HomeMy WebLinkAboutR-03-0524J-03-257
03/19/03
RESOLUTION NO. 0 3— 524
A RESOLUTION OF THE MIAMI CITY COMMISSION,
WITH ATTACHMENT(S), BY A FOUR-FIFTHS (4/5Txs)
AFFIRMATIVE VOTE, RATIFYING, APPROVING AND
CONFIRMING THE CITY MANAGER'S FINDINGS OF AN
EMERGENCY(S), WAIVING THE REQUIREMENTS FOR
COMPETITIVE SEALED BIDDING PROCEDURES AS
DESCRIBED ON THE EXHIBITS) ATTACHED AND
INCORPORATED; ALLOCATING FUNDS FROM THE
BUDGETS OF VARIOUS USER DEPARTMENT ACCOUNTS.
BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI,
FLORIDA:
Section 1. By a four-fifths (4/5th,) affirmative vote,
the City Manager's findings of an emergency(s), waiving the
requirements for competitive sealed bidding procedures as
described on the exhibit(s) attached are ratified, approved and
confirmed, with funds allocated from the budgets of various user
department accounts.
CITY COMMISSION
BILEETING OF
MAY 4 2 7n,93
a"446M No.
03- 524
Section 2. This Resolution shall become effective
immediately upon its adoption and signature of the Mayor.!'
PASSED AND ADOPTED this 22nd day of May , 2003.
MANUEL A. DIAZ, MAYOR
In accordance with Miami Code Sec. 2-36, since the Mayor did not indicate approval of
this legislation by signing in the designated place provided, said legislation now
becomes effective with the elapse of ten (10) days from the date of commission action
regarding same, without the Mayor exercising a vote.
ATTEST:
PRISCILLA A. THOMPSON
CITY CLERK
APPROVED AS„TO FORJI-�D CORRECTNESS:
FLEQ DR -O V I L
CWATTORNEY
W7066:tr:MJC
LLO
riscilla A. Thompson, City Cerk
�i If the Mayor does not sign this Resolution, it shall become
effective at the end of ten calendar days from the date it was
passed and adopted. If the Mayor vetoes this Resolution, it shall
become effective immediately upon override of the veto by the
City Commission.
Page 2 of 2 0 3— 5 ti 4
AIL" l V WL. MV►► V - J I Sian =I..0«........
2002 11:04
305371__1 CITY MIA PLIBL.IL r PAGE 61/61
Rriilts t�R 25'02
Grr y or MIAMI, rLORIDA
INTER-OpFICE MEMOPANi3UM 01-02-188
Carlos A. Gimea ax
city Max=
02 AFR 29 Aur 10:2c oaT+E. FU-,
. Ap�.24, 2002
: Christina P. Abr. mi. Dimaor
Confamcce, Ca wadow, A Pubiio Facilities
euaWr :
R"wat JP w Audmwi=dioa For
Energency Pdee!Maa War /
Phalft M* ImCaNden At
Marim S"siva Narita
Pleaw allow tbb tca as%ri as neVm for your atdhoritration a+ :btidate so towsaW purdmise oder In
to amount of : 39,600.tA for the 6Wdbdoa of Boating do*, PogwsYs• rod Pilings at Marble
Stwrmm MariRta.
The project to b aidatri.cad artsil4 the hitt of a muine conndw to attach (14) scatkes of floating
vessel staging do :L, fntmcdt and it wW mooring PSP for the d4oits; stmeh shmdnnm gsngwa}►s to the
doela; and pwfc m various mk%ptiea arAm required by tbe• r qpb tiny ARNO tS dist approved tM
pennits for chit • •rc*t. The floating doeb vivre da%Mcd ad Couatrucud by maba staff, providiog
siEtttllow savlq s to the Cky In thao project With do aubmitoe of the ptaofiasing Depaitmarr. um
bays identified &A etiliwd an wdednS Miami Dade County Marine Semi= C&*ract for the prJeet.
Competitive quos :f wom joHoOd ftm dw coraaWS MHpatif ed vaWonk,, and the an=at mquretW
represents the los met respceuho and respoaarble bid.
The mui wo ea Sting Anting docks are not scouted in place by pilings, and havo no reUbw or
itartdcsils ca do; sr.smy.; Whlch cataea sunt ibstAft Wr our of Ommis. Addaiottaily, there v
cucrartly no dad rated dock or mvkv arae front eu6ich to V- mWde guspthm fud EW reuk to Umrbu
custorums and of as bo*Un. 'ides kp ovemenh outMW above would greatly bnpcove customer sa%ty
on the dOM at ti : clear lot. and provide aiatple space to wU W to lite publio (thus generating inmeased
mvawas for do C:tj). Agency pe adw fbr tbie project an due to oTim in lune 20OZ m"s k
nacee+ary to und, a•taira tW, project as soon as possible► Marge Stadium Marina is eurremly pWj=md
to generate over I "50.000 int reveitaea for the Ow this final year.
f uading for this project is available from C.I.p project accounts, as vaifkd below by the Budget
Depsrmtent. It s with +itis in mind that we resp= Wly mquest the abort. Kindly indicate your
F*fautce by site 1A; beiv%
AW*--01#CpZ, (Dats)� . city Manager
VeriSestioaerh ditte•ril incipaccounts:
P94 !,0
:N aotac
Depattroent of rsgmwt dt Budget
t CAG KR/CPAI: �b
Ii
J -03-257
w
W7066
3260W369301AJO -
311010.3-13OL6.330 • ;tflesq,14,11
(Data) 1s.�� ApPROVA
o2-
03-
Z
03- 524
a1'46 i:- .722919 GIT' MIA pL..� A PAGE 81/81
S
O1 -OZ -113 —
CRY OF U AdI. Fi.XMA
INTEii "CE MEMORANDUM
To C,aricsA..Of== '
Cityman
ler
'MM. CkWm P. Ahnem, Director
C0060=9 44 Coavntioas. dt Public FACET ee
aAn : JWy 23, 2001
"Alli* A*Ari=ft TO h*iate Emertency
Repairs / Mabee Stadium Maine
Buk oams
ea=0410:
Pk= abw this oo saMe as regaw for yoga rAodudw for this Department to iti We cmerB�Y
Npsas to the rrshoom 6aaTaties M Matin Swam Ma ba.
The main sankm newer Hu bmeatb tM bttbroow recody eonapsed, rwAalog the lhc&la
bopersblo and womateft the naW of a pcctabte bathroom trda at a cost of 52,300 per month.
The Dint of Public Worm eondncted in of the ratroa= and has estimated the
cost of recosmamded repaba I movadm at 6e#eea S=0,000 ad 3100.000. ne restroom
facilities am qVa3&uZW 45 years old, and servo not oaf► the A(wbils awam M but also the
custom xs and embytes of tic faaWs comwavW tenuw. Bayside Seafood Restaurvat, Tome
Jet Sia RaaWs. aid Southeast Mm*w Rapaas.
Pursuant to your gnaw , the Department of Pub& Wo b wilt coor'd wt the repair Pmt4
ul t6dag took staff and an Mmmet bid pcoow to ewcdiac the wodr. i1r. BWgtt Departmena has
ida tl8md a hmdiat source ibr the needed rep dm. from C.I.P. Pcoject 3 i 1016, as vaified below.
Plow indicate your
Approved:
by sib below.
Data:
vaiSagtioa of available toaftg In the sa mut of S"JO0.00 boa C.LP. Budget aeeouat
311016:
DeportmCS O &
r�
J -03-256
W7065
G
03— M