HomeMy WebLinkAboutR-03-0185J-03-120 2/03/03 RESOLUTION NO. 03— 185 A RESOLUTION OF THE MIAMI CITY COMMISSION ACCEPTING THE BID OF WILLIAMS PAVING COMPANY, INC., FOR THE PROJECT ENTITLED "COCONUT GROVE STORM SEWER/IMPACT FEE PROJECT, PHASE II, B-5660," IN THE AMOUNT OF $757,001; AUTHORIZING THE CITY MANAGER TO EXECUTE ALL NECESSARY DOCUMENTS, IN A FORM ACCEPTABLE TO THE CITY ATTORNEY, FOR SAID PROJECT; ALLOCATING FUNDS IN THE TOTAL AMOUNT NOT TO EXCEED $904,406.67 ($757,001 TO COVER CONTRACT COSTS PLUS $147,405.67 FOR ESTIMATED EXPENSES INCURRED BY THE CITY), FROM CAPITAL IMPROVEMENT PROGRAM PROJECT NOS. 352213 AND 352208. BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. The bid of Williams Paving Company, Inc. for the project entitled "COCONUT GROVE STORM SEWER/IMPACT FEE PROJECT, PHASE II, B-5660", in the amount of $757,001, is accepted, with funds in the amount not to exceed $904,406.67 ($757,001 to cover contract costs plus $147,405.67 for expenses incurred by the City), allocated from Capital Improvement Program Project Nos. 352213 and 35220. CITY COMMIS On MEETING OLF FFR 7 7 ?0013 Resolution No. 03- 185 Section 2. The City Manager is authorized!' to execute all necessary documents, in a form acceptable to the City Attorney, for said Project. Section 3. This Resolution shall become effective immediately upon its adoption and signature of the Mayor.' PASSED AND ADOPTED this 27th day of February 2003. MANUEL A. DIAZ, MAY ATTEST: PRISCILLA A. THOMPSON / CITY CLERK APPROVED ASS�M A CORRECTNESS:/ CI W690/1:tr:AS:BSS 1/ The herein authorization is further subject to compliance with all requirements that may be imposed by the City Attorney, including but not limited to those prescribed by applicable City Charter and Code provisions. If the Mayor does not sign this Resolution, it shall become effective at the end of ten calendar days from the date it was passed and adopted. If the Mayor vetoes this Resolution, it shall become effective immediately upon override of the veto by the City Commission. Page 2 of 2 03-- 185 CITY OF MIAMI, FLORIDA CA=6 INTER -OFFICE MEMORANDUM To : The Honorable Mayor and Members DATE :FFA Z O 2003 :FILE: B-5660 of the City Com ion SUBJECT : Resolution Awarding Contract r for Coconut Grove Storm Sewer / Impact Fee Project, Phase II. FROM : B-5660 REFERENCES JoArriola leENCLOSURES:f Administrator / City Manager Resolution RECOMMENDATION: It is respectfully recommended that the City Commission adopt the attached resolution accepting the bid of Williams Paving Company, Inc., a company located at 11300 NW South River