RESOLUTION NO. 0 3� 263
A RESOLUTION OF THE MIAMI CITY COMMISSION
AUTHORIZING THE CITY MANAGER'S ENGAGEMENT OF
EDWARDS AND KELLEY, INC., SELECTED FROM THE
LIST OF PRE -APPROVED LIST OF ENGINEERING
FIRMS, APPROVED BY RESOLUTION NO. 02-144, FOR
THE DESIGN DEVELOPMENT PREPARATION OF BIDDING
AND CONSTRUCTION DOCUMENTS, CONSTRUCTION
ADMINISTRATION, AND POST -CONSTRUCTION
ADMINISTRATION CONSULTING SERVICES RELATED TO
THE SOUTHWEST 16TH TERRACE STREET
IMPROVEMENTS PROJECT, AT SPECIFIC COSTS TO BE
DETERMINED BY (1) THE SCOPE OF SERVICES
REQUIRED FOR SAID PROJECT, AND (2) TERMS AND
CONDITIONS SET FORTH IN THE AGREEMENT WITH
EDWARDS AND KELLEY, INC. EXECUTED PURSUANT TO
RESOLUTION NO. 02-144; AUTHORIZING THE CITY
MANAGER TO EXECUTE THE NECESSARY DOCUMENTS,
IN A FORM ACCEPTABLE TO THE CITY ATTORNEY,
FOR SAID PURPOSE; AND ALLOCATING FUNDS IN AN
AMOUNT NOT TO EXCEED $250,000 FOR SERVICES
AND EXPENSES INCURRED BY THE CITY, FROM
CAPITAL IMPROVEMENT PROJECT NO. 341206,
ENTITLED "SOUTHWEST 16TH TERRACE STREET
IMPROVEMENTS."
WHEREAS, the Administration has determined that it requires
the professional assistance of an engineering firm to assist in
the preparation of an action plan and implementation of the
Southwest 16th Terrace Street Improvements project; and
Al
CITY COIUSSION
MEETING OF
MAP, 7 7 2003
Resolutiolu
WHEREAS, it is necessary for the City Manager to negotiate
and execute Professional Services Agreements with Edwards and
Kelcey, Inc., consultants from the list of pre -approved
professional consultants, approved by Resolution No. 02-144; and
WHEREAS, funds for professional consultants and additional
professional services and related expenses in a total amount not
to exceed $250,000 are available from Capital Improvement Project
No. 341206;
NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY
OF MIAMI, FLORIDA:
Section 1. The recitals and findings contained in the
Preamble to this Resolution are adopted by reference and
incorporated herein as if fully set forth in this Section.
Section 2. The City Manager's engagement of Edwards and
Kelcey, Inc., selected from the list of pre -approved professional
consultants, approved by Resolution No. 02-144 is authorized, for
the design development, preparation of bidding and construction
documents, construction administration and post -construction
administration consulting services related to the Southwest 16th
Terrace Street Improvements Project at specific costs to be
determined by (1) the scope of services required for said
Page 2 of 4 03- 263
project, and (2) terms and conditions set forth in the agreement
executed with Edwards and Kelcey, Inc., pursuant to Resolution
No. 02-144, with funds, in an amount not to exceed $250,000 for
services and expenses incurred by the City, allocated from
Capital Improvement Project No. 341206, entitled "Southwest 16th
Terrace, Street Improvements."
Section 3. The City Manager is further authorizedll to
execute the necessary documents, in a form acceptable to the City
Attorney, for said purpose.
Section 4. This Resolution shall become effective
immediately upon its adoption and signature of the Mayoral
�i The herein authorization is further subject to compliance with
all requirements that may be imposed by the City Attorney,
including but not limited to those prescribed by applicable City
Charter and Code provisions.
2i If the Mayor does not sign this Resolution, it shall become
effective at the end of ten calendar days from the date it was
passed and adopted. If the Mayor vetoes this Resolution, it shall
become effective immediately upon override of the veto by the
City Commission.
