HomeMy WebLinkAboutR-03-0108J-03-073
1/14/03 03- 108
RESOLUTION NO.
A RESOLUTION OF THE MIAMI CITY COMMISSION BY
A FOURTH -FIFTHS (4/5T11) AFFIRMATIVE VOTE,
RATIFYING, APPROVING AND CONFIRMING THE CITY
MANAGER'S FINDING OF AN EMERGENCY AND
AUTHORIZING AN INCREASE IN THE CONTRACT
AMOUNT WITH METRO EXPRESS, INC., TO COVER
COSTS FOR ADDITIONAL WORK ON THE PROJECT
ENTITLED "CITYWIDE CURB REPLACEMENT PROJECT
2001, B-4646," IN AN AMOUNT NOT TO EXCEED
$230,000, INCREASING THE TOTAL CONTRACT
AMOUNT FROM $77,750 TO $307,750; ALLOCATING
FUNDS FROM CAPITAL IMPROVEMENT PROGRAM, IN
THE AMOUNT NOT TO EXCEED $60,000 FROM
PROJECT NO. 341170, $70,000 FROM PROJECT
NO. 341182 AND $100,000 FROM PROJECT
NO. 341183.
BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI,
FLORIDA:
Section 1. By a four-fifths (4/5tns) affirmative vote,
the City Manager's finding of an emergency and authorizing an
increase in the contract amount with Metro Express, Inc., to
cover costs for additional work on the project entitled
"Citywide Curb Replacement Project 2001, B-4646", in an amount
not to exceed $230,000, increasing the total contract amount
from $77,750 to $307,750, is ratified, approved and confirmed,
a"olution No.
03- 108
with funds allocated from Capital Improvement Programs, in an
amount not to exceed $60,000 from Project No. 341170, $70,000
from Project No. 341182, and $100,000 from Project No. 341183.
Section 2. This Resolution shall become effective
immediately upon its adoption and signature of the Mayor.11
PASSED AND ADOPTED this 23rd
ATTEST:
PRISCILLA A. THOMPSON
CITY CLERK
APPROVED
LLO
848:tr:AS
day of January 2003.
O;WW4014•
EL A. DIAZ, MAYO?��
AND CORRECTNESS : l
1� If the Mayor does not sign this Resolution, it shall become
effective at the end of ten calendar days from the date it was
passed and adopted. If the Mayor vetoes this Resolution, it
shall become effective immediately upon override of the veto by
the City Commission.
Page 2 of 2
03- 108
CITY OF MIAMI, FLORIDA 1!9
INTER -OFFICE MEMORANDUM
TO
The Honorable Mayor and
Memlaers of the City Commission
FROM : ime Z
City Manag Chief Executive Officer
RECOMMENDATION.
DATE: JAV4 14 2003 FILE:
SUBJECT: Emergency increase to Project —
Citywide Curb Replacement Project 2001,
B-4646.
REFERENCES:
ENCLOSURES:
It is respectfully recommended that the City Commission adopt the attached Resolution ratifying
the City Manager's written finding that a valid emergency exists concerning the condition of the
curbs at locations citywide, and authorizing an increase in the contract with Metro Express, Inc.,
pursuant to Resolution No. 02-351, adopted April 11, 2002, in an amount not to exceed
$230,000, from $77,750 to $307,750, for additional work on the project entitled "Citywide Curb
Replacement Project 2001, B-4646". Funds are allocated under Project No. 341170 in the
amount of $60,000, Project No. 341182 in the amount of $70,000, and Project No. 341183 in
the amount of $100,000, as appropriated by the Annual Appropriations and Capital
Improvement Project Ordinances, as amended.
BACKGROUND
Based on a field investigation by our inspector and on the number of requests for curb and curb
and gutter replacement at locations citywide, I have found that an EMERGENCY exists
concerning the condition of the concrete curbing which justifies increasing the contract for this
project. In addition, it is imperative that we proceed with this increase in contract to replace the
sidewalk pavers on McFarlane Road, South Side in order to improve pedestrian safety.
FISCAL IMPACT
NONE- BUDGETED ITEM.
