Loading...
HomeMy WebLinkAboutO-12390J-03-062 1/10/03 1.2390 ORDINANCE NO. AN ORDINANCE OF THE MIAMI CITY COMMISSION, WITH ATTACHMENT, AMENDING ORDINANCE NO. 10544, AS AMENDED, THE FUTURE LAND USE MAP OF THE COMPREHENSIVE NEIGHBORHOOD PLAN BY CHANGING THE LAND USE DESIGNATION OF THE PROPERTIES LOCATED AT APPROXIMATELY 536, 602, 608 AND 690 NORTHWEST 57TH AVENUE AND 601, 605, 611, 631 AND 641 NORTHWEST 57TH COURT, MIAMI, FLORIDA, FROM "SINGLE FAMILY RESIDENTIAL" AND "GENERAL COMMERCIAL" TO "RESTRICTED COMMERCIAL;" MAKING FINDINGS; DIRECTING TRANSMITTALS TO AFFECTED AGENCIES; CONTAINING A REPEALER PROVISION AND A SEVERABILITY CLAUSE; AND PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, the Miami Planning Advisory Board, at its meeting of November 20, 2002, Item No. 1, following an advertised hearing, adopted Resolution No. PAB 82-02 by a vote of six to two (6-2), RECOMMENDING APPROVAL of amending Zoning Ordinance No. 10544 as hereinafter set forth; and WHEREAS, the City Commission after careful consideration of this matter deems it advisable and in the best interest of the general welfare of the City of Miami and its inhabitants to amend Ordinance No. 10544 as hereinafter set forth; NOW, THEREFORE, BE IT ORDAINED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: 12390 Section 1. The recitals and findings contained in the Preamble to this Ordinance are adopted by reference and incorporated as if fully set forth in this Section. Section 2. The Future Land Use Map of Ordinance No. 10544, as amended, the Miami Comprehensive Neighborhood Plan 1989-2000, is amended by changing the land use designation from "Single Family Residential" and "General Commercial" to "Restricted Commercial" for the properties located at approximately 536, 602, 608 and 690 Northwest 57th Avenue and 601, 605, 611, 631 and 641 Northwest 57th Court, Miami, Florida, more particularly described in Exhibit "A" attached to and made a part of this instrument. Section 3. It is found that this Comprehensive Plan designation change: (a) is necessary due to changed or changing conditions; (b) involves a residential land use of 10 acres or less and a density of fewer than 10 units per acre or involves other land use categories, singularly or in combination with residential use, of 10 acres or less and does not, in combination with other changes during the last year, produce a cumulative effect of having changed more than 60 acres through the use of "Small Scale development" procedures; Page 2 of 5 12390, (c) is one which involves property that has not been the specific subject of a Comprehensive Plan change within the prior twelve months; (d) is one which does not involve the same owner's property within 200 feet of property that has been granted a Comprehensive Plan change within the prior twelve months; (e) does not involve a text change to goals, policies, and objectives of the local government's comprehensive plan, but proposes a land use change to the future land use map for a site-specific development; and (f) is one which is not located within an area of critical state concern. Section 4. The City Manager is directed to instruct the Director of the Planning and Zoning Department to immediately transmit a certified copy of this Ordinance after its adoption on second reading to: the Secretary, Florida Department of Community Affairs; the Executive Director, South Florida Regional Planning Council, Hollywood, Florida; the Executive Director, South Florida Water Management District, West Palm Beach, Florida; the Secretary, Department of Transportation, Tallahassee, Florida; and the Executive Director, Department of Environmental Protection, Tallahassee, Florida. Page 3 of 5 1.2390 Section 5. All ordinances or parts of ordinances insofar as they are inconsistent or in conflict with the provisions of this Ordinance are repealed. Section 6. If any section, part of section, paragraph, clause, phrase, or word of this Ordinance is declared invalid, the remaining provisions of this Ordinance shall not be affected. Section 7. This Ordinance shall become effective thirty- one (31) days after second reading and adoption thereof pursuant and subject to § 163.3187 (3) (c) , Fla. Stat. (2001) ." PASSED ON FIRST READING BY TITLE ONLY this 22nd day of May , 2003. 1� This Ordinance shall become effective as specified herein unless vetoed by the Mayor within ten days from the date it was passed and adopted. If the Mayor vetoes this Ordinance, it shall become effective immediately upon override of the veto by the City Commission or upon the effective date stated herein, whichever is later. Page 4 of 5 P 19 (i PASSED AND ADOPTED ON SECOND AND FINAL READING BY TITLE ONLY this 17th day of July , 2003. ATTEST: PRISCILLA A. THOMPSON CITY CLERK AND CORRECTNESS: APPROVED AS N W138V:GKW: Page 5 of 5 MANUEL A. DIAZ, MA 12.19 o 690 NW 57 Avenue. 602-08 NW 57 Avenue, 601 NW A7 Coutt,...536 NW 57 Avenue. 805 NW 67 Court, 641 NW 67 Court�531 NW 57 Court. 611 NW 57_Court Application for Comprehensive Neighborhood Plan Amendment and Rezoning to allow the development of an Eckerd's store in accordance with the site plans entitled "Store No. 00908 Eckerd Corporation" as prepared by Kent D. Hamilton, A.I.A., Architect. The purpose of this letter is to express my support for the above referenced applications. I have reviewed the site plan for the development and i believe that it is compatible with the neighborhood. Accordingly, I ask that you reconsider the approval the applications. ADDRESS PHONE NUMBER z(.,5 -15z -,z s'> C -T (-3 ©s> 2 0 71 ALJ 7�-W 316 632 V) w, i a,cvt. 53a. 72 W -f-4 ---- .40 �/ 12Ce SUBMITTED INTO T'fiE PUBLIC RECORD FOR lz3�o ITEM tri ON �",�"+a, 690 NW 67 Avenu4,,4-98 �7 Avenue,_60l_ NW 57 Court gelVW 67 Avenue�605 NW 87 Court._$41 MN_§7 Court..g31 �!W 67 Court•�1 N __97.99 rri Application for Comprehensive Neighborhood Plan Amendment and Rezoning to allow the development of an Eckerd's store in accordance with the site plans entitled "Store No. 009OR Eckerd Corporation" as prepared by Kent D. Hamilton, A.I.A., Architect. The purpose of this letter is to express my support for the above referenced applications. I have reviewed the site plan for the development and I believe that it Is compatible with the neighborhood. Accordingly, I ask that you reconsider the approval the applications. PHONE NAME ADDRESS NUMBER___ �- S - i - t3�s JGo - ys � Ile E- • .� ® fit t.(i 5 7 e, %, 12390 NOSOTROS LOS VECINOS DE LA AREA DE DE LA CIUDAD DE MIAMI ESTAMOS A FA DE LA NUEVA FARMACIA ECKERD CONSTRUIDA EN LA ESQUINA DE LA 57 AV N.W. FLAGAMI/DISTRITO 1 /OR DEL PROJECTO )RUGS QUE SERA :NIDA Y 7 CALLE DEL Signature Fir W Address Direccion Phone Number Numbero de Telefono 3 os-: dz 'lye Al 3 Y �161-,b Nr4V ac s -7 X12 S0 2, 60, a Sze r /) 4 5 Z G' �5 Lbol w S f q flis y G h G i 4-7 2--L-5 ,LZ 12390 NOSOTROS LOS VECINOS DE LA AREA DE FLAGAMI/DISTRITO 1 DE LA CIUDAD DE MIAMI ESTAMOS A FAVOR DEL PROJECTO DE LA NUEVA FARMACIA ECKERD DRUGS QUE SERA CONSTRUIDA EN LA ESQUINA DE LA 57 AVENIDA Y 7 CALLE DEL N.W. 12390 is I /.'� i.W, All I EW, ►����.t��11�►:��►�/_���:.� � � i � ref_ � � • _. . i �� Won -. 12390 NOSOTROS LOS VECINOS DE LA AREA DE FLAGAMI/DISTRITO 1 DE LA CIUDAD DE MIAMI ESTAMOS A FAVOR DEL PROJECTO DE LA NUEVA FARMACIA ECKERD DRUGS QUE SERA CONSTRUIDA EN LA ESQUINA DE LA 57 AVENIDA Y 7 CALLE DEL N.W. Signature Fir rrA Address Direccion Phone Number Numbero, de Telefono -.120> n J-94 pt zv '13&r -.b6 6 ?,f /9 -D -4 4' -5 0 . . . . . . . .... /3 JOY - 3 - q-: awk, ki-()YS6r04AJ-A( (3Ds Q0-993c;� &A Y:5 & 41 IS :S -')- (c ( (c �-T 57AJv- 3 o S - Y!�166 c/l 6 -74-4, e PA (4 el 30� 12390 Submitted Into the publid record in connection, ith item nom- L—on Prisdiia A. Th meson City Clerk MLAMI DOWNTOWN TRANSPORTATION MASTER PLAN W - qmrlr,7�711 �-� EXECUTIVE SUMMARY 0 12394 MIAMI DOWNTOWN TRONSPORTATION MASTER PLAt",,l BACKGROUNDI GREAT CITIES -iAVE ONE THING INV COM "ON - GREAT DOWNTOWNS! Aid Gr c -'e- Downtc 1j-s:-,S)ate into higl-, qualiq of Ife. Aac-EZ- 11-lei-estirig aiv-1 vitt dcvmt<lWns arG atuacbo�risDl! b , ti-ismseives wmd-: no need criate exp;--rlsive art*,F',:i'--1) -nvircomanTs. Deiiseiy sD,0)Ulaed c1cmint.owrv.; Wasteii-O sp!,A.xrv1) an. -I MaXilniZ----,a CO)WnUr1ky'S 1'et'iWt On al-lci {wicl. A City is judged by its Downtown. - Vic. 1-xeaft. and soul that the rest of the world lookq to in order .� Avtderstancl a c.ommunity, and Mores than anything. a strong downtown gives tum of place and ctv'c; pride. I . L- I'!-. l-,: , 1. " a vibram urbpu-i c-,ent=.- torkcFcl nigivdife, anci diver -e btJ1di-;gam , Tlie fr-;,-Ihal. IJ -D (-.R 'I abo-darit J— CIO 1C -,)=i, -9-ley J G'IY. a 0) Subnrittc,d Into the public vuith MIAMI DOWNTOWN hon'Cl TRANSPORTATION MASTER PLAN Prisdila A. TCity erk BACKGROUND A growing number of people and business are seeking 460 return it :10 to the central city drawn t,, 'he i-- of a �4-h-Dj:- ease "Y Increased Social entertairicner- diversions, and a rlc' a—er'. Df daii", C'-Oi,==s din;,-ig 7ne major fcrce bs"Ind aii this change is resde-,-itia' de-,,efoprneiv. Otes are. ;:lace=s whe!-epeopis live and vvork. People have ncl, mianli it siq*ficant n,_xr!r_)ers In niany years. VVtJi the retum of reside�,tia! de,!e1bj,,).mert.(ar estimated 15.000 to 34,000 nes%, d�vei!;--ia unitsz are planned and under development 0� the downtown area c vei, the next 20 ears` -,veil r:3rnq the i-:eed A for tile City to take aggressive and imaginative act -on create a fi-rict,onina tra,i.sportaticr, netAork able tomove greaz&_-i- r-_in-bec of Pecole and more goods (A) witi-tiri and througi, the downtow-) core and S'. between the Nip downtown area and the adjacent neighbolioDds c<- tll-i4=• City' and other" reaioia' renters of ccx)inlerce. 0111 Unfortunately, today's downtown Mia-ni traffic systc—r. is -narked by a convo:uted and inconvenient grid system of one-Aray streets, a tei-vdernay towards anti- pede-strian street and building design and trequent traffic- !:>acV-ups. dt,& to bridge openings on key traffic arteries. Ad[ this combines -zo pri:x-luce a aroNiving amount of congestion and driver and pedestrian frustration. These conditions carne aboA due t.: several gervarati�Drs of that produz,ed, unanticipated consequences. Projects that ,v,&!-_ deenriad positive it isoiation became negative when analyzed in the aggrega-,-e.. "�_,!nd pni-iciples of utban design and planning were o,,eriooked ;in efforts '..o sP,.d - developri ient of individual project,,,-. And there was ro ove.-archiiig oian to guide ti -le- process R -d ensure that all of Che elements --- 'ridrv�dua. private r_fi^%&opnie-ts and GibKc. infrastructure investivients --- came tD, et, �e:­to cl, a -le �� d'. Ecd L g j functcna! city Today, with dozens of major develcp�-nent sla"l-ed fo,- tn the planning stages. tie Civ kcioVvs *t f-nust pre' arse for',a future ma! <ed ;Dv !i -ore people and the need to move t!-temv� rth greater a -d speed. S_)ccessf4�!, vibrant downtowns with strong residentiai jeni=-rit-1 reliable, safe, al_rto and ­ion­a,.Ao means of transpo­,atic-:-.. '1; to tf-ie nev., K a-.vo* environment 'n Do\,,vrvLo,*­) %Iianii, inist the pedestrian and PUYr. transit must rtv.,,,e oftizens f-:: r In re-f:*gnition of these reeds, a"A lz_adei-s detet'rrined that P, con*ipreheris;ive transportation-: rrastex D!ar neede-z! -cc. au;de the dov%ert(3v,,,n area's fvfure- t-3r!sp�-)rr�L! 110. M IAM I DOWNTOWN PZ i s yy 3 R TRANSPORTATION � Lk ll THE PLANNING PROCESS :.Lf:r_�,.Sv..�t-.,U't(l T) .T�.�T.): � _rii:.. i.���gYC�'i- i;!':1:'• Ail.' 0•.7`� 1 . �;`--i :.t.�:.:, r ,'-C�-itT �i =.1 ..-.. . _.. �C•j. .. !e?C.{1-t'_'✓v iJ3'�, 1'>. F{•r/11Ji.it� lC)l.f�i)1 7�+.'J ll='n' 0111Ji'Liv6?1}'�tG'tts -6 11-o; q1-1 � -,: _.'1 _'_._)� .'i •'" � _+ CPti�; :! _.� J �'C•_I �-�r +J`', i; �_ .r'f:-a. gir-,.-..r�i �`�ii.'�' �) i .r1_ 'a •`.i. `.r'r t.l�: ...'.) .'_� tory r �-,_ - goal of tfle planning'li'tY'. � t r r' " ; 4. 3i- Tr'� (-!�Ji�� ;i !_h':I%�u.c (jS•t_,.(;-+_ ,•+� _,�-;r_} ii'1t'o! i jll a balanced tC'3rlS4+Ci1-tati0i-I sy'Ste—)-I' f�i' aSf?'''✓^tu:�#'i L=")'f1'.onmeilt and improvent lel it of tn'= CUII d)-1,111lt-" 3 .iL'�ti''C�.' The Plan is based upon: 1.REVIEW OF OTHER STUDIES 'similar planning exercises conducted ;n a nurr tev of tati-'etr -Cr=: rven D-Aas, Tampa, Jacksonville, Ch?nr iotte, and MaAb"X'.' r-;reat've ideas. Ilse Ranning Team a s� � tt-trek �:-r fresh i-_'Ok , r mt_,r e, th� n •'215 other transportation studies prepared for downtown fe'ianii i: -r yr+ ars i,y ;. a' r is agencies. 2.ANALYSIS OF NEED AT DIFFERENT LEVELS OF DEVELOPMENT PROJECTED FOR THE YEAR 2020 TilEr starting porll s I -Or 16n. ; :udy �v: _. r,k ' 1 i +. i')4 t rJ>if5 ty i+<iZ:,+�r . i f' 1 'gib id traffi;., studies conducted in rep-ent years. ti ansportat;fjri in iprcY5tE3ments W(?i'(e defined based ori ti -i- p vijio i L, (Y- 1, jt_irk-:: 'L-- ;r i _ j:Ji} C+ )5 t l.h(-- area: Base§ne, the Trost otonser native of f}1 l.d=\fN?it+i3r11h lit sG: i i t) + . ": 1:M�t� 57t{!Ctc`�Ity' :,.(�C�t�teC� Ci�L.lt'i�lWlF.�o �1(���ili�tiv)l Tsai"t?C��}:� t�;OP i`?�i�f �t_� •�r-i gra a:-?, thi` `-"'cerlal b iricf ease's E rnployn-)ell" 'C -V 18,000 swipl(Jves's "ancl r es! liz i -rt es J is . by 15.0T—) (1 ry 'z-,14 1C, #.lrlit5 r, `{l„ ^(fir:. Enharcef1, a. more aggressive grcjj "'Til r1� eE� �.; is development trends seen in the i+:, i t0 199 9, thl5 _ r` ' S l : lrl' ft? ahc=? s t } -7; _ 5'"Il iC: C i_ i_'t 3! eil ok)yees cai-id resident] a} 00,2 fJvV01itil:;s i+t}i7 j study area by 2020. - !.siona-�'; the incisi. op11:1 ist'C and aggressive t:) ased on ine successful groviv- l irer�ds seed ii s 'lili ©C`.•JE r�';,r!-< fi;l;;=•ti )1 -_i tt-,e fast three to ,rive years.tc gig. this cenw 5ti• , by 48;000 E?'mr.*t vecc :rid :aiirts in the GO. ^ Q`; file Study evea by 20210. WNPUT FROM A WIDE ARRAY OF COMMUNITY LEADERS, RESIDENTS, EMPLOYERS AND EMPLOYEES IN THE DOWNTOWN AREA. :�!�) ;^Xt.t✓•r"rSf�'@ hLii�ltc faVOi+: �?Il ;t=Sl1_ (:ii�5 I . , _is !-if }?'r. �.} �.I'i'?'; �i ,f , _°t� �[) t'a s_•=' - scale public mieetings, SC n3 grc S ..) G = _ 1tc tlt�il: i, arld that .-,e{ped t'o shah;.' 5 fterent or ;i—: 6 1 _F40 6 11 D THE DOWNTOWN TASK FORCE. (DTF) .. _ . �. _ _ _ � i3'•_.. .._.'�jJJ �_.. _..'i C'�;l"i?C!l!j'�' li?d,y' :.�L.{� �''�t:t..iP.C:=?.!'C..�-.i,. _.? ,� 5- i .,•)'_... .. .1 .._' -r:.::i;: ..t _ :;. ._'.__ �{ ..... _ _ �:.,...+"" r.,_ 1 .. �littr3ti tC:+ LiQr i`.`t�i�p'.�l" � r��' p'Jt!, a�t:.a .: c �t.�w,�� :. �-:=`= --- -- - -•� .-. . _ _ � ,.._ Ct t�:_i' ... _ �..r:..�a. .`'... � p -E _? jE�r}~�1CS `.- t�'I' i:'i 1P 1-'"p"; Sp]i•:�itai.:=G'.C� _ �^'r�i.:p.�' _ .. _ �-`�• �Ea` - • -. - .° ._r 7 J - -.F_. - - - • :?. _,_.. � ;i Y.1R . t?•= .:�'- r ... `�f tai'?L;I t - e EvakS tic C: tae.• ;};_3 f:,, ; !Y': t.j'?e 1f�Cia ,_.�af"':P`I"''c`i'Pf� � " . t e ..... _ _ � ,._ . _ . _ _+ - - _ . _ .., - . _ t , J c -t. �r��. 'i-lt•' . E�. "•, l:•;aYjijG foxull1S we -re 1 Dl a ,, S,1 -al -gro pnn� 5E .latiG' ;S I oste+ ! v r a,=il:za; t:.3!lS. price tlZe CIY:'S'l:f�ita'i t 7111ry. RedeC VeiC7pmert Age -3!? y (ai* V*Vest !�"tc? +-_�, '_� 1� �:�'."1! 1 l ,�tli.;il NSSC C�sc� tG' !.-+ -1 re 0area the e. aie>' 13tlii?eI- of C,ol i it? lei a d ,he _ D,nt. ;._ A -1k?V Cil??e?D T `,t. ?O^eT ref, e @'{' ;718 F?gS t?pECtG sha}F. ed?t j ;ibP. �'o loll s tatementS3eC'"t ' %? c2ti:'lllj:�i°lam t!?2 cv-�.Cc}iZlt'rif�tic��'t *'i?)'1S'J"'i2<t1L�: L'Z}s'O'f�^f�'•A{l`S, KEY ASSUMPMONS The Status Quo Is Not Adequate Under Any Circumstance 1 e p}1a roitng jib ai. ers dF.''tem.l!red Isla? . _ .. : 1. i , ? ' C t_ S . - } ,,:Ii tI 2C) Baseline, .,r:rt�1C (t.'"ketal"✓ If � MC 3Elf: iPT.I}9'd1'�` r ei !'-S te .:ga:.__i;? Sti:ti C)' 'car St a5 a mea(1S ?f: c..i.}ESSd It O�"J :iE ""i f`• 't��{f9IT �. J`tU<: tEa} XC F� ..t��. ^ �. _ _, +Ji7 ti ; rt.ead%� .. �'�. '. Mace f Miam. iA@iCtJ' ui;,-e tiZed sysz 7-r,, ti lrlS iig-Tt through this al'E?; c-2:' _:. v s— t i ; •t Citti' travel t•"r•J.... ,��f, e"4'n 1-4.���1 {1� Cir�t.",. �^ :_�'4�i. }'^ CG�'twil^E?3liS rJ the ''oadway sy a! y a. _ 1, ( 7 n -o t � StC•'1'i 1 a t� :,,c,i..s} �. _ �_ .i!i C� :�,. ti` :; ;.� :<.,,,;IS 1r� :,�C+�.`r,: i.O�'Vi'. at'ecS 5 CfiSt^'e:��fiy'tom tC> ��..�•!?E358e5., gX•�e[l5[vtF• t�,tr C+::' I;alsfa�f� `t�� :.•-r" t :F1:9'� :"� :��., f,-, i� j-."'f=.:Sl!71C JE'CBt.ISA ;.,'Uil dines , Lt:?il the: oxts'ljog, !igi-. S. -4 v'i' 1 f F% 7- -ier; :1 d sp}ee"e '.0>a•pj;f-;t V�r[`tl"? (:,recatinfI lac Cje Yt �+ jt?r _ -''tin s ftv: ? . .f t- " t :... �`p' 'T l<71" 't'ij' t; vt. v,,x r`� titClE'.1; aIlSit a:-fJ med4qt© the public r�Icat4Ve�4 5;'�C.e .. GSS`J.t'i.:11?;r�c, E.f?•tV:'L!� .�`.�'."<e .e_r_ t"., . '']:= �{.," � . _ _ �"", '- (tr C' _ . _ _.". `p r' tl aJFt �Q n 'th Multiple Solutions Will be Required. Ni sd i a A. rho Gipson City Clerk s_, .1Jn+�t ? .✓..t _)CU:cfil} 'd- e-Ft7 i: the envirotlr?'les it, ;a.rdGf' ;s�3 "i i ti i? _ _ i .- _J �C; . _.L e}, iJc; ry' to affect Fi avalf i_tr?T'._.'J:� :.1-.....i.,3�:� �r::�t�Cyi�S-r�i� t,^,r��e-�; pit t...-- ;� i�l ' i-u3r t� {+;'S.E:>i•ji-�, _ :9 � i...),_;C:'}-:f,'r.': i�.'!i'_'�t i � a _ r -h _I, _, (�Fti['J5`E°+a. 4 6l6)(1A CRITICALLY NEEDED are extensive. ire pro trements to tike t^ans't systi-am to absorb a lame paortiofr t of tete 202C demand. These types of in*sp raven-veiAz could !shoe ode: ... Snolte: headwasand more foc .=.sed L;.. l Ic-we sf-i ;ttie systenns like' flue Eli,_kefi shi1itie. %/letronn/aVe'i" lines e t !ndF?_E Into ot-,er argi=ls, ejid 1.