marina.
The anginal estimate for this Project was $80.000 to bring the fed into complisaea with ADA
zegrritemetits, replace tiles and repair pbmibiaj, electrical and ventilation aystemc (please see
attached memo). The Dgwtmaot of Public Waarlta bas advised that an mwease in the mom of
SIS.000 is required to complete the project. This will include replacearent of wristing H& fmtutea
with vandal resistaat Glc, acs, replacearr m of bathroom wrtra w doors. mon of a retractable
aarait�g above the camce door, and mon of a new air conditioning system for both
bathr+rtoms.
Funding in the amount of S 15,000 is available Ecsa ClP Roject 326009.
Please indicate your approval for this >twrease by signing blow.
Budgetary Review and Approval:
VeriScation off
ding in the amo= of Sl 5,000 from CIF Project 326009.3593016.830.
- Marcelo Peeba. Acting Direerot, Dept
By:
Pilar
;;KN
MUCPry M'r
J -03-258
and Budget
Dam:
Datc: ?"H '9Z
Date: A�90-
RM JLL 10'02
W7067 03- 526
TO Carlos A.Cimenez
City Manager
ok CITY OF MIAMI, FLORIDA 41
INTIER-OFFICE MEMORANDUM
DATE: December 17, 2002 FILE :
SUBJECT. Emergency Find Request/
Repairs and Renovations-
Christina DKM Bathrooms
FROA1 : Christina P. Abrams REFERENCES :
Director
Conferences, Conventions & Public Facilities ENCLOSURES.
This memorandum serves to request your approval to increase the amount for Publie-Works
•
Job No. B-6417, for emergency repairs and renovations to the bathroom facilities at Dinner
Key Marina.
The original estimate for this project WS 95,000. However the actual bid received was
$122,000. The Department of is rer xnmending an increase of the original
estimate by $35,000, for a total amount of $130,000. This amount would provide the
527,000 needed to bring the total to the actual bid amount, with an additional $9000.00
provided for unforeseen conditions. '
This price would include the replacement of existing light fixtures with vandal resistant
fixtures, replacement of bathroom entrance doors, installation of a retractable awning above
the entrance door, and installation of a new air conditioning system for both bathrooms.
Funding in the amount of $35,000 is available from CIP Project 326009.
Please indicate your approval for this increase by signing below.
Budgetary Review and Approval:
Verification of funding in the a��nt of 535,000 from CEP Project 326009.359301.6.830.
Ry.
By.
By-
Funding
y
Date
Made -lo Penba, A dag Director. Dept of Management and Budget