�25 _,w4
EP/JRA/EE/ee
03- 108
Budgetary Impact Analysis
1. Department of _CAPITAL IMPROVE NTS Division
2. Agenda Item # (if available)
3. Title and brief description of legislation or attach ordinance/resolution:
RATIFICATION — EMERGENCY FINDING CITYWIDE CURB B - 4 li `t L-
4. Is this item related to revenue? NO: YES (If yes, skip to item #7.)
5. Are there sufficient funds in Line Item?
YES: _ Index Code Minor Obj. Code Amount
NO: _ Complete the following questions:
0
Source of funds: Amount budgeted in the Line Item $_
Balance in Line item $
Amount needed in the Line Item $
C„4T. , -t f—Ac drill ho transferred frnrn the fnllnwinQ line items -
ACTION ACCOUNT NUMBER
ACCOUNT NAME TOTAL
Index/Minor Object/Project No.
Verified by:
From
$
From
$
From
$
To
$
7. Any additional comments?
n.i to x1- 3411-70 lon. ow I Ctp# 3411 g3 kID0,cool CrP # 3 Ljj1 9-.Z J% 1.714N . $�
1:70aae n e e.
Ampa;iks Fwcavns, fw 01l o,00v abler 7c, DOC)
8. Appr ve ho"e'i M%eef .— Y 8,07✓ �crceL - .
r 1
/ItUnartMpnt Dire&Ar/Desimee r I Date
FOR DEPARTMENT O'k MANAGEMENT
AND BUIMET USE ONLY
Verified ley:
Verified by:
Transfer done by:
Department of Management and Budget
Budget Analyst
Budget Analyst
Director/Designee
Date
Date
Date
03- 108
CITY OF MIAMI, FLORIDA
INTER -OFFICE MEMORANDUM
TO : Carlos A. Gimenez ZGG2 Noy -4 PH 1' *TE:
City Manager i• ; kkK�
�4i I , ;;; SUB.IECT
ciii OF MIAMI, FLA.
FROM: REFERENCES:
John H. Jac son, Director ENCLOSURES:
Public Works Department
cljy figN
October 29, 2002 uL j 3/ 40 11:03
FIL
EMERGENCY FINDING
Increasing Amount of Contract
with Metro Express, Inc. for 8-4646
8/1/02 & 9/12/02 Memos
This is an amendment to previous EMERGENCY FINDING increasing the amount of
the contract with Metro Express, Inc. for the sidewalk and curb and gutter replacements
at Citywide locations. The amount of this increase in contract is for $100,000, bringing
the total amount of the contract with Metro Express to $307,750.
It is imperative that we proceed with this increase in contract to replace the sidewalk
pavers on McFarlane Road, South side. The area has been demolished due to a joint
City/County project to rebuild McFarlane Road from Main Highway to South Bayshore
Drive. The City's contribution to this project is the replacement of the sidewalk pavers
at the South side of the roadway.
This increased amount of $100,000 is funded from Capital Improvement Project No.
341183. Prior increases in this contract are funded as follows from Capital
Improvement Project Nos. 341170 ($60,000) and 341182 ($70,000). This increase,
along with the prior increases, shall be ratified at the next available City Commission
meeting.
ve Date: M
VAL: r,,iiIrc0-6A1 Pen , Acti irector
anagement udget partment
Y/p vaav,
Approved: Date:
City Manager
off^.
FKR/JHJ/JRA/LJH/EE
c: Michael A. Rath, Acting Director, Purchasing Department
Jorge R. Avino, Deputy Director, CIP Department
C:1My DocumentsUW-EMERGENCY-METRO EXPRESS B4646.doc
INTER -OFFICE MEMORANDUM CITY MANAGERS OFFICE
Carlos A. Gimenez - September 92, X002' o �'�� g�
. - - = FlL=
City Manager
Emergency Finding Increasing
/ amount of contract with Metro
,,� f¢ Express, Inc. for B-4646
ohn H. JacV on, Director
Public Works Department --- --
Based on a field investigation by our inspector and on the number of requests for curb
and * curb and gutter replacement at locations citywide, I have found that an
EMERGENCY exists concerning the condition of the concrete curbing which justifies
increasing the contract of Metro Express, Inc., a Hispanic minority control corporation
with offices at 3594 SW 1.43 Court, Miami, Florida, 33175, by $130,000, from $ 77,750,
to $ 207,750.
Due to the hazardous condition of the concrete curbs at several locations citywide, it is
necessary that additional work be performed regarding replacement of concrete curb
and curb and gutter in order to improve safety within our neighborhoods.
This emergency increase of $130,000 to B-4646, is necessary in order to keep the curbs
and curb and gutters within the City of Miami in good condition and to protect the heath,
safety and welfare of residents and the public. This increase is funded from Capital
Improvement Project Nos. 341170 and 341182. This action shall be ratified at the next
available City Commission meeting.