-i.. ---fare tortes. Asti ne-aded are enhancernerrts for otiner mode:; +of transpor cation 41,c bicycles, pedestrians, and water -borne. iranspo±tation. Tile Plan also addresses vehicular needs like' the traffic congestion caused by the Erickell Bridge openings, the contusion of the one-way Street syste nn. and the need to create more ;appropriate vehide enti yqv ays than the current 1-95 Distributor Ramps. DEVELOPMENT AND EVALUATION OF TRANS IMPROVEMENTS i� r ✓ e s.. 1q�,ii� 1p y i o Improvements are Required at Three L -eve -is. Tinree tsers of transportation system in provernnernfis �ti'e e. evalu2ed. Tier 1 --- h�nprovernnents based on suggestions nnadc: yr p!;�'aie?rrls icierzti5a l !_;. �i��. p,:?I:':ic. :�, s':tianple; a p_lblic cornmerlt tinat "the streets -nre coinfu Ing and I aKmays g?t to tin -o -way streets. Tier 2 --- Improvements proposed in pre,' ious for Do\% n`c'v,;n kiliaml lik _! t=_ UstribLtor Ramps and the creation of a grand entr r,-. for 1,•_. dio:w-ito--v n Tier 3 --' Improvements determined by tiny 114 e l"S I dt-DTE S; ._ i 1'71u motorists of Brickell Bridge openings. In all, over 40 irnprovement strategies, covering rna!ny tnlOL e -s o1 were developed for eaeh su -area of Clowi-town Miami. Each transportation .5ysteri-t i' i1Pr;Dl'�t r1ST:t V. R _ 1 !1 !' _ y _Wit; _ _ is F + �'-"=� _ d': 1 i'.�- Lila u� �c< tn:1 t_, ::1;. 131= Z expected benefits. The Evaluation Cticeria I-C'r' -i n- ttee determirr(?.C{ %. t i l"1'ta 1 sr - c i e:, f�a- 'trau )3t.:o:'tat4 system improvernent based on six goals, M -k -h indgirded -_rrm ,nn-lerttal, grov,rLfn and deveiopmert, and tra"IsportatS±_'n iti12 3 0 II FI 11 } i u it It d i 11 it i III� iII q 1 ■ it 11 it M fl 11 p M 4 NN nit 1 tillll 1111 1111 1 N N tILL fi II p DEVELOPMENT AND EVALUATION OF TRANS IMPROVEMENTS i� r ✓ e s.. 1q�,ii� 1p y i o Improvements are Required at Three L -eve -is. Tinree tsers of transportation system in provernnernfis �ti'e e. evalu2ed. Tier 1 --- h�nprovernnents based on suggestions nnadc: yr p!;�'aie?rrls icierzti5a l !_;. �i��. p,:?I:':ic. :�, s':tianple; a p_lblic cornmerlt tinat "the streets -nre coinfu Ing and I aKmays g?t to tin -o -way streets. Tier 2 --- Improvements proposed in pre,' ious for Do\% n`c'v,;n kiliaml lik _! t=_ UstribLtor Ramps and the creation of a grand entr r,-. for 1,•_. dio:w-ito--v n Tier 3 --' Improvements determined by tiny 114 e l"S I dt-DTE S; ._ i 1'71u motorists of Brickell Bridge openings. In all, over 40 irnprovement strategies, covering rna!ny tnlOL e -s o1 were developed for eaeh su -area of Clowi-town Miami. Each transportation .5ysteri-t i' i1Pr;Dl'�t r1ST:t V. R _ 1 !1 !' _ y _Wit; _ _ is F + �'-"=� _ d': 1 i'.�- Lila u� �c< tn:1 t_, ::1;. 131= Z expected benefits. The Evaluation Cticeria I-C'r' -i n- ttee determirr(?.C{ %. t i l"1'ta 1 sr - c i e:, f�a- 'trau )3t.:o:'tat4 system improvernent based on six goals, M -k -h indgirded -_rrm ,nn-lerttal, grov,rLfn and deveiopmert, and tra"IsportatS±_'n iti12 3 0 A ' 94 "'il A Ask 3 i I RECOMMENDATIONS AND IMPLEMENTATION Evaluated according, to the The i'la.1, t; -,c - transportation transportation sy-_,tenimprovements were ranked as, Seve-r al r e ornrnendations were repeated throughout tlic et ,tire study area. +eke. irr!pf�yvina t ansI service t;fr+_uency, reliability, and state:-of-ne-art, user- irifo'naatioj i syste- s►, developing a net ovork of pedestrian-oneiAr-_ J corridors, a -id converting one-way streets to Iwo -way. -ecor nnienda*.ions, We removing a portion of 1-395, were more sub -area �' � lzrr specific. The recon-riendations were further stra"ed by sut.-area. � � Some specific: impl-ove:ments inciude: I A..Creating a Meb-orno ver loop in the Brickell Financial District B..lrmplernentn-ig a water taxi between Brickell Key and the mainland C..Constructng a. tunnel under the Wliarn; River at SW 1 Avenr-!e D..E-Extending MeetT>mover to the Wynwood area E..Extending the M -Path fior bicycles F. Modifying Nort9114 Street from 1-95 to Biscayne Boulevard {..Completing BayEva k from Pace Park to Bayside. I = RIC 1111 I Thw= Ted-inical Evaluation Committee estimated an implementation schedu',e for each improvernent. Phase 1 - through 2010, Phase 2 - 2011 through 2015, and Phase 3 -.2016 through 2020. I TI-te sctv=duie r(.i�cognLes that more detailed studies..oncaptu:d and fink! designs, as -id construction timeframes must be accorni-nodateo. THE HALF -CENT TRANSIT SALES TAX Ti-ee Task Force bekeved that the Plan should" focus on visionar v so'utio: * t:.� rts transportation systern. Securing the funding for tiie transpo.-iat; .)n iinprovements would follow with political and ccnzmunfi, leadprsh+l�. Is Submitted if1t0 ti1B pUb�Ih November 2002: the voters in Miami -Dade County capon %.red ti)e Pecple's record in CJ; necti ri Itil Transportation Plan. This plan Eevies a half -cent transit series su-tax tc, item P2--11 Dn s zy provide ,"1) mare and higher quality transit and ;2! fur ,ding to rfor Priscilla A. Th6m sore transportation pr oiects. City Clerk Twenty, percent of the sales surtax proceeds .VT be disV il;_ied to municipalities based on ibeir population. Each irrunicil:,alt,- sha11 app'.1r a mirilhium of 20% of fln share of the proseeds towards tragi-r;i_ wrth the baiance to be. used for other transportatioi, it. is estimated that the City clf Miami, being largest r r1UniCdt�ih;' ;n l\iianv-Oade � ounty. vAl rseceive annual to Ove!. 10 million. This new. dedicated funding souxe •,411! enabI_: innpn _-mentation of rr-ianY; of thr MDTMP's recommendations by ti !e yeel' 20.20. 12390 7 MIAMI DOWNTOWN TRANSPORTATION MASTER F`L_At.J, CONCLUSIONS THE FUTURE OF THE CITY OF WAIIA DEPENDS UPON THE REVITALIZATION OF IT'S EC ON011011C CORE IN DOWNTOWN. ^ k� th;S wve floA, of traffic and Xfovei iie--*,f &01,:4e. %A, C, I i'•:ii ! i-)rocess is, designed 1. Support continued growth and development of Downtown Miami's business community, 2. Foster a pedestrian friendly environment that attracts people to five in the downtown area, and 3. Promote an Intelligent mix of transportation modes to create a world-class transportation system. i., -nie attaj,-,,-nm,-,,t of these goals wai lay the foundation for the emergeno j C; prepared to take its place as one of Iie truly great cities o', the wo:id. tfv� Downtown Transourf.a1c.)n Plan, jj it -ji!-j() .-r.an-4- T­.x �.nd snatching fi-inds, aliovv tbe, City ,),f 4"Aami 12390 MIAMI DOWNTOWN TRANSPORTATION MASTER PLAN 0 '%1- TA Submitted Into the publIF record in ccs recti® Zvi )h item 22: - I I on 5 63 Prisdila A. Thorn' pson City Clerk 12399 NOSOTROS LOS VECINOS DE LA AREA DE FLAGAMI/DISTRITO 1 DE LA CIUDAD DE MIAMI ESTAMOS A FAVOR DEL PROJECTO DE LA NUEVA FARMACIA ECKERD DRUGS QUE SERA CONSTRUIDA EN LA ESQUINA DE LA 57 AVENIDA Y 7 CALLE DEL N.W. Signature Firma Address Direccion Phone Number Numbero de Telefono �� a �V. w• � � -1? 3 a L/t '560! 'PS- 26) SZ6 O/ NGC% J Al 64.) L a Al U� Ld 42 �a�'• �� �� /� �� .2 ��vo 5 J rc% (G+ w' fi 30� z�-3 z 12390 =t' NOSOTROS LOS VECINOS DE LA AREA DE FLAGAMI/DISTRITO 1 DE LA CIUDAD DE MIAMI ESTAMOS A FAVOR DEL PROJECTO DE LA NUEVA FARMACIA ECKERD DRUGS QUE SERA CONSTRUIDA EN LA ESQUINA DE LA 57 AVENIDA Y 7 CALLE DEL N.W. Signature Firma Address Direccion Phone Number Numbero de Telefono s�"`'q/ ��.�, 30 12390 NOSOTROS LOS VECINOS DE LA AREA DE FLAGAMI/DISTRITO 1 DE LA CIUDAD DE MIAMI ESTAMOS A FAVOR DEL PROJECTO DE LA NUEVA FARMACIA ECKERD DRUGS QUE SERA CONSTRUIDA EN LA ESQUINA DE LA 57 AVENIDA Y 7 CALLE DEL N.W. Sig a Fi n a Address Direccion Phone Number Numbero de Telefono T �61 �l 1. , s' 613.367 266 �5 12390 This instrument was prepared by: Name: Ben Fernandez, Esq. Address: Bercow & Radell, P.A. 200 S. Biscayne Boulevard, Suite 850 Miami, FL 33131 r U3 lleay% (Space reserved for Clerk) DECLARATION OF RESTRICTIVE COVENANTS This Declaration of Restrictive Covenants (the "Declaration") made this 13th day of January, 2003, by Sime Corp., and Florida Union Land Corp., Florida corporations (hereinafter referred to as the "Owners"), is in favor of the CITY OF MIAMI, FLORIDA, a municipality located within the state of Florida (hereinafter referred to as the "CITY"). WITNESSETH WHEREAS, the Owners sought and obtained a rezoning pursuant to Ordinance No. , for the property located at and being legally described as: (See attached exhibit "A") WHEREAS, on March 27th, 2003 the City Commission approved the rezoning of the Property to C-1; SUBMITTED INTO THE PUBLIC RECORD FOR ITEM pz-u ON saa o3. 12390 WHEREAS, the Owners are desirous of making a voluntary binding commitment to assure that the Property shall be developed in accordance with the provisions of the Declaration herein. NOW THEREFORE, the Owners voluntarily covenant and agree that the Property shall be subject to the following restrictions that are intended and shall be deemed to be a covenant running with the land and binding upon the Owners of the Property, and their heirs, successors and assigns as follows: Section 1. The recitals and findings set forth in the preamble of this Declaration are hereby adopted by reference thereto and incorporated herein as if fully set forth in this Section. Section 2. The Owners hereby make the following voluntary declarations running with the land concerning the use of the Property: A. That the billboard sign located on the Property shall be removed prior to the issuance of a building permit for a new retail use on the Property. The Owners voluntarily waive any and all rights under the Bert J. Harris Act in relation to the billboard sign. B. That a minimum 20 -foot landscaped buffer shall be provided along the western boundary line of the Property. C. That an 8 -foot high masonry wall shall be constructed along the western property line setback 15 feet from the base building line, subject to review and approval from the City of Miami Department of Planning and Zoning. D. The undersigned further agrees that these conditions, restrictions and limitations shall be deemed covenants running with the land, shall be recorded in the 12390 Public Records of Miami -Dade County, and shall remain in full force and effect and be binding upon the undersigned, their heirs and assigned until such time as the same may be released in writing by the City of Miami Zoning Board or City Commission after a public hearing which public hearing shall be applied for at the expense of the Owner or his/her designated representative. Section 3. Effective Date. This Declaration is effective at the date of execution hereof. This instrument shall constitute a covenant running with the title to the Property shall be binding upon Owners, their successors and assigns. These restrictions shall be a limitation upon all present and future owners of the Property and shall be for the public welfare. Section S. Amendment and Modification. This instrument may be modified, amended, or released as to any portion of the Property by a written instrument executed by the then owner of the fee -simple title to the land to be affected by such modification, amendment or release, providing that same has been approved by the City of Miami Zoning Board or City Commission after a public hearing which public hearing shall be applied for at the expense of the Owner. Upon approval of such modification amendment or release as specified herein, the Director of the City of Miami's Planning Department or his successor shall execute a written instrument in recordable form effectuating and acknowledging such modification, amendment or release. Section 6. Inspection and Enforcement. An enforcement action may be brought by the City or by any property owner within 500 feet of the Property by action in law or in equity against any party or person violating or attempting to violate any 12390 covenants of this Declaration, or provisions of the building and zoning regulations, either to restrain violations or to recover damages. The prevailing party in the action or suit shall be entitled to recover costs and reasonable attorney's fees. This enforcement provision shall be in addition to any other remedies available under the law. Section 7. Severability. Invalidation of any one of these covenants by judgment of Court shall not affect any of the other provisions of the Declaration, which shall remain in full effect. Section 8. Recording. This Declaration shall be filed of record among the Public Records of Miami -Dade County, Florida, at the cost of the Owner. 12390 01/22/2003 14:19 561-451-4420 CORAL COAST CONST CO PAGE 06 61i16f2083 01:45 305669E;87 1 M bK14V '4 �,. rrn,r ACKNOWLEDGMENT CORPORATION Signed, witnessed, executed and acknowledged on this 21 day of ..MM Print Name i r � fSt.., �'amk'-J- STATE OF 1V JN -- COUNTY OF �11tiNlt-►'�' The foregoing instrument was acknowledged before me by %dK ?I C&AL-- r the .�.�", of Florida Union Land Corp., on behalf of the corporation_ WShe is*gpersonaly known to me or ❑ has produced , as identification., Witness my signature and official seal this $Z day of 2003, in the County and State aforesaid. My Commission Expires: MARK WAUACE ?` MY COMMISSION N DD 093342 EXPIRES: February 18, 20D6 of h°S' Barged Tt u Notary Publk Undenvdurs ACKNOWLEDGMENT CORPORATION Signed, witnessed, executed and acknowledged on this Z3 day of 0n1UA ''C , 2002. J Signature Print Name STATE OF 'i7a COUNTY OF KkJAI-- PbV5 sK Address: 6 U"qc- 4v The foregoing instrument was ackn edged before me by SGO'�T S -IBV, , the Aim d'me Corp., on behalf of the corporation. ge She is personally known to me or ❑ has produced , as identification. Witness my signature and official seal this Z3 day of J 444E z -Y 2003, in the County and, State aforesaid. Notary Public State of gAba MA4-- wtx� My Commission Expires: Print Name MARK WALLACE .: MY COMMISSION # DD 093342 EXPIRES: February 18, 2006 Bonded ThW No&w Pd* urndvm#*m 12390 EXHIBIT s A LEGAL DESCRIPTION: ALL OF LOTS 2,3,4,5 AND 6, TOGETHER WITH A PORTION OF LOTS 1,7,23,24,25,26,27,28,29 AND 30, BLOCK 17 OF "WEST FLAGLER PARK" ACCORDING TO THE PLAT THEREOF AS RECORDED IN PLAT BOOK 8 AT PAGE 96 OF THE PUBLIC RECORDS, OF DADE COUNTY, FLORIDA, BEING MORE PARTICULARLY DESCRIBED AS FOLLOWS: BEGIN AT A POINT ON THE WEST LINE OF SAID CLOCK 17, SAID POINT LYING 20.00 FEET SOUTH OF THE NORTHWEST CORNER OF SAID LOT 7; THENCE NORTH 00'01'02" WEST ALONG SAID WEST LINE 235.79 FEET TO THE POINT OF CURVATURE OF A CIRCULAR CURVE, CONCAVE TO THE SOUTHEAST; THENCE NORTHEASTERLY ALONG THE ARC OF SAID CURVE HAVING A RADIUS OF 25.00 FEET THROUGH A CENTRAL ANGLE OF 36'30'27" AN ARC DISTANCE OF 15.93 FEET TO THE SOUTH RIGHT—OF—WAY LINE OF NORTHWEST 7TH STREET; THENCE NORTH 89'37'19" EAST 168.75 FEET TO THE POINT OF CURVATURE OF A CIRCULAR CURVE, CONCAVE TO THE SOUTHWEST; THENCE SOUTHEASTERLY ALONG. THE ARC OF SAID CURVE HAVING A RADIUS OF 50.00 FEET THROUGH A CENTRAL ANGLE OF 90'22'42" AN ARC DISTANCE OF 78.87 FEET TO THE WEST RIGHT—OF—WAY LINE OF NORTHWEST 57TH AVENUE AND THE POINT OF TANGENCY; THENCE SOUTH 00'00'01" EAST ALONG SAID WEST RIGHT—OF—WAY LINE 240.89 FEET TO THE POINT OF INTERSECTION WITH THE SOUTH LINE OF THE NORTH 20.00 FEET OF SAID LOT 23; THENCE SOUTH 89'46'20" WEST ALONG SAID SOUTH LINE 101.96 FEET TO THE WEST LINE OF.SAID LOT 23. ;THENCE NORTH 00'00'32" WEST ALONG SAID WEST LINE OF LOT 23 AND ALONG THE WEST LINE OF SAID LOT 24 FOR 40.00 FEET TO THE INTERSECTION WITH THE SOUTH LINE OF THE NORTH 20.00 FEET OF SAID LOT 7; THENCE SOUTH 89'46'20" WEST ALONG SAID SOUTH LINE OF THE NORTH 20.00 FEET OF LOT 7 FOR 121.96 FEET TO THE POINT OF BEGINNING. SAID LANDS CONTAINING 59,704 SQUARE FEET (1.3706 ACRES). 12390 MiHMi DOWNTOWN TRAnsPoRrfIrion Mf;sTER PLf;n I I Anal Asp, AI l�J Miami Downtown 461$�Olifil",�',� Miami Downtown Transportation Master. _a TABLE OF CONTENTS Page Listof Exhibits................................................................................................................................TB-4 Listof Appendices......................................................................................................................... T13-4 EXECUTIVESUMMARY.......................................................................................................... ES -1 1.0 INTRODUCTION................................................................................................................1-1 1.1 The Need and the Opportunity...................................................................................1-1 1.2 The Miami Downtown Transportation Master Plan ................................................... 