Drive, Miami, Florida 33130, whose principal is Ron Smith, Vice -President, for "Coconut Grove Storm Sewer / Impact Fee Project, Phase II, B-5660", received December 19, 2003 in the amount of $757,001 Total Bid; authorizing the City Manager to enter into a contract on behalf of the City. BACKGROUND: Amount of Total Bid: $ 757,001 Const. Cost Estimate: $ 1,100,000 % of Cost Estimate: 68.82% Construction Time: 120 Working Days Source of Funds: Project Nos. 352213 & 352208, Annual Appropriations Ordinance, as amended. Minority Representation: 6 Contractors picked up specs ( 2 Hispanic, 0 Black, 0 Female, 4 N/A) 4 Contractors submitted bid (1 Hispanic, 0 Black, 0 Female, 3 N/A) Public Hearings/Notices: No Discussion: The Department of Capital Improvements has evaluated the bids received on December 19, 2002, and determined that the lowest responsible and responsive bid, in the amount of $ 757,001 is from Williams Paving Company, Inc. Funds are available to cover the contract cost, and for such incidental items as postage, blueprinting, advertising, reproduction costs, testing, etc. FISCAL IMPACT: NONE / BUDGETED ITEM 4YA JA/JEP/JRA/MAV 03- 185 Budgetary Impact Analysis 1. Department 05PI -1g 1 �r?O W-W/2W 7(s Division 2. Agenda Item # (f available) 3. Title and brief description of legislation or attach ordinance/resolution: 1�eSaU"-n0'`t CVCQ.V117� 6i90r6 S7�b.Qiy .5Fw�R �1.vosc�` frit IRdT/"G7` .P�,as/s IL -.7W Alt .d S«o 4. 5. 6 ays�"R�+c �i�.✓ OyC .EO �.C'i��/2A7��D�v &AV 0 40 49Y S GV .7 *111Av4r . Is this item related to revenue? NO: v---- YES (If yes, skip to item #7.) Are there sufficient funds in Line Item? YES: Index Code Minor Obj. Code Amount NO: _ Complete the following questions: Source of funds: Amount budgeted in the Line Item $ Balance in Line Item $ Amount needed in the Line Item $ Sufficient funds will he trancferrPrl frnm the fr,ttr,.:,;.,,, 1;—;+— ACTION ;—;*e... ACTION ACCOUNT NUMBER ACCOUNT NAME TOTAL Department of Management and Budget Index/Minor ONect/Pro'ect No. Budget Analyst Director/Designee From 3%e%3c� -7-16-1 35=2\3 P4,) Date From 3l a1301 1560 )3S2--Lt-3 (o.ti5�r yn 7roGresS $ �l 360- ic7 From $ To 3 t 01'30. -1az 3s az. 1=nc-��cao1« c�wlh $ 5 gso.as 7. Any additional comments?