Page 3 of 4
02a, goo
PASSED AND ADOPTED this 27th day of
ATTEST:
PRISCILLA A. THOMPSON
CITY CLERK
APPROVED
PEE DRO VILARELLO
CI ATTORNEY
W7043:tr:AS:BSS
March
2003
"WELA. , �--
CORRECTNESS
Page 4 of 4
03- 263
CITY OF MIAMI, FLORIDA
INTER -OFFICE MEMORANDUM
CA -21
Honorable Mayor and Members Y��I Dp
TO: of the City Commission
DATE : lY1Qfl � %3 2003 FILE
Resolution Authorizing
SUBJECT: Execution of Professional
(11 Services Agreement for
(1P Consulting Services for
FROM: REFERENCES: SW 16th Terrace, Street
-/ ENCLOSURES: Improvements Project
O Arriola
RECOMMENDATION
it is recommended that the City Commission adopt the attached
Resolution authorizing the City Manager to negotiate and execute, in a
form acceptable to the City Attorney, a Professional Services Agreement
with Edwards and Kelcey, Inc. professional consultants, for professional
services in a total amount not to exceed $250,000.00 for expenses related
to the SW 16th Terrace Street Improvements project.
BACKGROUND
The Department of Capital improvements has analyzed the need to enter
into an agreement with an engineering consultant for the Street
Improvements necessary for the SW 16th Terrace. The project consists of
preparing drawings and specifications for the upgrading of the existing
local drainage system and the improvement of the roadway. Edwards and
Kelcey, Inc. was selected from the Department of Capital Improvements
list of pre -approved consultants. Negotiation for the cost of professional
services, not to exceed $250,000.00, which includes design development,
construction documents, bidding and negotiation phase, administration
of the construction contract, and post construction administration, is
necessary to ensure that the City receives an equitable proposal. Funds
have been identified from CIP project #341206 entitled "SW 16th Terrace
Street improvements" as appropriated by Capital Improvements Ordinance
No. 12280 as amended.
FISCAL IMPACT
None
JA/JC/JBO/EM/em
03.-- 263
Budgetary Impact Analysis
Department Capital Improvements
Commission Meeting Date: March 27, 2003
Title and brief description of legislation or attached ordinance/resolution:
Resolution authorizing_ execution of professional services agreement with Edwards and
Kelcey. Inc. for consulting services for SW 16 Terrace Street Improvements project
1. Is this item related to revenue? NO ;9 Yes ❑ (If yes, skip to item #4)
2. Are there sufficient funds in Line Item?
CIP Project #: 341206
Yes: X Index Code:
(If applicable)
Minor: Amount: $250,000
No: Complete the following information:
3. Source of funds: Amount budgeted in the line item: $
Balance in line item: $
Amount needed in line item: $
Sufficient funds will be transferred from the following line items -
ACTION ACCOUNT NUMBER
TOTAL
Project No./Index/Minor Object
From
$
From
$
To
$
To
$
4. Comments:
Approved by: 30/0 Q-3
Nreirtment Director/Designee IFDate
APPROVALS
V
Budgeting &
Date: 5- 1%-%J
Date -3 _I0 -03
03- 263
February 5, 2003
Transportation
Comrnunications
Building Technologies
Site and Facility Design
Jorge Avino, P.E.
Deputy Director CIP
City of Miami
Department of Capital Improvements
444 SW 2"d Avenue
Miami, Florida 33130
Re: 16 Terrace from SW 24 Ave. to SW 29 Ave.
Civil Engineering Design Services Proposal
Dear Mr Avino:
As requested, I am pleased to provide you with this revised proposal for Professional Civil
Engineering Services, concerning the above referenced project.
The scope of work will consist of the following:
1. EDWARDS & KELCEY, Inc. (EK) will retain the services of High Surveying and
Mapping, Inc. to perform a topographic survey of approximately $2,100 LF of
roadway, based on and in accordance with the scope of Surveying Services and
Within the limits as described and depicted in Exhibit "A�.
2. EDWARDS & KELCEY, Inc. (EK) will retain the services of HR Engineering Services,
Inc. to perform the following services (refer to Exhibit "B"):
• Perform 3 constant head percolation test to 15 feet The test will be performed in general
accordance with SFWMD procedures.
• Perform 3 shallow boring to determine the thickness of the existing pavement and the
subgrade to a depth of 5 feet
• Provide (3) signed and sealed sets of the test report. One signed and sealed copy of the
report will be submitted to the City of Miami, Department of Public Works.
3. EDWARDS & KELCEY, Inc. (EK) will perform the following services:
• EK will submit written request for. utility information (Record as-builts, etc.) to the appropriate
utility agencies, including obtaining available records from the City of Miami Department of
Public Works. EK will review the utility data received, combine with the topographic survey
and prepare the engineering base -drawings required for the engineering design.