1-4 2.0 BACKGROUND...................................................................................................................2-1 2.1 Master Plans from Other Cities..................................................................................2-1 2.1.1 Madison, Wisconsin.......................................................................................2-1 2.1.2 Charlotte, North Carolina...............................................................................2-2 2.1.3 Dallas, Texas..................................................................................................2-2 2.1.4 Denver, Colorado...........................................................................................2-3 2.1.5 Jacksonville, Florida.......................................................................................2-3 2.1.6 Tampa, Florida...............................................................................................2-4 2.2 Previous Downtown Miami Transportation Studies..................................................2-4 2.3 Technical Evaluation Models and Methods...............................................................2-6 2.4 The Micro -simulation Model for Downtown Miami: Paramics.................................2-9 3.0 PUBLIC PARTICIPATION................................................................................................3-1 3.1 Downtown Task Force...............................................................................................3-1 3.2 Technical Committee..................................................................................................3-1 3.3 Land Use Committee..................................................................................................3-2 3.4 Evaluation Criteria Committee...................................................................................3-2 3.5 Community Outreach and Public Involvement Meetings..........................................3-2 4.0 DEVELOPMENT SCENARIOS........................................................................................4-1 4.1 Methodology...............................................................................................................4-1 4.2 Summary of Scenarios................................................................................................4-3 5.0 TRANSPORTATION SYSTEM NEEDS..........................................................................5-1 5.1 Roadway Network Development...............................................................................5-1 5.2 Travel Forecast...........................................................................................................5-4 5.3 Traffic Loading...........................................................................................................5-4 5.4 The Roadway versus a Pedestrian -Friendly Environment.......................................5-11 5.5 Multimodal Improvements.......................................................................................5-12 6.0 DEVELOPMENTAND EVALUATION OF TRANSPORTATION SYSTEM IMPROVEMENTS...............................................................................................................6-1 6.1 Three -Tiered Process..................................................................................................6-1 6.2 Improvements Evaluation...........................................................................................6-1 Pae TC - 1 Table of Contents g X2390 Miami Downtown Transportation Master. a 7.0 RECOMMENDATIONS.....................................................................................................7-1 7.1 Improvement Categories............................................................................................7-1 7.1.1 Roadway Improvements.................................................................................7-1 7.1.2 Transit Improvements.....................................................................................7-2 7.1.3 Pedestrian Improvements...............................................................................7-2 7.1.4 Travel Demand Management.........................................................................7-2 7.1.5 Other Modes...................................................................................................7-3 7.2 Specific Recommendations........................................................................................7-3 7.2.1 Implement a Free -Fare Transit Zone..............................................................7-3 7.2.2 Construct pedestrian connections from Bayside to AA Arena.......................7-4 7.2.3 Extend Baylink light rail down Biscayne to Hagler......................................7-4 7.2.4 Implement a two-way road system.................................................................7-5 7.2.5 Improve transit amenities and attributes in the area.......................................7-7 7.2.6 Connect other neighborhoods with transit......................................................7-9 7.2.7 Implement Intelligent Transportation System (ITS) technology alternatives to help with bridge openings............................................................................7-10 7.2.8 Develop an extensive network of pedestrian corridors................................7-11 7.2.9 Implement the recommendations from the Miami River Greenway Action Plan...............................................................................................................7-14 7.2.10 Connect Brickell Shuttle to Hagler Shuttle..................................................7-14 7.2.11 Reconfigure Metromover in the Dupont Plaza Area....................................7-14 7.2.12 Implement ITS for Special Events...............................................................7-16 7.2.13 Provide a pedestrian walkway along Biscayne Bay from Pace Park to Bayside .....7-17 7.2.14 Implement Biscayne Boulevard Improvements from NE 6 Street to NE 14 Street.............................................................................................................7-18 7.2.15 Build a new tunnel under the Miami River at SW 1 Avenue .......................7-18 7.2.16 Improve pedestrian connections in Bicentennial Park.................................7-20 7.2.17 Improve NE 1 and 2 Avenues for truck traffic.............................................7-20 7.2.18 Complete Downtown Miami DDA signage plan.........................................7-21 7.2.19 Provide a truck -only tunnel from the Seaport to Watson Island ..................7-21 7.2.20 Widen and extend West 1 Avenue...............................................................7-23 7.2.21 Extend SE 1 Avenue from SE 8 Street to SE 5 Street..................................7-23 7.2.22 Improve bicycle facilities.............................................................................7-24 7.2.23 Extend Metrorail to AA Arena and Seaport.................................................7-25 7.2.24 Remove I-95 Distributor Ramps and provide a "Grand Boulevard" on South 3 Street..........................................................................................................7-26 7.2.25 Provide a shuttle system into Wynwood......................................................7-27 7.2.26 Provide a shuttle to Watson Island...............................................................7-28 7.2.27 Extend the Metromover through the Brickell Financial District..................7-28 7.2.28 Depress I-395................................................................................................7-29 Table of Contents Page TC - 2 Miami Downtown Transportation Master. _ .i Table of'Contents Page TC - 3 1.2390 7.2.29 Implement Flagler Shuttle............................................................................7-30 7.2.30 Provide a Port Boulevard U -Turn .................................................................7-30 7.2.31 Create a Shuttle System for the Brickell residential area (from 13 Road to 26 Road)............................................................................................................7-31 7.2.32 Provide a transit greenway...........................................................................7-31 7.2.33 Implement traffic calming alternatives through Brickell residential areas ..7-32 7.2.34 Extend Metromover into Wynwood.............................................................7-32 7.2.35 Extend the Metromover to 26 Road.............................................................7-33 7.2.36 Build an 1-95 northbound on-ramp at North 6 Street to provide access to westboundSR 836........................................................................................7-33 7.2.37 Improve North 14 Street from I-95 to Biscayne Boulevard .........................7-34 7.2.38 Provide Commuter Rail to Broward County................................................7-34 7.2.39 Provide a Brickell Key Water Taxi..............................................................7-34 7.2.40 Provide a Water Taxi/Ferry to Watson Island..............................................7-35 7.2.41 Provide a partial I-95 Interchange at NW 29 Street.....................................7-36 7.2.42 Construct an interchange on I-95 at NW 14 Street.......................................7-36 7.2.43 Depress 1-95..................................................................................................7-36 8.0 IMPLEMENTATION................................................................................................................................. 8-1 8.1 Schedule............................................................................................................................................. 8-1 8.2 The Half -Cent Transit Sales Tax..................................................................................................... 8-5 8.3 Long Range Plan ............................................................................................................................... 8-6 8.4 MDTMP.............................................................................................................................................8-6 Table of'Contents Page TC - 3 1.2390 Miami Downtown Transportation Master, _a Exhibit LIST OF EXHIBITS Page 1 Brickell Area Improvements Map........................................................................................ ES -11 2 Brickell Area Improvements Phasing..................................................................................ES-12 ................................................................................................0-1 3 CBD Area Improvements Map.............................................................................................ES-13 EEvaluation Scores...................................................................................................................... 4 CBD Area Improvements Phasing.......................................................................................ES-14 F-1 5 Omni/Overtown/Park West Area Improvements Map ......................................................... ES -15 6 Omni/Overtown/Park West Area Improvements Phasing .................................................... ES -16 4-1 2020 Forecast for Total Employment and Housing..................................................................4-4 5-1 Baseline Scenario Transportation Network Adjustments.........................................................5-2 5-2 Enhanced Scenario Transportation Network Adjustments.......................................................5-3 5-3 Visionary Scenario Transportation Network Adjustments.......................................................5-3 5-4 Comparison of Entry/Exit Volumes (PSWADT)- Baseline Scenario.......................................5-5 5-5 Comparison of Entry/Exit Volumes (PSWADT)- Enhanced Scenario.....................................5-6 5-6 Comparison of Entry/Exit Volumes (PSWADT)- Visionary Scenario.....................................5-7 5-7 Year 2020 MUATS Model — Network by v/c Ratio — Baseline Scenario................................5-8 5-8 Year 2020 MUATS Model — Network by v/c Ratio — Enhanced Scenario..............................5-9 5-9 Year 2020 MUATS Model — Network by v/c Ratio — Visionary Scenario............................5-10 7-1 Brickell Area Improvements Map...........................................................................................7-39 7-2 CBD Area Improvements Map...............................................................................................7-40 7-3 Omni/Overtown/Park West Area Improvements Map............................................................7-41 8-1 Brickell Area Improvements Phasing.......................................................................................8-2 8-2 CBD Area Improvements Phasing............................................................................................8-3 8-3 Omni/Overtown/Park West Area Improvements Phasing........................................................8-4 Appendix LIST OF APPENDICES Page A Transportation Projects/Studies in Downtown Miami.............................................................A-1 BAcknowledgements................................................................................................................... B-1 C Summary of Survey Responses ................................................................................................0-1 DList of Meetings........................................................................................................................ D-1 EEvaluation Scores...................................................................................................................... E-1 F Abbreviations and Acronyms.................................................................................................... F-1 Table of'Contents Page TC - 4 `Z3O Miami Downtown Transportation Master. ..c EXECUTIVE SUMMARY he City of Miami—an internationally recognized hemispheric financial and commercial hub—is situated for evolving into a truly world class city. Now City leadership is seeking to advance this evolution by transforming a predominantly daytime business -oriented downtown into a vibrant, 24-hour urban center. The City has an excellent opportunity to pursue an aggressive urban development program for the downtown area. City leaders can pursue a program of policies and projects that help establish that 24-hour urban environment. They can promote plans and projects that include entertainment components as well as a varied, strong residential base, while continuing to support well- established commercial, business, and retail functions. But making urban development projects successful presents challenges to the transportation system. The ability to redevelop in Downtown Miami depends on how effectively people and goods can travel within the area and adjacent neighborhoods and how Downtown Miami can be connected to other regional centers of commerce. This Miami Downtown Transportation Master Plan (MDTMP) examines recent development trends in Downtown Miami, considers the development vision as stated by area workers, residents, and leaders, and establishes a framework of multimodal transportation system improvements necessary to achieve that vision. The Need and the Opportunity Downtown Miami's current traffic congestion problems are caused in large part by its development successes. Therefore, before the City of Miami and the private development sector could pursue a high-density development program which would bring even greater traffic congestion, community and city leaders determined that a multifaceted, multimodal transportation master plan would be essential to sensibly guide the downtown area's future transportation improvements. Downtown Miami's current traffic congestion problems are caused by its development success. Executive Summary Page ES -7 12390 Miami Downtown Transportation Master. .a Downtown Miami is the focus of global commerce and business for the state of Florida and the economic epicenter of international trade for Miami -Dade County. It has become the gateway to South America, Central America, and the Caribbean Basin for the United States and is a critical component for the continued pursuit of international markets and business opportunities for this country, this state, and the City of Miami. Further, this urban center is not just a gateway, but also a major destination for thousands of domestic and international visitors. The continued growth and development of Downtown Miami is, therefore, vital to the expansion of Florida's international trade and commerce. Growth and development of Downtown Miami are increasingly constrained by its transportation system—a system at a critical juncture for efficiently bringing people, goods, and services to the marketplace. If Downtown Miami is to continue to grow and mature into the global center of commerce envisioned by its community and city leaders, then it is crucial that proper investment in the transportation infrastructure be planned for the long-term, as well as the short-term. Without such investment, traffic congestion will worsen and not only discourage new business and residential investments but also push existing businesses to relocate to other parts of the region, the state, or the country. To become a 24-hour, vibrant, sustainable urban center like New York City, Chicago, or London, the downtown area must attract people to live there. Across "To become a 24-hour, vibrant, sustainable urban center like New York the country over the past half -century, people have City, Chicago, or London, the largely abandoned urban centers for suburban living downtown area must attract people to because of benefits such as good schools and live there." affordable houses with back yards. This migration has been enabled, of course, by reliance on the automobile. In contrast, Downtown Miami is experiencing a recent resurgence of residential development both north and south of the Miami River, but continued work -trip commuting from the suburbs to Downtown Miami naturally brings major traffic congestion. The resurgence of residential development in Downtown Miami can be attributed partly to people's desire to live close to their work, escaping traffic congestion during the peak commuting periods. For residential development to not only continue but increase, people must find in Downtown the amenities common in suburban areas: good schools, entertainment centers, cultural activities, restaurants, and grocery/drug stores. Further, truly successful, vibrant downtowns with strong residential components demand reliable, safe, non -auto means of transportation and streets that are designed with the pedestrian in mind. Yet streets in the majority of "modern" US downtown centers have historically been designed for the automobile. The same holds true for Miami—a young and truly 201h century city. The Executive Summary page ft 3 9 Miami Downtown Transportation Master i ..i Interstate construction era in the 1960s saw elevated roadways built through many well- established neighborhoods along the edges of Downtown. These expressways were constructed to deposit heavy volumes of traffic into the downtown area during the peak hours without much regard for the pedestrian. To contribute to new live -work environments in Downtown Miami, streets must accommodate the pedestrian better and public transit must move citizens far more effectively. Transportation and development are inextricably linked to one another. Planning and investment in the downtown transportation infrastructure can work with land use development to spur office, retail, and residential growth. At the same time, growth and/or redevelopment cannot occur at the visionary levels contemplated by community and city leaders without major improvements to the transportation system in Downtown Miami. "...improving the transportation system of Downtown Miami amounts to good investment of public monies because of.. job creation, residential development in the urban center, and increased tax base." The City of Miami estimates that 15,000 to 34,000 additional dwelling units can be constructed in the downtown area over the next 20 years and more importantly, that they could generate between $15M and $34M in additional annual tax revenues for the city. Thus, improving the transportation system of Downtown Miami amounts to good investment of public monies because of the multiplier effect: job creation, residential development in the urban center, and increased tax base. The Miami Downtown Transportation Master Plan The MDTMP is being developed to set the general framework for future transportation system improvements in the Downtown Miami and to generate a series of more specific transportation project recommendations for the area through 2020. The goal of the MDTMP is "to create a unique, progressive, and vibrant Downtown Miami through a balanced transportation system, preservation of neighborhoods, protection of the environment, and improvement of the community's quality of life." The MDTMP is a result of extended literature research, extensive examinations of stakeholder views, and intensive technical transportation planning analyses. Most of the elements and components of the MDTMPs recommendations resulted from multiple analyses of the downtown transportation system at different levels of development projected for the year 2020, using a state- of-the-art micro -simulation transportation model called Paramics. Executive Summary Page ES -3 12390 Miami Downtown Transportation Master, r The study area for the MDTMP extends from I-95 east to Biscayne Bay and from I-195 south to SE 26 Road. Three development scenarios were examined: (1) the 2020 Baseline projection of "expected" growth anticipated by Miami -Dade County demographers, (2) the 2020 Enhanced projection which is a more aggressive growth scenario based on development trends in the downtown area of the past five to 10 years, and (3) the 2020 Visionary projection which is the most aggressive growth scenario. This 2020 Visionary scenario of development contemplated includes approximately 48,000 more employees and 34,000 more dwelling units in the primary study area compared to 1999. To reach the levels of development envisioned by community and cityh ff leaders, more emphasis is placed on transit use (Metrorail, Metromover, shuttles, etc.) and improving the pedestrian environment. As reflected in the recommended transportation improvements for the MDTMP, employees, residents, and visitors to Downtown Miami will need to significantly reduce their reliance on automobiles to maintain manageable levels of mobility. The More emphasis is placed on transit use. MDTMP not only looks at the "big picture" of Downtown growth and transportation system improvements, but also addresses traditional traffic congestion issues like the bottlenecks caused by the opening of the Brickell Bridge during weekdays. In developing the Miami Downtown Transportation Master Plan, input from community leaders, stakeholders, residents, and employees of the downtown area regarding their transportation needs and desires was consistently sought after and supplied early and often throughout the process. The resulting MDTMP` focuses on multiple modes of transportation to help resolve mobility issues for Downtown Miami and better connect neighborhoods to this area. Further, the MDTMP recommends transportation system improvements needed to turn the vision of a Downtown Miami—a unique, progressive, and vibrant place in which to work, live, and play—into reality Master Plans from Other Cities Extensive research was undertaken to develop the MDTMP. First, one part of this research was directed at reviewing the experiences of other cities that had developed either transportation Executive Summary Page ES -4 12390 Miami Downtown Transportation Master t._... master plans per se, or those general master plans exhibiting a significant transportation component. Second, technical research into planning software was directed at investigating which traffic micro -simulation model could best analyze the transportation problems of Downtown Miami, the residents, workers, employers, and leaders was undertaken virtually throughout the entire study. The starting point for the review included examining reports and other documents of some 30 cities that had gone through some type of downtown master plan development process. From this list it was determined that six urban areas had documented either an overall downtown master plan with an extensive transportation component or a transportation master plan: Denver, CO; Dallas, TX; Tampa and Jacksonville, FL; Charlotte, NC; and Madison, WI, were the six cities selected for more intensive review. The six studies were obtained and reviewed to extract (1) the goals, objectives, and policies and the overall vision of each plan; (2) the methods and tools used for technical analyses; and (3) the types of solutions developed to address the area -specific transportation problems. The Micro -Simulation Model: Paramics Other cities analyzed their transportation system using a wide range of techniques. The MDTMP, however, chose to combine long-range travel forecasting with the precision and sophistication of downtown -specific micro -level traffic simulation. In essence, the amount of daily travel to/from Downtown Miami expected in the year 2020 was "...the Downtown Miami Paramics determined using the Miami -Dade County Florida micro -simulation network is one of the Standard Urban Transportation Modeling Structure largest in the world..." (FSUTMS). However, this regional model lacks the level of detail needed for a full understanding of specific travel patterns within the Downtown Miami area. Therefore, a micro -simulation model was required to replicate traffic conditions down to the individual vehicle level on each roadway in the study area. Further, this micro -simulation model incorporates a transit component to model Metrorail and Metromover and had to simulate unique traffic characteristics in Downtown Miami like the traffic congestion caused by the opening of the Brickell Bridge. The micro -simulation model software Paramics, with its superior graphics and ability to model large networks, was selected after an intense international search. In fact, the Downtown Miami Paramics micro- simulation network is one of the largest in the world, with over 360 intersections and seven modes of travel. Executive Summary Page ES -5 12390 Miami Downtown Transportation Master. _,i Public Participation Understanding the transportation needs of the stakeholders, residents, and employees of Downtown Miami was essential for developing the MDTMP. An extensive public involvement plan was developed that included large-scale public meetings, small group presentations, and various committees that helped to shape different components of the MDTMP. The Downtown Task Force (DTF), with over 40 members from the transportation and business community including elected officials from the City of Miami and Miami -Dade County, acted as the steering committee for the MDTMP and provided feedback on specialized topics throughout the process. From the members of the DTF, specialized committees were developed, including the Technical Committee, the Land Use Committee, and the Evaluation Criteria Committee. The public in general participated with input at three public forums coordinated by the Florida Department of Transportation. Moreover, the public forums were supplemented with approximately 10 small -group presentations hosted by organizations like the Downtown Miami Partnership and the Brickell Homeowners Association. Together, over 20 meetings helped to shape every aspect of the MDTMP, from setting the vision statement to determining the recommended transportation improvements. Development Scenario The starting point for determining future transportation needs was the myriad of transportation problems (1) identified by the analysis of the existing transportation system and (2) recognized by the area stakeholders. However, future transportation improvements were also defined based on three future development scenarios carefully varied for the Downtown Miami area. These future development scenarios — 2020 Baseline, 2020 Enhanced, and 2020 Visionary — have increasing levels of development, and therefore increasing levels of travel demand. Increased development further burdens the transportation system and requires different types of improvements. Each of the 2020 development scenarios (developed by the DTFs Land Use Committee and the City of Miami) is described in detail below: • 2020 Baseline, the most conservative of the development scenarios, is based on the officially adopted countywide population forecasts. Compared to 1999, this scenario increases employment by 18,000 employees and residential uses by 15,000 dwelling units in the core of the study area. • 2020 Enhanced, a more aggressive growth forecast, is based on the development trends seen in the Downtown Miami area in the last five to ten years. Compared to 1999, this Executive Summary Page ES -6 12390 Miami Downtown Transportation Master, __i scenario increases employment by 30,000 employees and residential uses by 23,000 dwelling units in the core of the study area. • 2020 Visionary, the most optimistic and aggressive development scenario, is based on the successful growth trends seen in the Downtown Miami area in the past three to five years. Compared to 1999, this scenario increases employment by 48,000 employees and residential uses by 34,000 dwelling units in the core of the study area by 2020. Transportation System Needs 34,000 additional dwelling units can generate $34M in additional annual taxes for the city. The Paramics model quickly indicated that even the most conservative growth scenario, the 2020 Baseline, would require significant improvements to the highway system and/or a significant shift to transit as a means to accessing Downtown Miami. Fortunately, a fixed guideway system is already in place for Downtown Miami. Metrorail, Miami -Dade County's underutilized mass transit system, runs right through this area. Further, Metrorail's supporting people -mover system, Metromover, can assist with intracity travel far more than it does now. Roadways versus Pedestrian -Friendly Environment Improvements to the roadway system in the study area are challenging. Widening roads in downtown areas is very disruptive to businesses, very expensive due to limited rights-of- way, and generally unfeasible because buildings abut the existing rights-of-way. Further, both widening streets and improving vehicular mobility and speeds conflict with creating a pedestrian - friendly environment for Downtown Miami. Residents, employees, and Residents, employees, and transit riders in Downtown Miami need a safe, pedestrian -oriented environment. Executive Summary Page ES -7 12390 Miami Downtown Transportation Master i transit riders in Downtown Miami need a safe, pedestrian -oriented environment to travel between destinations. The public constantly voiced this need throughout the MDTMP process. Multimodal Improvements Consequently, the main focus on future transportation system improvements shifted from the roadway network to improvements in transit, the pedestrian environment, and other modes of transportation. Ways to affect travel demand like telecommuting, staggered work hours, and more residents in Downtown Miami were also discussed. Critically needed are extensive improvements to the transit system to absorb a large portion of the increased 2020 travel demand. These types of improvements could include shorter headways and more capacity for Metrorail and Metromover, more shuttle systems like the Brickell shuttle, and Metromover lines extended into other areas. Also needed are enhancements of other modes of transportation like bicycles, pedestrians, and water -borne transportation. The MDTMP also addresses vehicular needs like the traffic congestion caused by the Brickell Bridge openings, the confusion of the one-way street system, and the need to create more appropriate vehicle entryways than the current I-95 Distributor Ramps. Three -Tiered Process The specific transportation system improvements to be evaluated consisted of three tiers. Tier 1 included improvements based on suggestions made or problems identified by the public. For example, a public comment that "the streets are confusing and I always get lost" supported converting one-way streets to two-way streets. Tier 2 incorporated improvements proposed in previous studies for Downtown Miami like the removal of the I-95 Distributor Ramps and the creation of a grand boulevard entrance for the downtown area. Tier 3 included a series of improvements determined by the Technical Advisory Committee like ITS to warn motorists of Brickell Bridge openings. In all, over 40 improvement strategies, covering many modes of transportation and many specific projects, were developed for each subarea of Downtown Miami. The transportation improvements were input with the travel demand from various future development scenarios (2020 Baseline, 2020 Enhanced, and 2020 Visionary) into the Paramics model to test their level of effectiveness. The Technical Evaluation Committee considered the results from the traffic simulation and other measures of impact. Each transportation system improvement was evaluated against the study goals and objectives and its expected benefits. The Evaluation Criteria Committee determined weighted scores for each transportation system improvement based on six goals/benefits, which included transportation, social, economic, environmental, growth and development, as well as transportation investment. Executive Summary Page ES -8 12390 Miami Downtown Transportation Master, _.t Recommendations and Implementation Evaluated according to the goals and objectives of the MDTMP, the transportation system improvements were ranked as recommendations. Several recommendations were repeated throughout the entire study area, like improving transit service (frequency, reliability, and state-of- the-art user -information systems), developing a network of pedestrian -oriented corridors, and converting one-way streets to two-way. Other recommendations, like removing a portion of I-395, were more sub -area. The recommendations were further stratified by sub -area. Examples Some specific improvements include: • creating a Metromover loop in the Brickell Financial District • implementing a water taxi between Brickell Key and the mainland • constructing a tunnel under the Miami River at SW 1 Avenue • extending Metromover to the Wynwood area • extending the M -Path for bicycles • modifying North 14 Street from I-95 to Biscayne Boulevard • completing Baywalk from Pace Park to Bayside. See Exhibits 1 through 6, shown at the end of the document, for complete graphic and tabular displays of the recommended transportation system improvements by subarea. Schedule The MDTMPs Technical Evaluation Committee determined an implementation schedule for each improvement: Phase 1 — through 2010, Phase 2 — 2011 through 2015, and Phase 3 — 2016 through 2020. The schedule recognizes that more detailed studies, conceptual and final designs, and construction timeframes must be accommodated. See Exhibits 1 through 6, shown at the end of this document, for the expected implementation phase for each improvement. The Half -Cent Transit Sales Tax The philosophy of the Downtown Task Force was that this MDTMP should focus on visionary solutions to its transportation system. Securing the funding for the transportation improvements would follow with political and community leadership. In November 2002, the voters in Miami - Dade County overwhelmingly passed the People's Transportation Plan. This plan levies a half - Executive Summary Page ES -9 12390 Miami Downtown Transportation Master . cent transit sales surtax to provide (1) more and higher quality transit and (2) funding to municipalities for roadway and transportation projects. Twenty percent of the sales surtax proceeds will be distributed to municipalities based