((�� PsMot1V,4S kkkocoAed� -Qcov,& C1P 'F-r—SeC-TS Qrc- • 8 n. +a F R EPARTMENT OF MANAGEMENT AND BUDGET USE ONLY Verified by: Verified by: Transfer done by: Department of Management and Budget Budget Analyst Budget Analyst Director/Designee Date Date Date 03- 185 JOB REQUEST DEPARTMENT OF PUBLIC WORKS DATE: 3 / 26 / 2001 REVISED: 8 /29 / 2002 JOB NUMBER: B-5660 PROJECT NAME: COCONUT GROVE STORM SEWER / IMPACT FEE PROJECT, PHASE 11 CIP NUMBER: 352213 and 352208 LOCATION: COCONUT GROVE IMPACT FEE DISTRICT (SEE DESCRIPTION BELOW FOR PROJECT BOUNDARIES) OTHER TYPE: PROJECT MANAGER / EXT. No.: JOSE L LAGO / EXT. 1252 3D n' FEDERAL (C.D.B.G.): ' Q ASSOCIATED DEPARTMENT: PUBLIC WORKS DEPARTMENT S.N.P.B. ASSESSABLE: Q EMERGENCY: COMMISSIONER DISTRICT: 2 BID REQUEST: FORMAL - INFORMAL RESOLUTION No.: DESCRIPTION: THE PROPOSED PROJECT INVOLVES THE CONSTRUCTION OF EXFILTRATION STORMWATER DRAINAGE FOR THE AREA BOUNDED BY SW 26 STREET SW 32 AVENUE SW 28 STREET AND SW 34 AVENUE. THIS PROJECT IS LOCATED WITHIN THE AVALON STORM SEWER BASIN AND IS A CRITICAL COMPONENT OF THE AVALON STORM SEWERS PHASE 1 DRAINAGE SYSTEM CIP# 352208). F NECESSARY. CONTINUE ON THE BAC SCOPE OF SERVICES: PUBLIC WORKS COST OUTSIDE COST (% OF CONST. COST) ADVERTISING $ 800.00 (E) 0.07 % (E) OUTSIDE DESIGN $ 85,120.00 (A) * 8 % (A) TESTINGS / SURVEY / PLAT $ (E) $ 23,925.00 (A) * 2 % (A) P.W. DESIGN & BID DOCUMENTS $ (E) % CONSTRUCTION $ 1,100,000.00 (E) CONSTRUCTION ADMINISTRATION $ 77,000.00 (E) 7 % (E) OTHER $ $ (� 17 % * KUNDE SPRECHER & ASSOCIATE, INC. TOTAL $ 1,286,845.00 (TOTAL ENG. FEE) (E) - ESTIMATE DATES: DESIGN COMPLETION (ESTIMATE) 5 / 2002 CONSTRUCTION COMPLETION (ESTIMATE) 4 / 2003 BUDGET: (TO BE VERIFIED BY THE CIP ADMINISTRATOR) CIP ORDINANCE No. 11705 AND 11839, AS AMENDED FUNDING SOURCES*�C'!\ AMOUNT STORM WATER IMPACT FEES (COCONUT GROVE) (35 213) CXA'r mad $ 612,456.00 STORM WATER UTILITY (352208) O 35� �'$ 674,389.00 $ $ $ * — INCLUDE FUTURE FUNDING SOURCES INFORMATION IF APPLICABLE APPROVED BY: NAME DATE PUBLIC WORKS DIRECTOR JOHN H. JACKSON 2002 ORIGINATED DEPT. DIRECTOR 2002 CIP ADMINISTRATOR PILAR SAENZ 2002 (RUFURN TO PUeua WORKS AFTER SK>MID) ��.......--,�.v....�r w..cvwrwr—a.v.�tiw�aw.sawr—r•• � � - o oEvr REV �OL�B _ i�3- 185 1a" FORMAL BID i COCONUT GROVE STORM SEWER / IMPACT FEE PROJECT PHASE II I Project Number: B-5660 CIP Number: 352213 and 352208 Project Manager: Manny A. Vega / x-1213 Date: 12 / 19/ 2003 Person who received the bids: Manny A. Vega Received at: City's Clerk Office Construction Estimate = $ 1,100,000.00 Time: 10:0o am BIDDER WLLIAMS PAvttro COMPANY, INc. THE REDLAND COMPANY, INC. H & 1 ASPIIALT, INC. OCEAN BAY CONSTRUCTION, INC. ADDRESS 11300 NW SOUTH RIVER DRIVE 23799 SW 167 AVENUE 4310 NW 35-rl1 AVE. 2200 NW 16 STREBI' MIAMI. FLORIDA 33178 HOMESTEAD, FL 33031 MIAMI, FLORIDA 33142 POMPANO BEACH, FL 33069 BID BOND AMOUNT 5.00% 5.00% 5,005% 5.00% IRREGULARITIES MINORITY OWNED N/A N/A YES N/A