Loading...
HomeMy WebLinkAboutR-03-0522J-03-255 03/19/03 RESOLUTION NO. 03— 522 A RESOLUTION OF THE MIAMI CITY COMMISSION, WITH ATTACHMENT(S), BY A FOUR-FIFTHS (4/5 THS ) AFFIRMATIVE VOTE, RATIFYING, APPROVING AND CONFIRMING THE CITY MANAGER'S FINDINGS OF AN EMERGENCY(S), WAIVING THE REQUIREMENTS FOR COMPETITIVE SEALED BIDDING PROCEDURES AS DESCRIBED ON THE EXHIBITS) ATTACHED AND INCORPORATED; ALLOCATING FUNDS FROM THE BUDGETS OF VARIOUS USER DEPARTMENT ACCOUNTS. BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. By a four-fifths (4/5th,) affirmative vote, the City Manager's findings of an emergency(s), waiving the requirements for competitive sealed bidding procedures as described on the exhibit(s) attached are ratified, approved and confirmed, with funds allocated from the budgets of various user department accounts. CITY COMUSSION r4EET3jc OF 2p� Resolution Pio. 03- 522 Section 2. This Resolution shall become effective immediately upon its adoption and signature of the Mayor.!' PASSED AND ADOPTED this 22nd day of May , 2003. MANUEL A. DIAZ, MAYOR In accordance with Miami Code Sec. 2-36, since the Mayor did not indiceite approval of this legislation by signing in the designated place prcvi;'ed, sad "-+ s :c` I €ora+ becomes effective with the elapse of ten (16) days from the date of coll)Mission acticn regarding same, without the Mayor exercising a vote. 04T, ATTEST: P cilia A. Thompson, City Cerk PRISCILLA A. THOMPSON CITY CLERK APPROVED- T F i0010 NDR75 VIOTARELLO ATTORNEY W7064:tr:MJC AND CORRECTNESS: �i If the Mayor does not sign this Resolution, it shall become effective at the end of ten calendar days from the date it was passed and adopted. If the Mayor vetoes this Resolution, it shall become effective immediately upon override of the veto by the City Commission. Page 2 of 2 03— 522 r c 00-01-266 CITY OF MIAMI, FLORIDA INTER -OFFICE MEMORANDUM Carlos A. Gimenez July 12, 2001 TO: City Manager Christina P. Abrams, Director FROM: Conferences, Conventions & Public Facilities DATE : Revised Cost Estimates SUBJECT: Coconut Grove Conv Ctr Renovations REFERENCES: ENCLOSURES: FILE : This memo serves to request your authorization to increase the funding allocated for the renovations to the Coconut Grove Convention Center on an emergency basis to $601,400.00. As you are aware, you had previously approved the expedited renovation plan in the amount of $340,000. However, due to several factors including higher than expected prices from paint contractors, ADA requirements, the inclusion of roof work, and the Law Department's request to bring the catwalk up to code following recent litigation against the City of Miami, we are now forced to make this request. I have enclosed photographs of the facility's exterior to emphasize the urgency of these repairs. The majority of these renovations were already planned for the Convention Center, to be completed as CIP funds became available. However, due to continued damage due to water intrusion, wind and use, and with the booking of such high profile events such as the Latin Grammy, we seek to expedite the renovations within a much tighter time line. Construction of the restrooms, and repairs to the parking lot has already begun. Your authorization is urgently needed to complete the remaining phases of the renovation project before the deadline of September 1, 2001. The additional funding is available through the Department's CIP account No. 311010 and CIP 311016. If this request meets with your approval, please indicate said approval via signature below: Approval: _. , , .t. - Date: z 1 e'/ Linda Haskuis, Director, Management & Budget A l rov Dat ar16s A. Gimene - CitX Manager 7ts�: CIP Funding f1 FkR/rPA/C',WW 325006 #170,000 U J -03-255 311010 423,600 VV"OVA--��� 311016 7,800 W7064 #601,400 2 � e 7 a� a@a0V� JUL 19 100{ r.IP n1vl.qRnN1 522 Carlos A. Gimenez City Manager r; Christina P. Abrams, Director Public Facilities Department June 21, 2001 Emergency Renovations of the Restrooms at Coconut Grove Convention Center This memo serves to request your authorization for a modification to the Emergency Finding memo dated June 14, 2001, in which you approved renovations of the existing restrooms at the Coconut Grove Convention Center on an emergency basis. It is absolutely essential that these restrooms be fully renovated before the Latin Grammys event scheduled for September 10, 2001. Time is of the essence and