on their population. Each municipality shall apply 20% of its share of the sales surtax proceeds towards transit improvements, with the balance to be used for other transportation/roadway projects. It is estimated that the City of Miami, being the largest municipality in Miami -Dade County, will receive annual surtax proceeds of The '/2 percent Sales Tax will enable the Implementation of over $1 OM. This new, dedicated projects like the removal of the 1-95 Distributor Ramps. funding source will enable the implementation of many of the MDTMPs recommendations by the year 2020. Conclusion The MDTMP involved hundreds of individuals collaborating on a vision of a future transportation system that supports continued growth and development of Downtown Miami's business community, fostering a pedestrian -friendly environment that attracts people to live in the downtown area, while promoting multimodal mixes of projects to create a world-class transportation system. The transportation system improvements developed for the MDTMP set the framework for turning that vision into reality. The cornerstone of the MDTMP is a series of transit improvements, supplemented by roadway congestion treatments and the creation of a pedestrian -oriented environment for the Downtown Miami area. Moreover, improvements to facilities for other modes of travel like bicycles, mopeds, and water -borne transportation, are introduced in the MDTMP to achieve a truly multimodal transportation system. Executive Summary Page ES -10 12390 Exhibit I - Brickell Area Improvements i 41L I fil - !! � j IN "IN �l lo llpl�, — .0 1,74, J� n M HbffilrROMM TO RWm"IUIA:LM Al" Miami,Downtown Transportation Master Plan Miami Downtown Transportation Master. Recommended Improvement Phase Create a Transit Free -Fare Zone 1 Implement Intelligent Transportation Systems (ITS) alternatives to help I for bridge openings Improve transit amenities I Connect Brickell to other neighborhoods with transit I Develop pedestrian corridors I Implement Miami River Greenway Action Plan for the south side I of the Miami River Convert one-way streets to two-way streets 1 Connect Brickell Shuttle to Flagler Shuttle 1 Construct a new tunnel under the Miami River at SW I Avenue 2 Extend SE I Avenue from SE 8 Street to SE 5 Street 2 Complete Downtown DDA Downtown signage plan I Loop Metromover through the Brickell Financial District 3 Improve bicycle routes/facilities I Provide shuttle system for the Brickell residential areas 1 Implement traffic calming alternatives through Brickell residential areas I Extend the Metromover to SE 26 Road 3 Provide a water taxi from Brickell Key to the Riverwalk Metromover station I Depress 1-95 and create a Grand Boulevard 3 Note: Phase 1: Implementation by 2010, Phase 2: Implementation by 2015, Phase 3: Implementation by 2020 Executive Summary Page ES -12 12390 Miami Downtown Transportation Master i Executive Summary Page ES -13 12390 Miami Downtown Transportation Master. Recommended Improvement Phase Create a Transit Free -Fare Zone I Provide pedestrian connections from Bayside to AA Arena 1' Extend Miami Beach light rail (Baylink) into downtown 2 Convert one-way streets to two-way streets 1 Improve transit amenities 1 Connect CBD to other neighborhoods with transit I Complete the Flagler Street Corridor improvements I Develop pedestrian corridors 1 Implement Miami River Greenway Action Plan for the north side 1 of the Miami River Re -align Metromover and add new station at DuPont Plaza area 1 Implement Intelligent Transportation System (ITS) for special events l Complete Biscayne Boulevard improvements 1' Construct a new tunnel under the Miami River at SW 1 Avenue 2 Complete DDA Downtown signage plan 1 Extend W 1 Avenue Corridor (Arena Boulevard) 2 Improve bicycle routes/facilites 1 Extend fixed guideway to AA Arena and Seaport 3 Remove Distributor Ramps and provide a Grand Boulevard on S 3 St 2 Implement Flagler`Shuttle I Provide Port Boulevard U-turn I Implement shuttle system from Watson Island l Provide a Transit Greenway 3 Provide a I-95 NB on-ramp at NW 6 St to provide access to WB SR 836 & 2 Improve N 5 & 6 Streets for truck traffic Provide Commuter Rail to Broward County 3 Provide a water taxi from Watson Island I, Depress I-95 and create a Grand Boulevard 3, Note: Phase 1: Implementation by 2010, Phase 2: Implementation by 2015, Phase 3: Implementation by 2020 Executive Summary Page ES -14 12390 Miami Downum n Trunspornuion Mcicler. . Executive Summary Page ES -1 Miami Downtown Transportation Master. Recommended Improvement Phase Create a Transit Free -Fare Zone 1 Extend Miami Beach light rail (Baylink) 2 Connect O/OT/PW with other neighborhoods with transit 1 Develop pedestrian corridors l Convert one-way streets to two-way streets I Implement Intelligent Transportation System (ITS) for special events 1 Provide a'pedestran walkway along the Bay from Pace Park to Bayside I Complete Biscayne Boulevard improvements 1 Improve pedestrian connections to Bicentennial Park I Provide tunnel from Seaport to Watson Island 3 Extend W 1 Avenue Corridor Extension 2 Implement DDA Downtown signage plan I Improve bicycle routes/ facilities 1 Provide a shuttle system into Wynwood 1 Depress 1-395 to provide Grand Boulevard 3 Extend Metromover into Wynwood 3 Improve N 14 St from I-95 to Biscayne Blvd l Provide Commuter Rail to Broward County 3 Provide a new partial I-95 Interchange at NW 29 St l Provide a new 1-95/NW 14 St Interchange 2 Depress I-95 and create a Grand Boulevard 3 Note: Phase 1: 2020 Executive Summary Page ES -16 12390 Miami Downtown Transportation Master. i 1.0 INTRODUCTION he City of Miami—an internationally recognized hemispheric financial and commercial hub—is situated for evolving into a truly world class city. Now City leadership is seeking to advance this evolution by transforming a predominantly daytime business -oriented downtown into a vibrant, 24-hour urban center. The City has an excellent opportunity to pursue an aggressive urban development program for the downtown area. City leaders can pursue a program of policies and projects that help establish that 24-hour urban environment. They can promote plans and projects that include entertainment components as well as a varied, strong residential base, while continuing to support well-established commercial, business, and retail functions. But making urban development projects successful presents challenges to the transportation system. The ability to redevelop in Downtown Miami depends on how effectively people and goods can travel within the area and adjacent neighborhoods and how Downtown Miami can be connected to other regional centers of commerce. This Miami Downtown Transportation Master Plan (MDTMP) examines recent development trends in Downtown Miami, considers the development vision as stated by area workers, residents, and leaders, and establishes a framework of multimodal transportation system improvements necessary to achieve that vision. 1.1 The Need and the Opportunity Downtown Miami's current traffic congestion problems are caused in large part by its development successes. Therefore, before the City of Miami and the private development sector could pursue a high-density development program which would bring even greater traffic congestion, community and city leaders determined that a multifaceted, multimodal transportation master plan would be essential to sensibly guide the downtown area's future transportation improvements. Downtown Miami is the gateway to South America, Central America and the Caribbean Basin. Introduction Page I - 1 1390 Miami Downtown Transportation Master. Downtown Miami is the focus of global commerce and business for the state of Florida and the economic epicenter of international trade for Miami -Dade County. It has become the gateway to South America, Central America, and the Caribbean Basin for the United States and is a critical component for the continued pursuit of international markets and business opportunities for this country, this state, and the City of Miami. Further, this urban center is not just a gateway, but also a major destination for thousands of domestic and international visitors. The continued growth and development of Downtown Miami is, therefore, vital to the expansion of Florida's international trade and commerce. Growth and development is vital for expanding international trade and commerce. Growth and development of Downtown Miami are increasingly constrained by its transportation system—a system at a critical juncture for efficiently bringing people, goods, and services to the marketplace. If Downtown Miami is to continue to grow and mature into the global center of commerce envisioned by its community and city leaders, then it is crucial that proper investment in the transportation infrastructure be planned for the long-term, as well as the short-term. Without such investment, traffic congestion will worsen and not only discourage new business and residential investments but also push existing businesses to relocate to other parts of the region, the state, or the country. To become a 24-hour, vibrant, sustainable urban center like New York City, Chicago, or London, the downtown area must attract people to live there. Across the country over the past half -century, people have largely abandoned urban centers for suburban living because of benefits such as good schools and affordable houses with back yards. This migration has been enabled, of course, by reliance on the automobile. In contrast, Downtown Miami is experiencing a recent resurgence of residential development both north and south of the Miami River, but continued work -trip commuting from the suburbs to Downtown Miami naturally brings major traffic congestion. Introduction Page 1 - 2 12390 Miami Downtown Transportation Master, The resurgence of residential development in Downtown Miami can be attributed partly to people's desire to live close to their work, escaping traffic congestion during the peak commuting periods. For residential development to not only continue but increase, people must find in Downtown the amenities common in suburban areas: good schools, entertainment centers, cultural activities, restaurants, and grocery/drug stores. Further, truly successful, vibrant downtowns with strong residential components demand reliable, safe, non -auto means of transportation and streets that are designed with the pedestrian in mind. Yet streets in the majority of "modern" US downtown centers have historically been designed for the automobile. The same holds true for Miami—a young and truly 201h century city. The Interstate construction era in the 1960s saw elevated roadways built through many well-established neighborhoods along the edges of Downtown. These expressways were constructed to deposit heavy volumes of traffic into the downtown area during the peak hours without much regard for the pedestrian. To contribute to new live -work environments in Downtown Miami, streets must accommodate the pedestrian better and public transit must move citizens far more effectively. `v Transportation and development are inextricably linked to one another. Planning and investment in the downtown transportation infrastructure can work with land use development to spur office, retail, and residential growth. At the same time, growth and/or redevelopment cannot occur at the visionary levels contemplated by community and city leaders without major improvements to the transportation system in Downtown Miami. The City of Miami estimates that Investment in transportation infrastructure can spur office, 15,000 to 34,000 additional dwelling retail and residential development. units can be constructed in the downtown area over the next 20 years and more importantly, that they could generate between $15M and $34M in additional annual tax revenues for the city. Thus, improving the transportation system of Downtown Miami amounts to good investment of public monies because of the multiplier effect: job creation, residential development in the urban center, and increased tax base. Introduction pat � 3 Miami Downtown Transportation Master. 1.2 The Miami Downtown Transportation Master Plan The MDTMP is being developed to set the general framework for future transportation system improvements in the Downtown Miami and to generate a series of more specific transportation project recommendations for the area through 2020. The goal of the MDTMP is "to create a unique, progressive, and vibrant Downtown Miami through a balanced transportation system, preservation of neighborhoods, protection of the environment, and improvement of the community's quality of life." The MDTMP is a result of extended literature research, extensive examinations of stakeholder views, and intensive technical transportation planning analyses. Most of the elements and components of the MDTMPs recommendations resulted from multiple analyses of the downtown transportation system at different levels of development projected for the year 2020, using a state- of-the-art micro -simulation transportation model called Paramics. The study area for the MDTMP extends from I-95 east to Biscayne Bay and from I-195 south to SE 26 Road. Three development scenarios were examined: (1) the 2020 Baseline projection of "expected" growth anticipated by Miami -Dade County demographers, (2) the 2020 Enhanced projection which is a more aggressive growth scenario based on development trends in the downtown area of the past five to 10 years, and (3) the 2020 Visionary projection which is the most aggressive growth scenario based on development trends within the past several years. This 2020 Visionary scenario of development contemplated includes approximately 48,000 more employees and 34,000 more dwelling units in the primary study area compared to 1999. To reach the levels of development envisioned by community and city leaders, more emphasis is placed on transit use (Metrorail, Metromover, shuttles, etc.) and improving the pedestrian environment. As reflected in the recommended transportation improvements for the MDTMP, employees, residents, and visitors to Downtown Miami will need to significantly reduce their reliance on automobiles to maintain manageable levels of mobility. The MDTMP` not only looks at the "big picture" of Downtown growth and transportation system improvements, but also addresses traditional traffic congestion issues like the bottlenecks caused by the opening of the Brickell Bridge during weekdays. In developing the Miami Downtown Transportation Master Plan, input from community leaders, stakeholders, Introduction More emphasis needs to be place on transit. Miami Downtown Transportation Master, residents, and employees of the downtown area regarding their transportation needs and desires was consistently sought after and supplied early and often throughout the process. The resulting MDTMP focuses on multiple modes of transportation to help resolve mobility issues for Downtown Miami and better connect neighborhoods to this area. Further, the MDTMP recommends transportation system improvements needed to turn the vision of Downtown Miami—a unique, progressive, and vibrant place in which to work, live, and play—into reality. Introduction Page I - 5 12390 Miami Downtown Transportation Master n 2.0 BACKGROUND Extensive research was undertaken to develop the MDTMP. First, one part of this research was directed at reviewing the experiences of other cities that had developed either transportation master plans per se, or those general master plans exhibiting a significant transportation component. Second, technical research into planning software was directed at investigating which traffic micro- simulation model could best analyze the transportation problems of Downtown Miami, the residents, workers, employers, and leaders was undertaken virtually throughout the entire study. 2.1 Master Plans from Other Cities The starting point for the review included examining reports and other documents of some 30 cities that had gone through some type of downtown master plan development process. From this list it was determined that six urban areas had documented either an overall downtown master plan with an extensive transportation component or a transportation master plan: Denver, CO; Dallas, TX; Tampa and Jacksonville, FL; Charlotte, NC; and Madison, WI, were the six cities selected for more intensive review. The six studies were obtained and reviewed to extract (1) the goals, objectives, and policies and the overall vision of each plan; (2) the methods and tools used for technical analyses; and (3) the types of solutions developed to address the area -specific transportation problems. 