ITEM No. DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL BASE BID: ITEMS 1 - 29 $ 757,001.00 S 883,956.50 S 962,993.43 $ 1,284,782.50 1 5,000 LF 24" Perforated Corrugated Aluminum Pipe S66.00 $ 330,000.00 $ 103.66 S 518,300.00 $ 107.07 $ 535,350.00 $150.00 $ 750,000.00 2 32 Type "D" Catch Basins with Ifinged Frame & Crate $ 1,661.00 $ 53,152.00 $ 2,223.00 $ 71,136.00 $ 2,955.50 $ 94,576.00 $ 3,000.00 $ 96,000.00 3 27 Type " A " Manholes with sump and City Logo Cover $ 2,781.00 $ 75,087.00 $ 2,308.00 $ 62,316.00 $ 3,598.00 $ 97,146.00 $ 3,370.00 $ 90,990.00 4 2 Type' D-5" Manholes with Sump and City Logo Cover $ 1,661.00 $ 3,322.00 $ 2,308.00 $ 4,616.00 $ 4,005.00 S8,010.00 $ 3,745.00 $ 7,490.00 5 329 LF of 12" Ductile Iron Pipe $ 46.00 $ 15,134.00 $ 41.00 $ 13,489.00 $ 80.10 $ 26,352.90 $ 80.00 $ 26,320.00 6 54 LF of 16 " Ductile Iron Pipe $ 56.00 $ 3,024.00 $ 90.00 $ 4,860.00 $ 137.51 $ 7,425.54 $ 125.00 $ 6,750.00 7 497 LF of 15 " Non -perforated Corrugated Aluminum Pipe $ 43.00 $ 21,371.00 $ 38.50$ 19,134.50 $29.37 $ 14,596.89 S 62.50 $ 31,062.50- 8 580 LF of 24" Non -Perforated Corrugated Aluminum Pipe $ 56.00 $ 32,480.00 $ 38.50 $ 22,330.00 $ 42.72 $ 24,777.60 $ 75.00 $ 43,500.00 9 10 LF of 36 " Non -Perforated Corrugated Aluminum Pipe $ 106.00 $ 1,060.00 S 150.00 $ 1,500.00 $ 66.75 $ 667.50 $ 187.00 $ 1,870.00 10 Removal and Disposal of 2 existing storm sewer structures $ 388.00 $ 776.00 $ 1,000.00 $ 2,000.00 $ 345.00 $ 690.00 $ 1,000.00 $ 2,000.00 11 Removal and Disposal of 90 Linear Feet of--'--' storm $ 18.00 $ 1,620.00 $ 10.00 $ 900.00 $ 9.20 $ 828.00 $ 3.0.00 $ 2,700,00 sewer pipes 12 Mill 4,000 SY of 1" thick "Type S-111" Asphallic Concrete $ 3.45 $ 13,800.00 $ 2.00 $ 8,000.00 $ 3.80 $ 15,200.00 $ 4.00 $ 16,000.00 13 Construct 4,000 SY of 1" thick "Type S•111" Asphaltic Concrete $ 3.45 $ 13,800.00 S 4.25 $ 17,000.00 $ 5.75 $ 23,000.00 $ 5.00 $ 20,000.00 14 Construct 100 SY of 1" "type S•111" and new 8 " limerock base • $ 44.40 $ 4,440.00 $ 25.00 $ 2,500.00 $ 25.30 $ 2,530.00 $ 50.00 $ 5,000.00 IRREGULARITIES LEGEND IT HAS BEEN DETERMINED BY THE DEPARTMENT OF PUBLIC WORKS THAT THE A - No Power-of-Attomey LOWEST RESPONSIBLE AND RESPONSIVE BID IS FROM B - No Affidavit as to Capital & Surplus of Bonding Company C - Corrected Extensions WILLIAMS PAVING COMPANY, FOR THE TOTAL AMOUNT OF S 757,001.00 INC. D - Proposal Unsigned or Improperly Signed or no Corporate Seal E - Incomplete Extensions F - Non - responsive bid If the above contractor is not the lowest bidder explain G - Improper Bid Bond H - No Certificate of Competency Number I - No First Source Hiring Compliance Statement / J - No Minority Compliance Statement K - No Duplicate Bid Proposal , L -- No City Occupational License SHL'E•f 101: 2 C.