PR9 AL: Date:
2J C►P 3�ii7o (PG,oaD i�e�� Pen , Acti irector
ature ate CIP 70) 05c Manageme & Bud
ac, oco
Approved. Date: -5 y
� C Manager nez
FKR/JHJ/JRA/LJH/EE
9rlZf�4Y '
c: Frank K. Rollason, Assistant City Manager
Judy S. Carter, Chief Procurement Officer, Purchasing Department
Jorge R. Avino, Assistant Director, Public Works Department
SEP 16'02 PM2:42
s:
03- 108
A
B-4646
File: \\DATASERVER2 5\BLDIST\PUB WORK\0341180.REQ
PGM ID: FN/SC/PO/RPT10
C I T Y O
F M I A M I
PAGE
10- 1625
RUN DATE: 12/14/2002
DETAILED REVENUE AND
EXPENDITURES BY PROJECT
RPT RFC:REPORT 10
04
03 FISCAL MONTH
AS OF 12/13/2002
Q
FUND 341 STREETS & SIDEWALKS
PROJECT 341182 REBUILD SIDEWALKS AND STREETS FY2002-2005
ENTITLEMENT PERIOD 09/30/01 TO 09/30/02
PORTION EXPIRED 875.0 %
STATUS ACTIVE
INDEX MIN
% OF
REVISED
* * * REVENUES / EXPENDITURES
* * *
OUTSTANDING
REMAINING
CODE OBJ DESCRIPTION BUDGET
TOTAL BUDGET
CURR MONTH CURR Y -T -D
TOTAL T -D
ENCUMBRANCE
BALANCE
R E V E N U E S
02F'32 REV. CAP. PROJ.- FD. 32 - PROJ
473 LOCAL OPTION GAS TAX
61.8
400,000
247,381
152,618
INDEX CODE 026132
61.8
400,000
247,381
152,618
TOTAL REVENUES
61.8
400,000
247,381
152,618
E X P E N D I T U R E S
319201 DESIGN/ARCH ORIJ. NO. REQUIRED
240 PROFESSIONAL SERVICES - ENGINE
5,637
5,637
287 ADVERTISING
62.2
2,000
1,245
754
INDEX CODE 319201
16.3
7,637
1,245
6,391
319301 CONSTRUCTION PROJ. NO. REQUIRE
792 ENGINEERING - PUBLIC WORKS
39.3
15,760
6,2089,551j-l(V�1:.
860 CONSTRUCTION IN PROGRESS
85.2
376,603
79,529
319,456
1,749
55,401
INDEX CODE 319301
83.4
392,363
79,529
325,665
1,744
64,953
TOTAL EXPENDITURES
82.1
400,000
79,529
326,910
1,744
71,345
RECAP: REVENUES LESS EXPENDITURES
79,529-
79,529 -
Page: 1
File: \\DATASERVER2 5\BLDIST\PUB WORK\0341180.REQ
PGM ID: FN/SC/PO/RPT10 C I T Y O F M I A M I PAGE 10- 1623
RUN DATE: 12/14/2002 DETAILED REVENUE AND EXPENDITURES BY PROJECT RPT RFC:REPORT 10
03 FISCAL MONTH AS OF 12/13/2002
FUND
341 STREETS & SIDEWALKS
PROJECT
341170 CITYWIDE STREET IMPROVEMENTS -
FY'96-FY'99
ENTITLEMENT
PERIOD 12/06/94 TO 12/31/55
PORTION EXPIRED 13.1 %
STATUS
ACTIVE
INDEX
MIN
% OF
REVISED
* * * REVENUES / EXPENDITURES * * *
OUTSTANDING
REMAINING
CODE
OBJ DESCRIPTION BUDGET
TOTAL BUDGET
CURR MONTH CURR Y -T -D TOTAL T -D
ENCUMBRANCE
BALANCE
R E
V E N U E S
026132
REV. CAP. PROJ.- FD. 32 - PROJ
473 LOCAL OPTION GAS TAX
86.1
2,423,400
2,088,458
334,941
662 FIND FY96-97 WATERWYS ASST PR
99.3
12,400
12,325
75
706 CONTR. FR. COCONUT GR. TRU. FD
100.0
25,000
25,000
INDEX CODE 026132
86.3
2,460,800
2,125,783
335,016
TOTAL REVENUES
86.3
2,460,800
2,125,783
335,016
E X
P E N D I T U R E S****
319201
DESIGN/ARCH ORIJ. NO. REQUIRED
240 PROFESSIONAL SERVICES - ENGINE
88.3
210,794
176,237
10,073
24,483