2.1.1 Madison, Wisconsin The transportation plan for Madison emphasizes flexibility in mode choice. The plan suggests increasing the efficiency of the transportation system by implementing strategies that increase auto occupancy, reduce conflicts between modes of travel like automobile and pedestrians, and maximize capacity with low-cost improvements. Greater reliance will be placed on mass transit by adopting a Transit Priority Corridor Concept, which is expected to increase transit ridership by 50% by 2020. Higher levels of congestion will be accepted before considering new or expanded roadways. A Traffic Direction Concept, however, will be implemented to draw auto travel onto major corridors and away from residential areas. A Balanced Transportation Concept was adopted to promote transit, carpooling, and other travel options, including travel reduction strategies such as telecommuting. The Madison plan also recognizes the importance of providing for the area's parking needs in a manner that complements the adopted land use and transportation plans, including alternatives to shift all -day commuter parking away from the city center. Finally, the Activity Center Linkage Plan is aimed at maintaining mobility and accessibility throughout the region. Backgrouml Page 2 - 1 12390 Miami Downtown Transportation Maste) n 2.1.2 Charlotte, North Carolina The Charlotte Plan was driven by the desire to support the economic vitality of the area as well as following strategic directives from the U.S. Department of Transportation via its 1998 Transportation Equity Act for the 21" Century (TEA -21). The plan strives to balance both local and regional transportation needs by looking at both transportation and land use comprehensively. The plan components include increasing not only the area's accessibility and mobility by maximizing the use of many Charlotte wants "to provide modes of travel such as biking, walking, and transit. better connections between Recommendations include a mass transit system from Uptown neighborhoods." Charlotte to locations within each district; enhancements and improved maintenance of the various modes of travel; traffic calming; an interconnected system of sidewalks; a Greenway System; and provisions for bicyclists to ride safely and efficiently between districts. Increased system efficiency is promoted through ridesharing and alternative work schedule strategies. The plan fosters the integration and connectivity of all transportation systems including freight. There is a specific element dealing with "City Within the City" Transit Strategies to provide better connections between neighborhoods. Land use strategies are also part of the plan. Integrated centers of intense development were identified in an effort to curb urban sprawl. The Charlotte plan also addresses the appropriateness of residential development in proximity to employment areas, commercial centers, parks, and other land uses. Last, the plan encourages higher densities along designated transit corridors, and the preservation of rail corridors for existing and future transportation needs. 2.1.3 Dallas, Texas The Dallas plan is, essentially, a (highway emphasis) Thoroughfare Plan. Nevertheless, it has four major components, one of which is transit -specific. The four elements are: Freeways/Toll and Major Roads; the Dallas Area Rapid Transit (DART) system; Bottleneck Removal; and Facility Management. The freeway element provides for the reconstruction and improvements of major roads. The DART component develops a major rapid transit corridor that will substantially improve transit service. The Bottleneck Removal plan consists of special studies and low-cost improvements such as turn lanes and grade separation at critical intersections. The Facility Management component aims to maximize the efficiency of the transportation system through a series of Transportation System Management (TSM) and Transportation Demand Management (TDM) strategies. Backgrounde Pa 2 - 12K3 0 Miami Downtown Transportation Master n 2.1.4 Denver, Colorado Denver developed a transportation plan very responsive to the needs of the area residents through intense public involvement. The plan sets the basis for the creation of a permanent, citizen -based Transportation Advisory Committee and the hiring of additional staff to address day-to-day neighborhood -level traffic management and calming issues. The plan aims to balance the access needs of neighborhoods, local businesses, and downtown businesses, while directing traffic toward specific major routes and away from residential areas. The Denver plan relies heavily on travel behavior modification through physical traffic rerouting, police enforcement of traffic violations, and severe penalties for traffic Denver's plan "aims to balance access needs... while directing traffic... away from residential areas." violations. It also provides for designated lanes and signal priority for transit and carpool vehicles to make these modes more competitive with the private automobile. Additionally, the Denver plan also promotes a network of on- and off-street bicycle facilities and recommends specific roadway improvements consistent with strategies for each corridor. Basically, corridors were designated for either: increased vehicular capacity; reduced vehicular capacity (to encourage other modes); or unchanged capacity (that will naturally result in more congestion and voluntary mode change to transit, carpooling, etc. over time). 2.1.5 Jacksonville, Florida The plan for Downtown Jacksonville considered the unique character of the area and developed a multi -modal plan comprehensively addressing specific issues. The plan recognized the challenge of promoting modes of travel—other than private autos—to produce an area that is essentially free of major congestion and has abundant low-cost parking. The downtown is divided into 10 districts, with land uses clearly defined, along with a Transportation Support System that considers vehicular access, parking, pedestrian -friendly settings, transit, etc. The bases of the Jacksonville plan are (1) the classification of corridors based on their desirable multi -modal use and (2) design standards for such classifications. Roadway signage supports this concept of corridor classifications. Provisions encourage the development of parking garage facilities and discourage surface parking lots. Development of peripheral commuter parking is introduced, while visitor parking in the core of downtown is encouraged to make the area more accessible to visitors. On -street parking is also promoted in commercial and residential areas as a traffic calming tool. The plan's transit component promotes the expansion of the downtown Skywalk (people mover system), the integration of transit into the planning of downtown development projects, and the creation of regional transit centers with park-and-ride facilities. Pedestrian facilities are also Background Page 2 - 3 12390 Miami Downtown Transportation Maste, in improved with the creation of deigns standards, including minimum sidewalk widths of 12 ft. These standards will be applied throughout the area. 2.1.6 Tampa, Florida Among several goals, the Tampa plan supports the economic vitality of the area. One component aimed at such a goal is to reduce traffic congestion by improving existing roads and constructing new ones, as well as managing travel demand through TDM techniques including telecommuting. Additionally, waterborne transportation is also promoted, increasing travel capacity across the Bay, thus relieving the traffic strain on the bay bridges. Level -of -service standards are useful for promoting infill development and reducing urban sprawl. Truck traffic routes channel trucks away from residential areas. Transit will continue to play a vital role for downtown. The plan recommends completing rail transit stations, integrating transit into major activity centers and implementing a bikes -on -buses program. Circulation systems are recommended for major activity centers, and airport/seaport connections are also addressed. High-density development is recommended for transit -oriented corridors. Improvement of transit performance will be encouraged through the adoption of minimum standards. High-speed rail urged to enhance regional and inter -city transportation. The Tampa plan creates urban design criteria to improve the aesthetics of transportation facilities as well as to make the facilities more user-friendly with treatments such as landscaping, noise abatement, and preservation of scenic views. Fiscally, the plan intends to maximize benefits by using low-cost improvements as much as possible and encouraging private participation in transportation improvements such as transit stations. 2.2 Previous Downtown Miami Transportation Studies More than 25 transportation, planning, and roadway reports previously prepared for the Downtown Miami area were reviewed and summarized to help develop the MDTMP. A complete listing of these studies with a brief description is shown in Appendix A. A few of the major reports used in the MDTMP are described below. • Miami Surface Shuttle Services: Feasibility Study for Transit Circulator Services in Downtown Miami, Brickell. Overtown, and Airport West (2000) - This report analyzed the potential of Flagler Street and Brickell to support shuttle services and to develop alternative routes, representing their levels of service along with the approximate capital and operating services associated with each. This study identified potential sources of funds for paying for these services. Background Page 2 - 4 12390 Miami Downtown Transportation Maste. on • I-95 Dupont Plaza Ramps, Alternative Feasibility Study (1993) - This study developed a preliminary Grand Boulevard concept as a Downtown Miami entryway, similar to that developed for Biscayne Boulevard located on the eastern edge of the downtown area, and determines the feasibility of reconstructing the existing I-95 distributor ramps that currently access Downtown Miami via the Dupont Plaza area. • Downtown Miami Circulation Study (2000) - This study analyzed the existing Downtown Miami roadway network to identify critical traffic demand locations and the potential solutions, and areas with available capacity. The study recommends a series of operational improvements throughout the area. • Miami River Greenway Action Plan - This is a comprehensive study of both sides of the entire Miami River Corridor. Existing and potential land uses are reviewed. The corridor is then divided into different sections with similar characteristics. Optimal improvements for both banks of the river are recommended by section. The objective is to make the river more accessible and user-friendly while improving aesthetics in order to maximize use of the river corridor by the public in general. The objective of this plan is to make the Miami River more accessible and user- friendly. • DDA Downtown Signage Plan - The DDA proposed a system of signs for the Downtown Miami area. The plan has three components: a sectors signage plan, a trailblazer signs component, and an information kiosk element. The system aims to facilitate access and circulation to/from and within Downtown Miami. The area covered by the system is subdivided into several sectors with easily identifiable names and color logos for each sector. The initial stage of the system—sector signs—is already in place. • Bicentennial Park: Becoming Miami's Premier Park - This is an extensive study of the features of the park and well as its potential. Several development options are evaluated through a process that involved the public extensively. The evaluation is followed by recommendations for making the park safe, more accessible, and user-friendly as well as improving aesthetics. The new plan maximizes use of the park by the general public. Three alternatives were developed for the park. Background Page 2 - 5 12390 Miami Downtown Transportation Maste, in 2.3 Technical Evaluation Models and Methods The Future Year (FY) travel demand trend for urbanized areas (UAs) is usually forecast by using urban area or regional "transportation planning models." These models divide the total area studied, in this case, Miami -Dade County, into small segments called traffic analysis zones or TAZs. A network of major streets and expressways, and of transit lines — bus routes, urban rail lines, people mover guideways, and commuter rail lines—is developed to symbolize the major transportation system elements of the study area. To forecast future year travel, Miami - Dade County demographers and economists predict growth in various categories of residences and employment for each TAZ. Travel is generated out of, and into, each zone through models that link the amount of activity in each zone (housing units, jobs, school size, retail stores, etc.) with associated travel. Trips from TAZs are usually generated by people leaving their homes to perform some activity; conversely, trips to TAZs are usually generated by people arriving to perform some activity, such as going to their workplace, or shopping, getting health care, or enjoying recreational activities. Trips entering and exiting each zone are calculated. Land Un Sconado 2 &OW Ody 0 a 0 Land U" Scoaulo 3 CenvM i Palod 0 6 0 )s0 fod 0&0 Macro -Model FSUTMS Micro -Madel PARANCS Trips are then distributed between zones to simulate travel by a trip distribution model, based on the way that people make travel choices. Large matrices are developed that Modeling flowchart for a Macro and Micro model. record travel from each zone to every other zone and vice versa. Large activity centers tend to attract travel from many TAZs, some far away, while other TAZs with less activity attract fewer trips usually from more areas in closer proximity. Small zones also tend to produce fewer trips because there are fewer housing units, and Background Page t - 6 12390 Miami Downtown Transportation Master n large zones—those with numerous high-rise apartment buildings, for example—tend to produce large numbers of trips. The modes of travel that may take between zones are then forecast in the mode choice step. For those TAZs with transit service, people might walk, drive alone, or carpool to a transit/bus stop. Mode choice, a relatively complex function of the characteristics of the traveler and those of the mode, usually results in relatively low "mode splits" (proportions or travelers taking transit) because prime determinants of the mode selected are travel time and costs. Cars almost always travel more quickly between places and start closer to origins, and arrive closer to destinations, than do transit modes. At this stage in the evaluation, some key factors are known: the volume of trips coming out of and going into each zone, the number of trips between zones, and the modes taken by travelers to make those trips. The final step is to assign travelers in their vehicles the routes they follow to go from origins to destinations. The auto trips are assigned to the highway network in a highway assignment model, and transit trips are assigned to the transit system of bus, rail, and people -mover vehicles and routes in a transit assignment model. Roadways congest and travel times increase as roadways experience increasingly heavy traffic loads. These transportation planning models are at present sufficient to develop reasonable forecasts of travel demand and projections of travelers by mode in urbanized areas such as Miami -Dade County or the South Florida region. They are routinely applied to estimate needs that can be addressed by building major capital, capacity -increasing projects like expressways or Metrorail, widening roads such as Biscayne Boulevard or 27th Avenue, or adding buses to routes. Traffic simulation models examine the movement of cars, trucks, buses, rail vehicles, and people movers at the local street level. However, they are insufficient to examine small subareas, and they are truly inadequate to address many options for improving the operation of transportation systems — many, if not most of which are of intense interest and vital concern to areas like the Miami Downtown. These travel model characteristics and constraints are understood by the transportation planning community, and specialized, small -area traffic simulation models have been developed to meet the need. Traffic simulation models do not forecast the demand for travel, nor do they forecast mode choice, nor perform trip distribution. They do, however, examine at the local street -by -street, block -by -block, driveway -by -driveway levels the ebb and flow of traffic over specified periods, and the movement of cars, trucks, buses, rail vehicles, and people -movers on the street system. Traffic simulation models take into account stop signs, bus stops, and traffic signals and signalization Background Page I Miami Downtown Transportation Master n schemes as well as roadway size (number of lanes, lane widths, etc.) and also account for typical driver behaviors in the area(s) to be modeled. These "micro -simulation models," as they are also known, address the highly detailed, multimodal, capital, and most importantly, operational transportation system projects and improvement strategies being considered to meet the needs of Downtown Miami. The transportation planning model is used to develop travel demand across the urbanized area, and to estimate the flows of vehicles on major roadways and transit systems for a given future year, based upon projections of the amount and location of residential and commercial growth and development expected to occur between the present and the target year. Transportation system improvements funded or at least solidly programmed for implementation are incorporated into the highway and transit networks. Travel to, from, and between the TAZs used to define the Downtown from the transportation planning model are input into the traffic simulation model, where they can be appropriately analyzed. Here, unlike in the larger, coarser planning models, effects of improvements such as changing streets from one-way to two-way, changing traffic signal cycles, adding rail or people -mover lines, adding bus circulators, and adding or deleting lanes from roads and building new roads can all be appropriately tested and analyzed. The Downtown Task Force also understood this difference