� FORMAL BID COCONUT GROVE STORM SEWER / IMPACT FEE PROJECT PHASE II Project Number: B-5660 CIP Number: 352213 and 352208 Project Manager: Manny A. Vega / x-1213 Date: 12 / 19/ 2003 Person who received the bids: Manny A. Vega Received at: City's Clerk Office Construction Estimate = $ S 1,100,000.00 Time: 10:00 am BIDDER WILLIAMS PAVING COMPANY, INC. THE REDLAND COMPANY, INC. H & J ASPHALT, INC. OCEAN BAY CONSTRUCTION, INC. ADDRESS tUOaW SOunI RIVER DRIVE 23799 SW 167 AVE. 4310 NW 35TH AVE. 2200 NW 1691'REFf MIAMI. FLORIDA 3317$ HOMESTEAD, FL 33031 MIAMI, FLORIDA 33142 POMPANO BEACH, FL 33069 BID BOND AMOUNT 5.00% 5.00"1. 5.000% 5.00% IRREGULARITIES MINORITY OWNED N/A N/A YES N/A UNIT UNIT UNIT UNIT ITEM No. DESCRIPTION PRICE TOTAL PRICE TOTAL PRICE TOTAL PRICE TOTAL Is Construct 100 SY of 1 - Type Type S-111" and e • limerock base $ 43.28 $ 4,328.00 $ 25.00 $ 2,500.00 $ 32.20 $ 3,220.00 $ 40.00 $ 4,000.00 16 Construct 100 SF of 4 " thick Concrete Sidewalk $ 4.52 $ 452.00 $ 25.00 $ 2,500.00 $ 5.75 $ 575.00 $ 10.00 $ 1,000.00 17 Construct 200 SF of 6 " tWck Concrete Driveway Sidewalk $ 4.52 $ 904.00 $25.00 $ 5,000.00 $ 7.04 $ 1,408.00 $ 20.00 $ 4,000.00 le Install 1000 SF of additional St. Augustine solid sod $ 25.00 $ 25,000.00 $ 1.00 $ 1,000.00 $ 8.05 $ 8,050.00 $ 7.00 $ 7,000.00 19 Construct 50 LF of Cast Iron Pipe or 6" AW WA C900 PVC $ 33.00 $ 1,650.00 $ 75.00 $ 3,750.00 $ 59.80 $ 2,990.00 $ 50.00 $ 2,500.00 20 Remove and dispose - 5 trees from T to 20' in height $ 408.00 $ 2,040.00 $ 350.00 $ 1,500.00 $ 240.00 $ 1,200.00 S1,000.00 $ 5,000.00 21 Relocate - 70 existing trees, T to 20' in height $1,035.00 $ 72,450.00 $ 350.00 $ 24,500.00 $ 330.00 $ 23,100.00 $ 1,000.00 S 70,000.00 22 Survey Work $ 7,015.00 $ 25,500.00 $ 3,000.00 S 15,000.00 23 9 core drills to any structures $ 505.00 $ 4,545.00 $ 500.00 $ 4,500.00 $ 250.00 $ 2,250.00 $ 500.00 $ 4,500.00 24 3 testholes $ 775.00 $ 2,325.00 $ 250.00 $ 750.00 $ 150.00 $ 450.00 $ 200.00 $ 600.00 25 2 plugs $ 233.00 $ 466.00 $ 500.00 $ 1,000.00 $ 50.00 $ 100.00 $ 500.00 $ 1,000.00 26 200 CY of rockbed $ 15.60 $ 3,120.00 $ 10.00 $ 2,000.00 $ 20.00 $ 4,000.00 $ 30.00 $ 6,000.00 27 100 LP of overcut for 12•,15",161, 24" and/or 36" pipe at any cut $ 30.50 $ 3,050.00 $ 10.00 $ 1,000.00 $ 10.00 $ 1,000.00 S30.00 $ 3,000.00 28 5 Tons of Type "A• asphaltic concrete plant mix $ 118.00 $ 590.00 $ 75.00 $ 375.00 $ 100.00 $ 500.00 $ 300.00 S1,500.00 29 