281 ADVERTISING
100.5
7,200
7,241
41-
792 ENGINEERING - PUBLIC WORKS
101.4
32,416
32,873
457-
835 LANDSCAPING
99.9
11,089
11,079
10
INDEX CODE 319201
90.8
261,499
227,431
10,073
23,993
wp oto H efyo CY pf'65S
319301
CONSTRUCTION PROJ. NO. REQUIRE
tp
792 ENGINEERING - PUBLIC WORKS
83.5
123,838
103,473
/
20,364 8 , q b L4
860 CONSTRUCTION IN PROGRESS
90.3
2,066,463
1,789,845
77,151'
199,466
INDEX CODE 319301
89.9
2,190,301
1,893,319
77,151
219,830
589301
CONSTRUCTION - PROJ # REQUIRED
860 CONSTRUCTION IN PROGRESS
55.9
9,000
5,032
3,967
INDEX CODE 589301
55.9
91000
5,032
3,967
TOTAL EXPENDITURES
89.9
2,460,800
2,125,783
87,225
247,791
RECAP: REVENUES LESS EXPENDITURES
Page: 1
File: \\DATASERVER2 5\BLDIST\PUB WORK\0341180.REQ
PGM ID: FN/SC/PO/RPT10
C I T Y O
F M I A M I PAGE 10- 1626
374,547
RUN DATE: 12/14/2002
DETAILED REVENUE AND
EXPENDITURES BY PROJECT RPT RFC:REPORT 10
REV. CAP. PROJ.- FD. 32 - PROJ
33,862-
03 FISCAL MONTH
AS OF 12/13/2002
436
CONTR FROM SPECIAL REVENUE FUN
100.0
303,600
FUND 341 STREETS & SIDEWALKS
LOCAL OPTION GAS TAX
8.2
PROJECT 341183 CITYWIDE STREET
IMPROVEMENTS FY2001-2005
INDEX CODE 026132
ENTITLEMENT PERIOD 09/30/00 TO
09/30/01
TOTAL
PORTION EXPIRED 775.0 %
11.3
8,836,400
E X
STATUS ACTIVE
D I T U R E S
319201
DESIGN/ARCH ORIJ. NO. REQUIRED
INDEX MIN
% OF REVISED
* * * REVENUES / EXPENDITURES * * * OUTSTANDING REMAINING
PROFESSIONAL SERVICES - ENGINE
CODE OBJ DESCRIPTION
BUDGET TOTAL BUDGET
CURR MONTH CURR Y -T -D TOTAL T -D ENCUMBRANCE BALANCE
270
R E
V E N
U E S * * * *
374,547
33,862
0?" 32
33,862
REV. CAP. PROJ.- FD. 32 - PROJ
33,862-
33,862-
436
CONTR FROM SPECIAL REVENUE FUN
100.0
303,600
473
LOCAL OPTION GAS TAX
8.2
8,532,800
INDEX CODE 026132
11.3
8,836,400
TOTAL
REVENUES
11.3
8,836,400
E X
P E N
D I T U R E S
319201
DESIGN/ARCH ORIJ. NO. REQUIRED
240
PROFESSIONAL SERVICES - ENGINE
105.8
763,935
270
PROFESSIONAL SERVICES - OTHER
100.0
1,600
287
ADVERTISING
75.4
2,000
792
ENGINEERING - PUBLIC WORKS
100.0
3,637
INDEX CODE 319201
105.7
771,172
319301
CONSTRUCTION PROJ. NO. REQUIRE
792
ENGINEERING - PUBLIC WORKS
85.2
29,863
860
CONSTRUCTION IN PROGRESS
8.1
8,035,365
INDEX CODE 319301
8.4
8,065,228
TOTAL
EXPENDITURES
16.9
8,.836,400
RECAP:
REVENUES LESS EXPENDITURES
Page: 1
303,643
702,234
1,005,877
1,005,877
632, 984
1,600
1,508
3,637
639,730
175,562
43-
7,830,565
7,830,522
7,830,522
44,612-
491
175,562 44,120-
IVO,
4,120-ff7U, (91'0 i%A e IYU t')t
/ 4,401
282,166 7,378,651
282,166 7,383,052
457,728 7,338,932
25,462
33,862
374,547
33,862
400,009
33,862
1,039,739
33,862-
33,862-
175,562
43-
7,830,565
7,830,522
7,830,522
44,612-
491
175,562 44,120-
IVO,
4,120-ff7U, (91'0 i%A e IYU t')t
/ 4,401
282,166 7,378,651
282,166 7,383,052
457,728 7,338,932