between transportation planning models and traffic simulation models, and the need to incorporate a state -of -the -practice traffic simulation model in development of the MDTMP was included from the beginning. City, county, and state transportation planners associated with the project, along with the Task Force, planned from the beginning for the acquisition and use of a traffic simulation model. It will be an excellent tool to gauge how changes in development will affect the transportation system on the level experienced by daily users of that system—how traffic will congest, bunch at places where vehicles turn, queue up at traffic signals, slow for trucks, wait for bridges to open and close, etc. The MDTMP Task Force envisioned building a simulation model so that tracking changes in development and changes in the transportation system, and their combined impacts on the Miami Downtown Transportation Master Plan could be regularly evaluated into the future. That way, the methods and models used in the development of the initial MDTMP could be continually applied to update and maintain the currency of the plan as development and transportation system changes occur. Background Page 2 - 8 12390 Miami Downtown Transportation Mastet n 2.4 The Micro -simulation Model for Downtown Miami: Paramics Other cities analyzed their transportation system using a wide range of techniques. The MDTMP, however, chose to combine long-range travel forecasting with the precision and sophistication of downtown -specific micro -level traffic simulation. A micro -simulation model was required to replicate traffic conditions down to the individual vehicle level on each roadway in the study area. Further, this micro -simulation model incorporates a transit component to model Metrorail and Metromover and had to simulate unique traffic characteristics in Downtown Miami like the traffic congestion caused by the opening of the Brickell Bridge. The micro -simulation model software Paramics, with its superior Paramics Model Network for Downtown Miami. graphics and ability to model large networks, was selected after an intense international search. In fact, the Downtown Miami Paramics micro -simulation network is one of the largest in the world, with over 360 intersections and seven modes of travel. The micro -simulation model network was developed with information from a multitude of sources. The effort also required great detail to describe the transportation system. This detail allowed very precise replication of minute -by -minute travel conditions throughout the entire study area. Before the model was put into use, however, it was validated to replicate existing conditions using a very large amount of traffic count information and extensive observation of the system. The validation results, both visually and statistically, were found to be acceptable. Additionally, use of the Paramics model for future conditions simulation required development of travel -patterns information to and from a large number of small zones throughout Downtown Miami. This information was extracted from the regional model travel forecast for each of the three land use scenarios. The data was then converted to hourly trips for the three times of the day analyzed. Background Page 2 - 9 12390 Miami Downtown Transportation Maste. 4n "The Downtown Miami Paramics micro -simulation network is one of the largest in the world, with over 360 intersections and seven modes of travel." Finally, the Paramics model generated a mammoth amount of system -wide and location -specific performance measurements that were used for the evaluation of the recommended improvements. The simulation outputs confirmed that the study recommendations would result in a good balance of level of service for all travel modes while achieving the study goals and objectives. Background Page 2 - 10 12390 Miami Downtown Transportation Macte, _n 3.0 PUBLIC PARTICIPATION nderstanding the transportation needs and concerns of the Downtown Miami stakeholders — the residents, workers, employers was essential for developing the MDTMP. Identification of these needs and concerns ensures they will be properly addressed as part of the process. An extensive public involvement program was developed that included a steering committee, community leader or local professional based technical advisory committees, large-scale public meetings, and small group presentations in ongoing (Community Outreach) efforts that helped to shape different components of the MDTMP. 3.1 Downtown Task Force The Downtown Task Force (DTF) is a standing committee of Downtown Miami business owners and leaders, representatives of Downtown Miami service and business organizations, City and County professionals, and City and County elected officials whose Districts encompass all or parts of Downtown Miami. The DTF acted as steering The Co -Chairmen of the Downtown committee for the MDTMP and provided feedback on Task Force are City of Miami virtually all discussion points throughout the MDTMP Commissioner Johnny Winton and development process. The DTF has over 40 members Miami -Dade County Commissioner Bruno Barreiro. (see Appendix B) from the transportation and business community. The Co -Chairmen are City of Miami Commissioner Johnny Winton and Miami -Dade County Commissioner Bruno Barreiro. Specialized technical committees were developed based on members from the DTF, and included the Technical Committee, the Land Use Committee, and the Evaluation Criteria Committee. 3.2 Technical Committee The Technical Committee was comprised of 10 members representing a variety of transportation planning and operating -related agencies with interests, projects, or studies in or affecting the Downtown Miami area. The Technical Committee provided transportation planning and engineering guidance throughout the entire process as well as specific input on specialized technical topics such as selection and validation of the microsimulation model, and the technical evaluation proposed transportation improvement projects and alternatives. Public Participation Page 3 - l 12.90 Miami Downtown Transportation Master _ .n 3.3 Land Use Committee Proposing, calculating, and evaluating the future land use scenarios which were used to develop the projections of future year travel and system needs, was a critical component of the MDTMP. The Land Use Committee developed of the land use projections representing the 2020 Baseline, 2020 Enhanced, and 2020 Visionary Downtown Miami growth and development scenarios. This group was comprised of planning professionals from the City of Miami, the Miami—Dade MPO, Miami - Dade County Planning Department, FIU, and several landowner representatives including Downtown Miami real estate professionals. 3.4 Evaluation Criteria Committee The Evaluation Criteria Committee was comprised of more than 25 members representing a cross section of interests in Downtown Miami. The Evaluation Criteria Committee validated the study's vision, goals, and objectives and established the relative importance of the weighted factors to be used in the evaluation of alternatives. 3.5 Community Outreach and Public Involvement Meetings The general public with interest in the greater Downtown Miami area was invited to and participated in three public forums coordinated by the Florida Department of Transportation. One meeting was held in each of the three study sub -areas (Brickell, CBD, and Omni/Overtown/Park West) to help ensure representation and participation by residents, workers and business and civic interest of the entire study area: Public Forum #1 • Location: • Date: • General Purpose: Public Forum #2 • Location: • Date: • General Purpose: Public Forum #3 • Location: • Date: • General Purpose Miami -Dade Community College, Wolfson Campus (CBD) April 9, 2001 Explain study and seek preliminary public input MD Public School System Administrative Building (Omni) October 4, 2001 Present area problems and possible solutions, seek input First Presbyterian Church (Brickell) October 22, 2002 Present study recommendations, seek input and feedback Public Participation Page 3 - 2 12390 Miami Downtown Transportation Master n These forums were advertised in newspapers and promoted through fliers, phone calls, word-of- mouth, and e-mail involving contacting many leaders in the business, development, and neighborhood and homeowner communities within and near Downtown Miami. At each public forum the study was described to the interested parties. Participants' active involvement, ideas, thoughts and responses were not only welcomed but requested. The project team made it a priority to While the level of community participation at these obtain public input by going into the events varied, valuable, meaningful input was obtained community with the details of the study. in both oral statements and commentary by responses to written questionnaires and e-mail (see Appendix Q. The input sought from the public included: opinions related to the goals and objectives of the study; what they perceived as transportation problems; their views about both general and specific areas that needed to be improved; as well as their suggestions for possible solutions. The public forums were supplemented with 10 small -group presentations hosted by organizations like the Downtown Miami Partnership and the Brickell Homeowners Association. A list of the meetings and groups that provided input is included in Appendix D. Together, over 20 meetings were held to help gather public input to shape every aspect of the MDTMP, from setting the vision statement, through providing project suggestions, to determining the recommended transportation improvements. These public forums and meetings involved more than 250 individuals. The MDTMP is thus truly responsive to the needs of area stakeholders. Public Participation Page 3 - 3 12300 Miami Downtown Transportation Master n 4.0 DEVELOPMENT SCENARIOS he starting points for determining future transportation needs were the myriad of transportation problems identified by the analyses of the existing transportation system and recognized by the area stakeholders. However, future transportation improvements are also broadly based upon (1) projections of growth and development to a future year and (2) an assumed or desired transportation system in that future year. Increases in travel resulting from increases in projected growth and development are then put on the transportation system. Problems are then identified when the transportation system cannot handle the increases in vehicular traffic, transit ridership, etc. It follows that the fundamental starting point for developing a Miami Downtown Transportation Master Plan is to estimate future year growth and development. In standard practice, a single scenario is proposed based on best estimates and present day assumptions for the most likely outcome of future growth. The Downtown Task Force, however, wished to examine a range of growth scenarios in which the City of Miami and its leaders were working towards implementing. Therefore, in addition to a "conservative," de facto development projection, there is two other future development scenarios carefully varied for the Downtown Miami area. These future development scenarios—the 2020 Baseline, the 2020 Enhanced, and the 2020 Visionary—have respectively denser levels of development, and therefore increasing levels of travel demand. As noted above, denser development further burdens the transportation system and requires increasing levels and different types of improvements. 4.1 Methodology Before developing the land use information for future year scenarios, the Land Use Committee and planning professionals from the City of Miami did a detailed inventory of existing and recently approved projects in the downtown area as well as extensive analysis of trends and potential for new development in specific sub -areas within the study area. The general approach and specific methodology for developing the three land use scenarios for the MDTMP is described below. Existing Miami -Dade County and downtown development patterns and recent trends were the base for the future land use forecasts, with the heaviest emphases placed on local study area trends and potentials. This information was further combined with city regulations, policies, and recent studies dealing with desirable future land uses in each sub -sector of the Downtown Miami study area. The documents considered included: • Miami Comprehensive Neighborhood Plan • Miami Downtown Master Plan Development Scenarios Page 4 -1 1239U Miami Downtown Transportation Master. a • FEC Corridor Plan • Watson Island developments • Media and Entertainment Districts overlays • Other Special Districts zoning overlays • Miami River Infill Plan • Miami River Greenway Plan • Revitalization impacts of the Miami Design District and the Fashion District on the Edgewater and Wynwood neighborhoods • Empowerment Zone • Community Redevelopment areas for Overtown and the Omni. The initial land use projection for the Baseline Scenario was based on projected future year values extracted from transportation model used in developing the Miami -Dade Long Range Transportation Plan and interpolating between them to obtain year 2020 values. Comparing estimated development levels to existing and recent development approvals throughout the area, however, validated this projection. Significant adjustments were made in particular in the Brickell area due to the recent surge in growth in that sector of Employment Growth (1999-2020) Downtown Miami. Ir W"I Once the baseline future year projections were established, the Land Use Committee examined additional development potential at the parcel level for each of the three subareas. This detailed review, guided by the documents and trends mentioned above, led to the land use forecasts for the Enhanced and the Visionary development scenarios. 50,000 40,000 ti 30,000 20,000 10,000 n 2020 2020 2020 Baseline Enhanced Visionary Forecasted employment growth for the three scenarios For forecasting the 2020 Enhanced and 2020 Visionary growth projects for housing, the Land Use Committee first compared the City's property database for existing housing units to the housing stock in the 2020 Baseline scenario for a particular traffic analysis zone (TAZ). If, for example, the projected increase in housing stock was 30% for the 2020 Baseline scenario for that TAZ, the Land Use Committee examined the potential for additional development and revitalization opportunities. If additional housing stock could be forecasted, then the Land Use Committee would double the projection (an additional 30% in this example) in housing stock for the 2020 Visionary scenario for that TAZ. Finally, the 2020 Enhanced scenario would "split the difference" in forecasted housing stock between the 2020 Baseline projection and the 2020 Visionary projection. A similar iterative Development Scenarios Page 4 - 2 12390 Miami Downtown Transportation Master. i process was used for developing the employment growth projections for the 2020 Enhanced and 2020 Visionary scenarios. Finalization and fine-tuning of the forecasts included reasonableness checks, applied to the distribution of type and size of dwelling units, socio-economic characteristics of residents, employment forecasts, and school enrollment figures. Additionally, the future forecasts were checked against the level of development approved as part of the Downtown Miami DRI. 4.2 Summary of Scenarios 40,000 35,000 30,000 25,000 20,000 g` 15,000 G 10,000 5,000 0 Housing Growth (1999-2020) 2020 2020 2020 Baseline Enhanced Visionary ftw eCL• &.~M Forecasted housing growth for the three scenarios. The result of this analysis for each of the 2020 development scenarios (developed by the Land Use Committee and the City of Miami) is described in detail below: • 2020 Baseline, the most conservative of the development scenarios, is based on the officially adopted countywide population forecasts. Compared to 1999, this scenario increases employment by 18,000 employees and residential uses by 15,000 dwelling units in the core of the study area by 2020. A large portion of this growth has already requested and received development approvals and is located in the Brickell area. • 2020 Enhanced, a more aggressive growth forecast, is based on the development trends seen in the Downtown Miami area in the last five to 10 years. Compared to 1999, this scenario increases employment by 30,000 employees and residential uses by 23,000 dwelling units in the core of the study area by 2020. • 2020 Visionary, the most optimistic and aggressive development scenario, is based on the successful growth trends seen in the Downtown Miami area in the past three to five years. Compared to 1999, this scenario increases employment by 48,000 employees and residential uses by 34,000 dwelling units in the core of the study area by 2020. See Exhibit 4-1 for the 2020 forecasts for total employment and total housing. Development Scenarios Page 4 - 3 12390 Miami Downtown Transportation Mastet n Exhibit 4-1 2020 Forecast for Total Employment and Housing Development Scenarios Page 4 - 4 12390 Miami Downtown Transportation Master .t 5.0 TRANSPORTATION SYSTEM NEEDS he future travel demand, the actual volumes of travelers, their vehicles, and transit patrons to, from, and within the study area were established using the Miami Urban Area Transportation Study (MUATS) 2025 urban area transportation planning model. The model reflected the future land use scenarios and the roadway system improvements developed from suggestions generated during all phases of the public involvement program. Subsequently, forecasts from the urban area model were appropriately revised and input into the Paramics microsimulation model. The Paramics model, in turn, models street -by -street, intersection -by -intersection vehicular -based flows throughout smaller areas in far greater detail than urban area planning models are capable of. It include details such as traffic signal cycles, turns in and out of parking lots and garages, acceleration and braking characteristics of cars vs. truck or buses, and even incorporates user -based observations about ranges of typical driver behaviors in the study area. It thus presents an extraordinarily realistic picture of the transportation system for an area such as Downtown Miami. More importantly, Paramics and similar traffic models can not only evaluate major capital improvements like new expressway and roads, or new rail transit as planning models can, but they can far better evaluate them than planning models, and further, they can analyze a variety of improvements, scenarios, and procedures that planning models cannot even recognize. Paramics was then utilized to assess on the Downtown -appropriate street -by -street micro network and it's micro level of detail the various transportation improvements suggested. 