Special Provisions $ 60,000.00 $ 60,000.00 $ 60,000.00 $ 60,000.00 • IRREGULARITIES LEGEND IT' HAS BEEN DETERMINED BY THE DEPARTMENT OF PUBLIC WORKS THAT -I'm A - No Power - of- Attorney LOWEST RESPONSIBLE AND RESPONSIVE BID IS FROM WILLIAMS PAVING COMPANY, INC. B -- No Affidavit as to Capital & Surplus of Bonding Company FOR THE TOTAL AMOUNT OF S 757,001.00 C - Corrected Extensions D - Proposal Unsigned or Improperly Signed or no Corporate Seal E - Incomplete Extensions It the above contractor is not the lowest bidder explain: F - Non - responsive bid G - Improper Bid Bond H - No Certificate of Competency Number 1 - No First Source Hiring Compliance Statement J - No Minority Compliance Statement K - No Duplicate Bid Proposal L - No City Occupational License SHEET 2 OF 2 FACT SHEET DEPARTMENT OF CAPITAL IMPROVEMENTS DATE: 1 / 21 / 2003 JOB NUMBER: B-5660 PROJECT NAME: COCONUT GROVE STORM SEWER / IMPACT FEE PROJECT PHASE 11 CIP NUMBER: 352213 & 352208 LOCATION: COCONUT GROVE IMPACT FEE DISTRICT SEE DESCRIPTION BELOW FOR PROJECT BOUNDA OTHER TYPE: PROJECT MANAGER / EXT. No.: MANNY A. VEGA , EXT. 1213 FEDERAL (C.D.B.G.): Q ASSOCIATED DEPARTMENT: CAPITAL IMPROVEMENTS S.N.P.B. Q ASSESSABLE: Q EMERGENCY: Q COMMISSIONER DISTRICT: 2 BID REQUEST: FORMAL = INFORMAL Q RESOLUTION No.: DESCRIPTION: THE PROPOSED PROJECT INVOLVES THE CONSTRUCTION OF EXFILTRATION STORMWATER DRAINAGE FOR THE AREA BOUNDED BY SW 26TH STREET, SW 28TH STREET AND 34TH AVE. THIS PROJECT IS LOCATED WITHIN THE AVALON STORM SEWER BASIN AND IS A CRITICAL COMPONENT OF THE AVALON STORM SEWER PHASE i DRAINAGE SYSTEM CIP # 352208 OF NECESSARY, COMINUE ON THE BACK) SCOPE OF SERVICES: PUBLIC WORKS COST OUTSIDE COST (x of CONST. cosi ADVERTISING $ 510.62 (E) OUTSIDE DESIGN $ 85,120.00 TESTINGS / SURVEY / PLAT $ (E) $ 23,925.00 (E) C.I. DESIGN & BID DOCUMENTS $ % CONSTRUCTION S 757,001.00 (BID) CONSTRUCTION ADMINISTRATION S 37,850.05 5.00 % OTHER: $ (E) $ (E) 5.00 % (E) - ESTIMATE TOTAL $ 904,406.67 (TOTAL ENG. FEE) ESTIMATED CONST. COST $ 1,100,000.00 CONTRACTOR'S INFORMATION: CLASS: = = 0 NON - MINORITY _ TYPE OF WORK PAVING, GRADING & DRAINAGE MINORITY QB Q QF YEARS OF ESTABLISHMENT: 43 YEARS LICENSE E-2313 NAME: WILLIAMS PAVING COMPANY, INC. TELEPHONE: 305-882-1950 ADDRESS: 11300 NW SOUTH RIVER DRIVE CITY, STATE, ZIP: MIAMI, FLORIDA 33178 CLASS: J = JOINT P = PRIME S = SUB CONTACT PERSON: RON SMITH, VICE-PRESIDENT MINORING B = BLACK H = HISPANIC F = FEMALE SUB -CONTRACTORS: NAMES: PAN AMERICAN ARAZONA BROTHERS GORES: ASSISTANT DIRECTORS, COSTANALYSIS, FAJE, ASSOCIATED DEPT, CIP MANAGER REV. 19M 03- 185