• EK will design and prepare the necessary construction documents for either Roadway
Reconstruction and Drainage Improvements, technical specifications and an statement of
probable construction cost estimate required within the project area. EK will provide the
required deliverables to the City of Miami Department of Capital Improvements as required.
• Ek will provide assistance to the City during the Bidding and Award of Contract
7300 North Kendall Drive
Suite 400
Miami, Florida 33156
Voice 305:279.2298 A
Fax 305.2795812 03- X17
WWW-ekcorp.com
Edwards
AN0Kelrey
Jorge Avitio
February 5, 2003
Page 2 of 2
• Ek will provide Construction Administration Services and Field Inspections Services during
the duration of the construction of the project. Note that this proposal assumed six (6) month
construction times. Should this time be extended, then additional funds will be required.
4. EDWARDS & KELCEY, Inc. (EK) is excluding of this task order, the following:
• This proposal does not include hydraulic analysis, modifications or design of the existing
storm outfalls and associated secondary storm system, located upstream or downstream of
the project limits.
• This proposal does not include landscaping, irrigation, and street lighting plans.
• In the event a permitting process fee or printing expenses are incurred, such expenses will
be covered as reimbursable expenses.
• This project does not include any overtime hours during construction. Should this be
required, then additional funds will be required.
• This proposal does not include any surveying during construction and/or field laboratory
testing. Should this be required, then additional funds will be required.
The total Lump Sum fee proposed for our basic services is $244,900.00.
Should you have any questions, or need additional information, please call me.
Sincerely,
EDWARD & KELC C.
uis A. Oli res, P. .
Vice President
Attachments
cc: Edgar Munoz
R.1A*nmWft*bonWROPOSALK:Ny of MamK16 TERRACMd9wawnozMO503 .doe
03263
PREPARED BY EDWARDS 3.CEY. WC FOR QTY Of OAIM DATE 5 -Feb -03
PROJECT NAME. PAVEMENT �OHDITION R94ABIUTATION
SW 16 TERRACE FROM SIN 24 AVE TO SW 29 AVE
ENGINEERING DESIGN SERVICES FILE tUrE: PROPOSAL
TASK HOURS
NO. DESCRIPTION LEAD I DESIGN CADD TOTALS
ENGINEER ENGINEER TECHN.
S60 1 367 1 $33
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
10
11
12
13
1a
u
16
30% CONSTRUCTION DOCUMENTS
Confirm owner's requirements
Verify adherence to design guidelines
Verify 'as built" conditions, as furnished by City of Miami Public
Works and surveyor to field conditions.
Evaluate utility and survey information
Prepare a soils investigation plan
Identify deficiencies in information
Confirm/update site and utility requirements
Identify City of Miami requirements related to this project
Identify bondanes conflicts on the existing drainage system from
existing data
Produce drawing list for all disciplines
List specifications sections and provide preliminary Outline
Specifications to be used in Construction Documents
Expand upon schematic design items
Drainage design.study and computer simulation of proposed
drainage areas
Complete identificationfreview of proposed deviations from
design guidelines. Obtain approvals
Investigate and conform Righ-of--Way clearance requirements
Prepare Outline of Construction Notes
Verify location of existing utilities conflicts, connections, etc.
Prepare Tabulation or Driveways
Prepare Demolition plans identifying all items to be reproved or to
remain within the existing Right-o6Way
Prepare preliminary site layout plan
Prepare preliminary grading and paving concept
Prepare preliminary drainage concepts
Prepare profile plans of existing drainage system
Prepare profile plans of existing utilities system
Prepare Preliminary MOT plans
Prepare statement of probable construction cost
Prepare documents for submittal to City of Miami
TOW Noum
Subtotal
PrkX*2 PropU Monogr:
9VI. CONSTRUCTION DOCUMENTS
3
! 4
i
7
3
4
7
3
6
6
15
3
6
6 I
15
3
I 10
6
19
3
3
6
6
6
I
15
9
3
6
6
15
3
10
1222
13
3
6
6
15
3
10
13
13
3
3
10
6
3
20
Il
6 1
29
3
3
I
6
3
3
3 I
9
3
6
6
15
3
6
6
15
3
6
10
19
3
13
20
36
3
6
2D
29
3
620
29
3
6
20
29
3
6
20 I
29
3
6
20
29
4
24
24
52
6
13 I
19
4
8
12
OB
209
211
306
36,880
$/4.003
$11.603
$3Z456
13
31
32
37.580
Incorporate review comments from 60% C.D.