we have been informed that the show's producer will begin the set-up and preparations approximately one week before the event. After reviewing the project schedule, it was determined that there are time constraints and a critical need to have a general contractor on -board immediately to begin working on the demolition and the ordering of long lead-time materials, otherwise, the project cannot be completed before the event. It is recommended that the general contractor who is finishing the City Hall Restrooms Renovations have their existing contract increased to immediately start work on the Convention Center restrooms. The contractor, Professional Contractors, Inc., was selected by a competitive bidding process and is already mobilized in close proximity to the Convention Center. They are fully experienced and have the supervision and ready resources to do restroom renovations. They have performed well and have fully cooperated with City staff on the City Hall project and are prepared to do the same on the Convention Center restroom renovations. The estimated cost and the funding approved in the June 14'" Emergency Finding Memo is sufficient for the project. The Public Works Department has already started work on the construction plans and will be done by Monday June 25'". Public Works has met with the Building Department on the requirements and the expediting of permits. There is only two months to do the renovation of ten (10) restrooms and we propose to begin demolition while the plans and permits are being finalized. The contractor needs to immediately order the time critical materials in order to meet the schedule. The contractor will have to work overtime when necessary and we are confident that these renovations can be completed under the foregoing plan. If this proposal meets with your approval, please indicate by your signature below. APPROVED 2 Date tzen :'�.�.�� •`' City Mana CAG/FK CPA/GW RestroomRtnov-CGCC.doc 03- 522- 00-01-271 CITY OF MIA ;;i F:GR:DA INTER�OPFICE �JE'1W'dRANDUM �YYI r'/•• •. Carlos A. Gimenez oat :. ' June 1, 2001 F. City Manager1�;` Fla. Manuel Artime Center Christina P. Abrams, Director AE=E:;B!,CE5 Conferences, Conventions & Public Facilities �•a^::SUAES This memo serves to request your approval to waive formal bids and proceed with emergency repairs to the Manuel Artime Community Center. Funds are available, and trust be expended this fiscal year, from CDBG Allocation, CIP #322060. Repairs are immediately required to fix damaged floor tile, and install emergency exit stairs at the office building at 970 S.W. 1s` Street, and to outfit doors at the 900 Building'with panic hardware. Additionally, it is necessary to replace handrails, and install a lifter and a handicapped ramp to comply with ADA requirements at the 900 Building and the Theater. These repairs are necessary to ensure the safety of the tenants, guests and visitors to the buildings and the Theater. Other repairs, as outlined on the attached list, are critical to the operation of the buildings to provide uninterrupted service to the tenants, and to ensure the well being and safety of the tenants, visitors and citizens. served by the Manuel Artime Community Center. Please indicate youtjahrov;ilfy signing below. Approved: Director, Community Development Dept. Approved: Manager FKR/CPA/yp . J -03-254 Date: 'AC:4 Date: 0//VG W7063 3— 522 Division: Manuel Ar time Community Center 97o S.W. 1st Street Building Manuel Artime Renovation Existing Air Condition is 20 years old. Coils need to be rephced due to nrst. $ 50,000 "Existing the floor is popping. $ 25.000 " Emergemy Exit Stair $ 30.000 " Waterproof and paint - exterior $ 100.000 " Eliminate broken frets and all lost lamftaping $ 5.000 " Elevator - Frame and doors S 5.000 900 S.W. 1st Street Building & Theater Manuel Artime Renovation Air Condition repair (Theater) Matching Grant Dade $ 95,000 " " installation of a lifter for handicapped used S 25.000 " Replaw all handrails as Per ADA requirements $ 25.000 " Handicapped Ramp at main building entrance S 20.000 " Three double doors (side) with panic hardware S 30.000 " Three new panic hardware $ 10.000 Wood paneling repair at theater S 6.000 " Caulking. aster & paint $ 40.000 "Carpetirig S 8.000 " Gutters and Downspouts $ 25.000 , Theater Marquee $ 50.000 " Theater seats -- S 42.000 Total for Manuel Artime Renovation $ 591,000 1 3-63Yc; g.63Y� B -b3�o 03- 522