Confirm oonfonnan ce or identify variations from design
development documents
Verify drainage design of proposed drainage areas
Coordinate Preliminary ScheduWPPhasing Plans
Prepare "ftineenng Construction Notes'
Review fatale of el6sting utilities conflicts, connections. etc.
Review sections showing dimensions, thiclomess and materials
Review Layout Phan with specific dimensions
Review proposed drainage structural details and sections
including miscellaneous items
Review final in sous utility plans
Review profile Plans d proposed and Ming drainage structures
Review Demolition plans identifying all items to be removed or to
remain within the existing Right -d -Way
Review drairlage layout and top elevations
Review final pians and notes
Update statement of probable construction cost
Prepare documents for submittal to City of Miami
Total Hare
Subtata!
Prttlel -W"jsd
TOTAL LABOR COST FOR THIS PIIASE:�� .0�
6 110
20
36
3
6
9
13
20
6
39
3
6
6
15
3
6
6
15
3
6
6
1 15
3
3
3
6
6
6
6
20
15
9
29
3
6
1222
3
6
13
22
3
6
13
22
3
6
10
19
3
6
10
t9
4
6
12
4
6
12
63
1906 10
129
310
SLO40
57.
$7.093
520.041
9
tt 1
19
54,660
TOTAL LABOR COST FOR THIS PHASEI Sgt.691 _I
Pape 1 Propl.lds
03- 263
1009/6 CONSTRUCTION DOCUMENTS
1 Incorporate review comments from 90%. C.D.. submittal
2 Incorporate comments from City. of Miami,. Public Works
3 Finalized technical specifications (Protect Manual)
4 Finalized "Engineehng Construction Notes'
5 Finalize plans readyfor permitting and to be advertised
6 Complete contract documents incorporating review comments
ready for bidding and permitting
7 Submit to. City of Miami Public Works Departrnerlt
8 Coordinate final update to. the statement of probable construction
9 Submit complete contract documents,. fuer. corrected with all prig
comments responded
6 6 10 22
6
6
10
22
6T
6
10
22
6
6
10
22
6
6
10
22
6
6
10
22
6
6
I
12
6
6
546,720
12
6 (
6
59
12
Total Naas: 54 54 80 166
SUbtotat 51,320 53,818 53.300 511,238
Pr-pa4Prolad Nw"W.1 8 1 B 1 9 52.520
TOTAL LABOR COST FOR THIS PHASE $73,758
BIDDING S AWARD OF CONTRACT
1 Pre-bid document 000rdnabon
2 Pre-bid meeting & notes
3 Addendum preparation and distribution
4 Site meeting & coordination
5 Bid distribution & coordination
Total Mous:
SuDtotak
Pdngpa""Jad 10 -09 -
SUS -TOTAL LABOR COST FOR THIS PHASE
CONSTRUCTION ADMINISTRATION AND INSPECTION
SERVICES
1 Pre -construction meeting & notes
2 Contractors schedule review
3 Shop drawing submittal review
4 Construction inspection
5 Monthly. progress report
6 Contractors billing,. Service Orders,. Change Orders
7 As -built services
g Punch list, warranty. document,. final review,. construction
completion
Tonal Ham
St47total:
PProlad Manager.
3U8 -TOTAL LABOR COST FOR THIS PHASE
PROJECT SUMMARY
16 4
a
4
4
8
8
16
s
a
516
a
1 4
6
40
24
16 as
53.200
$1,608
3180 55,889
4
2 1
2 $1,142
8
8
$40.079
4
4
824.891
24
40
St&759NG
516
1 1032 1
206
6
1 24
3152,0e3
8
1 24 1
8
1 16
24
8
24
584
1172
230 2085
546,720
578,524
812.650 8157.894
29
59
12 814,169
I i13Z963 f
TOTAL TOTAL
CONSTRUCTION DOCUMENTS
sob
$40.079
90% CONSTRUCTION DOCUMENTS
310
824.891
CONSTRUCTION DOCUMENTS
188
St&759NG
& AWARD OF CONTRACTas,95oTRUCTION
F
ADMIN STRATTON S ONICES
2oe5
3152,0e3
EDWARDS AND KELCEY INC. $237.420
SURVEYING SERV N' h Mo. 54,800
GEOTECHNICAL ENGINEERING HR bummfn 52819
/ Page 2
TOTAL AMOUNT THIS SERVICE ORDER 5244.909
Propl.xts
03'- 263