5.1 Roadway Network Development The Miami Urban Area Transportation Study (MUATS) 2025 model, as adopted by the Miami - Dade Metropolitan Planning Organization (MPO) in December of 2001, was used as the base highway network for the 2020 Baseline Scenario. The transportation network was edited to reflect the expected configuration in the year 2020. Network changes were based on coordinated efforts with the Miami -Dade MPO and the City of Miami, first to remove the projects anticipated to be implemented in the 2020-2025 span, and then to reflect the transportation options that were suggested by the general public and the other study participants during the public involvement process for the project. Exhibit 5-1 summarizes all of the updates and the transportation improvement options for the 2020 Baseline Scenario highway network. Exhibits 5-2 and 5-3 show the additional network changes reflected in the 2020 Enhanced and the 2020 Visionary Scenarios models. Transportation System Needs A 9 Miami Downtown Transportation Master. a Exhibit 5-1 Baseline Scenario Transportation Network Adjustments Baseline Alternatives Description FSUTMS Coding Completed Implement ITS alternatives to help w/ bridge openings N/A Extend Miami Beach light rail (Ba link) into downtown `/ Port Blvd U-turn N/A Convert S. 8 Street to two-way from Brickell to Miami Ave `� Convert S. 8 Street to two-way from Miami Avenue to I-95 `, Implement Fla ler Shuttle `� Provide a I-95 NB on-ramp at N 8 Street to provide access to WB SR 836 Complete the Fla ler Street Corridor improvements Provide tunnel from Seaport to Watson Island `/ Realign I-395 and improve on/off ramps (FDOTplans) Biscayne Boulevard Improvements (FDOTplan) Two -Way Conversions a. E 2 Ave, Biscayne Blvd Way to NE 6 St ✓ b. Biscayne Blvd Way, SE 2 Ave to Biscayne Blvd ✓ c. S. 3 St, SE 2 Ave to Biscayne Blvd ✓ d. S 2 St, SE 2 Ave to Biscayne Blvd ✓ e. S. 1 St, W 2 Ave to Biscayne Blvd ✓ f. N 1 St, W 3 Ave to Biscayne Blvd ✓ g. N 2 St, W 1 Ave to Biscayne Blvd ✓ h. N 3 St, W 3 Ave to Biscayne Blvd ✓ i. E 3 Ave, Biscayne Blvd Way to NE 2 St ✓ '. Biscayne Blvd, SE 2 St to Biscayne Blvd Way ✓ k. S Miami Ave, Miami River to NE 6 St ✓ 1. E I Ave, S 3 St to NE 6 St ✓ m. E 2 Ave, N 6 St to NE 13 St ✓ n. Miami Ave, N 6 St to NE 14 St ✓ o. E 1 Ave, N 6 St to NE 17 St ✓ p. S 1 1 St, 1-95 to S 1 Ave $e q. S 1 1 St, S I Ave to Brickell Place >k r. S 10 St, I-95 to SW I Ave oIe s. S 3 Ave, SW7 SttoSW6St �e t. SW 1 Ave (west of Metrorail), SW I l St to Miami River �Ie u. SW 1 Ave (east of Metrorail), SW 13 St to SW 7 St ✓ v. Miami Ave SW 12 St to Miami River w. N 9 St, NE 2 Ave to Biscayne Blvd �e x. N 10 St, NW 3 Ave to Biscayne Blvd ✓ y. N 1 1 St, NW 3 Ave to Biscayne Blvd ✓ z. N 13 St, Miami Ave to NE 2 Ave ✓ aa. N 17 St, Miami Ave to NE 2 Ave ✓ ab. S 9 St, Miami Ave to SW 1 Ave ✓ ac. Miami Ave, N 6 St to NE 17 St ✓ ad. NE Miami Ct, NE 14 St to NE 18 St V * - Roadway not included in the 2025 FSUTMS model Transportation System Needs Page 5 - 2 � C,�2.e� 90 Miami Downtown Transportation Master. r Exhibit 5-2 Enhanced Scenario Transportation Network Adjustments Enhanced Alternatives Description FSUTMS Coding Completed Convert S. 7 Street to two-way from Brickell to I-95 Extend SE I Avenue from S. 8 Street to S. 5 Street V Water Taxi from Brickell Key to Metromover Station @Hatt N/A Implement Traffic calming alternatives through Brickell residential areas V/ Connect other neighborhoods with Transit N/A Create a Shuttle System for the Brickell residential area (from 13 Road to 26 Road) Connect Brickell Shuttle to Fla ler Shuttle `/ W. 1 Avenue Corridor Extension `� Re -align Metromover and add new station at DuPont Plaza Provide a shuttles stem into W nwood (NW 2 Avenue/36 Street/Biscayne/Omni) Create a Transit Free Fare Zone `� ,Biscayne Boulevard Improvements (City of Miami) `/ Exhibit 5-3 Visionary Scenario Transportation Network Adjustments Visionary Alternatives Description FSUTMS Coding Completed Create Loop of Metromover through the Brickell Financial District Extend the Metromover to 26 Road New tunnel under the Miami River @ W 1 Avenue Extend Metrorail to AA Arena and Seaport (based on East/West alignment) Remove Distributor Ramps and provide a "Grand Boulevard" on S. 3 Street Depress I-395 from west of R/R to provide "Grand Boulevard" Extend Metromover into Wynwood (N 2 Avenue/29 Street/Biscayne/Omni) Provide a new interchange at 1-95 and N 29 Street I-95/NW 14 St Interchange Depress I-95 Provide Commuter Rail to Broward Count Transportation System Needs Page 5 - 3 12390 Munni Downtown Transportation Master. 5.2 Travel Forecast After the 2020 Baseline network was updated and the socio-economic (ZDATAIA and ZDATA2) datasets were adjusted, the FSUTMS software package was used to forecast future conditions. The resulting Downtown Miami cordon entry -exit peak season weekday average daily traffic (PSWADT) volumes were compared to the 1999 MUATS model volumes taken at the corresponding locations. Fifty-seven (57) entry/exit points were examined within the downtown Miami project study area. Of the entry/exit points analyzed, most showed growth in traffic volumes. Exhibit 5-4 lists the study area entry/exit PSWADT. This process was repeated for the 2020 Enhanced and 2020 Visionary Scenarios. The corresponding PSWADT results are shown in Exhibits 5-5 and 5-6. In each case, as expected, significant increases in travel demands were forecast with each subsequently increased land use scenario. These comparisons were used to verify that travel growth was distributed throughout the entire network and also to ascertain the order of magnitude in travel demand growth under each development scenario when compared to known (existing) traffic conditions. 5.3 Traffic Loadings Exhibit 5-7 portrays the major roadways in the study area and their traffic loading relative to their capacity. The color -coding differentiates roadway segments with daily traffic loadings (from the FSUTMS model) well within the segment capacity (volume to capacity or v/c ratio less than 0.8), segments near capacity (v/c ratio between 0.8 and 1.2, where capacity is a v/c ratio of 1.0 — equal numbers of vehicles using a facility as that facility can accommodate), and overloaded segments (those exhibiting a forecast v/c greater than 1.2). An estimated 25 percent of the segments fall in the overloaded category under the 2020 Baseline Scenario traffic demand conditions. The percent of overloaded segments was 50% for the 2020 Enhanced Scenario (Exhibit 5-8) and 80% for the 2020 Visionary Scenario (Exhibit 5-9). The FSUTMS network for the 2020 Baseline Scenario reflects the main capacity improvements and operational changes that are part of the subject Scenario. The traffic volumes obtained from the FSUTMS model, however, indicate only gross, overall travel demand to, from, and within the study area, on only the area's main roadways beyond the core of the CBD. Travel volume estimates were converted to trip matrices of hourly volumes for input into the PARAMICS simulation model. Detailed operational analysis, as outlined above, of the transportation network was then performed using PARAMICS for each critical time period (AM peak, Midday, and PM peak). The Paramics model quickly indicated that even the most conservative growth scenario, the 2020 Baseline, would require virtually impossible improvements to the highway system, or a Transportation System Needs Page 5 - 4 12390 Miami Downtown Transportation Master i Exhibit 54 Comparison of Entry/Exit Volumes (PSWADT) FSUTMS Runs Entry Station 1999 Baseline Brickell Ave (South) 25,152 33,405 Miami Ave (South) 14,059 16,288 1 Ave - - _SW SW 2 Ave - - SW 2 Ct - - SW 3 Ave 32,693 30,488 SW 15 Rd - - I-95 off ram /8 Street 952 3,474 I-95 on ram /8 Street 11,849 11,311 SW 8 St 25,707 30,778 SW 7 St 13,768 11,116 SW6St - - SW5St - - SW 3 St 6,442 9,145 SW 2 St 3,446 1,953 SW 1 St 15,019 18,175 Fla ler St 17,822 16,296 NW I St 12,443 18,165 NW 3 Ave (NB) 5,897 5,204 I-95 off ramp 8,508 10,907 NW 2 St 6,787 9,755 NW 3 St 11,258 13,031 NW 5 St 10,008 9,595 NW 6 St 10,118 10,714 NW 7 St 7,509 6,981 NW 8 St 11,888 13,967 1-95 on ramp 19,246 12,878 NW 9 St - - NW 10 St 3,494 9,285 NW 11 St 1,753 9,632 Notes: PSWADT = Peak Season Weekday Average Daily Traffic Transportation System Needs Entry Station 1999 Baseline NW 11 Terr - - NW 12 St - - NW 14 St 5,992 2,812 NW 17 St 2,400 1,625 NW 20 St 19,615 24,047 NW5Pl - - NW 4 Ct - - NW 3 Ave - - NW 2 Ave 28,077 35,895 NWIP1 - I - NW 1 Ct - - NW 1 Ave - - NW Miami Ct - - N Miami Ave 11,643 20,650 NE 2 Ave 29,991 36,800 Biscayne Blvd (north) 29,279 37,065 NE 19 Ten - - NE 15 St/ Venetian Way 5,009 8,151 I-395 WB off ramp 11,022 5,495 I-395 EB on ramp 10,660 2,353 I-395 WB on ramp 23,928 32,689 I-395 EB off ramp 25,081 33,454 CBD WB on - Miami Ave 15,856 17,659 CBD EB off - Miami Ave 4,630 12,808 CBD EB off - NE 1 Ave 5,046 2,405 CBD WB on - SE 2 Ave 8,010 8,234 CBD EB off - SE 2 Ave 16,637 19,222 Totals Percent Increase 528,694 613,907 16% Page 5 - 5 12390 Miami Downtown Transportation Master, . Exhibit 5-5 Comparison of Entry/Exit Volumes (PSWADT) FSUTMS Runs Entry Station 1999 Enhanced Brickell Ave (South) 25,152 33,132 Miami Ave (South) 14,059 16,068 SW 1 Ave - - SW 2 Ave - - SW2Ct - - SW 3 Ave 32,693 32,292 SW 15 Rd - - I-95 off ram /8th Street 952 2,629 I-95 on ram /8th Street 11,849 10,884 SW 8 St 25,707 27,341 SW 7 St 13,768 20,124 SW 6 St - - SW5St - - SW 3 St 6,442 9,208 SW 2 St 3,446 3,355 SW l St 15,019 15,614 Fla ler St 17,822 17,777 NW l St 12,443 23,480 NW 3 Ave (NB) 5,897 8,591 I-95 off ramp 8,508 9,383 NW 2 St 6,787 11,373 NW 3 St 11,258 12,608 NW 5 St 10,008 10,687 NW 6 St 10,118 12,231 NW 7 St 7,509 6,663 NW 8 St 11,888 16,686 I-95 on ramp 19,246 14,268 NW9St - - NW 10 St 3,494 9,108 NW 11 St 1,753 10,114 Entry Station 1999 Enhanced NW 11 Terr - - NW 12 St - - NW 14 St 5,992 10,572 NW 17 St 2,400 2,052 NW 20 St 19,615 25,796 NW5Pl - - NW 4 Ct - - NW 3 Ave - - NW 2 Ave 28,077 41,772 NW1P1 - - NW1Ct - - NW 1 Ave - - NW Miami Ct - - N Miami Ave 11,643 18,151 NE 2 Ave 29,991 39,307 Biscayne Blvd (north) 29,279 37,657 NE 19 Terr - - NE 15 St/ Venetian Way 5,009 8,673 I-395 WB off ramp 11,022 5,723 I-395 EB on ramp 10,660 2,809 I-395 WB on ramp 23,928 1 34,945 I-395 EB off ramp 25,081 32,421 CBD WB on - Miami Ave 15,856 17,266 CBD EB off - Miami Ave 4,630 13,032 CBD EB off - NE 1 Ave 5,046 1,742 CBD WB on - SE 2 Ave 8,010 8,441 CBD EB off - SE 2 Ave 16,637 18,631 Totals Percent Increase 528,694 652,606 23% Notes: PSWADT = Peak Season Weekday Average Daily Traffic Transportation System Needs Page 5 - % 12390 Miami Downtown Transportation Master . i Exhibit 5-6 Comparison of Entry/Exit Volumes (PSWADT) FSUTMS Runs Entry Station 1999 Visionary Brickell Ave (South) 25,152 33,615 Miami Ave (South) 14,059 17,295 SW 1 Ave - - SW 2 Ave - - _SW 2Ct - - SW 3 Ave 32,693 39,271 SW 15 Rd - - I-95 off ram /8 Street 952 13,366 I-95 on ram /8 Street 11,849 32,885 SW 8 St 25,707 23,212 SW 7 St 13,768 17,141 SW 6 St - - SW 5 St - - SW 3 St 6,442 21,958 SW 2 St 3,446 19,722 SW 1 St 15,019 18,614 Fla ler St 17,822 32,362 NW 1 St 12,443 23,270 NW 3 Ave (NB) 5,897 20,954 I-95 off ramp 8,508 7,767 NW 2 St 6,787 13,890 NW 3 St 11,258 11,761 NW 5 St 10,008 14,775 NW 6 St 10,118 9,681 NW 7 St 7,509 12,752 NW 8 St 11,888 16,337 I-95 on ramp 19,246 16,674 NW 9 St - - NW 10 St 3,494 12,536 NW 11 St 1,753 1 13,396 Notes: PSWADT = Peak Season Weekday Average Daily Traffic Entry Station 1999 Visionary NW 11 Terr - _ NW 12 St - - NW 14 St 5,992 12,099 NW 17 St 2,400 1,100 NW 20 St 19,615 22,406 NW5P1 - - NW 4 Ct NW 3 Ave - - NW 2 Ave 28,077 55,539 NWIPI - _ NWICt - - NW 1 Ave - - NW Miami Ct - - N Miami Ave 11,643 25,831 NE 2 Ave 29,991 46,859 Biscayne Blvd (north) 29,279 46,525 NE 19 Terr - - NE 15 St/ Venetian Way 5,009 10,487 1-395 WB off ramp 11,022 66,426 I-395 EB on ramp 10,660 163 I-395 WB on ramp 23,928 48,367 I-395 EB off ramp 25,081 - CBD WB on - Miami Ave 15,856 - CBD EB off - Miami Ave 4,630 - CBD EB off - NE l Ave 5,046 - CBD WB on - SE 2 Ave 8,010 - CBD EB off - SE 2 Ave 16,637 - Totals Percent Increase 528,694 779,036 47% Transportation System Needs Page 5 - 7 -1_2390 Miami Downtown Transportation Master. i Exhibit 5-7 Year 2020 MUATS Model • Baseline Scenario Network by Volume to Capacity Rath (V/C) VC<.8 VC -..s-1.2 VC>1.2 Transportation System Needs Page S - 8 12390 Miami Downtown Transportation Master, Exhibit 5-8 Transportation System Needs Page S - 9 2390 Miami Downtown Transportation Master, Exhibit 5-9 Year 2020 MUATS Model - Visionary Scenario Network by Volume to Capacity Ratios (V/C) VC<.8 VC=.8-1.2 VC>1.2 W111 Transportation System Needs Page 5 - 10 12199 Miami Downtown Transportation Master. t combination of selective highway improvements coupled with a significant shift to transit as a means of accessing and traveling within Downtown Miami. Considering the findings, it is fortunate that a grade -separated, fixed guideway system is already in place for Downtown Miami. Metrorail, Miami -Dade County's underutilized mass transit system, runs right through this area. Further, Metrorail's supporting people -mover system, Metromover, can assist with intracity travel far more than it does now. 5.4 The Roadways versus a Pedestrian -Friendly Environment Improvements to the roadway system in the study area are challenging. Widening roads in downtown areas is virtually impossible. It can be very disruptive to businesses, very expensive due to limited rights-of-way, and generally unfeasible because buildings abut the existing rights-of-way. Further, both widening streets and improving vehicular mobility and speeds conflict with creating a pedestrian -friendly environment for Downtown Miami. Residents, transit riders, and workers in Downtown Miami need a safe, pedestrian - oriented environment to travel the relatively short distances between downtown destinations. The public constantly voiced this need throughout the public involvement process. And it is precisely the safe, pedestrian - oriented environment which promotes more A safe, pedestrian -oriented environment will attract more residents and shoppers to Downtown Miami. residents to choose to live in an urban center, and it's what attracts others there for shopping and entertainment. And increased residential components, and diversified shopping and entertainment offerings are what helps keep present residents satisfied, interests new residents, and brings in outsiders to create the living city of round-the-clock activities, the 24-hour city that transcends the office -dominated 8 -to -5 and then shut down activity cycle most of the Downtown now experiences. And it is the reinvigoration of Downtown Miami that will help generate significant new revenues to support improving services and making Miami a great city. Transportation System Needs Page 5 - 11 12390 Miami Downtown Transportation Muster. i 5.5 Multimodal Improvements Consequently, the main focus on future transportation system improvements shifted from the roadway network to improvements in transit, the pedestrian environment, and other modes of transportation. Ways to better manage travel demand like telecommuting, staggered work hours, and more residents in Downtown Miami were also discussed. Critically needed are extensive improvements to the transit system to absorb a large portion of the increased 2020 travel demand. Transit improvements include shorter headways and more capacity for Metrorail and Metromover, more shuttle systems like the Brickell shuttle, Metromover lines extended into other areas, and free - fare zones for the downtown area to increase transit ridership. In 2020, transit will need to carry 25% to 50% of the trips in Downtown Miami. Increasing the capacity and the attractiveness of the transit system will require major improvements. The transit mode split goal (based on the percent of trips that travel to, from and within the study area) is 25% for the 2020 Baseline Scenario, 30% for the 2020 Enhanced Scenario, and 50% for the 2020 Visionary Scenario. Realizing these transit mode splits will result in adequate capacities and flows on the roadway system, as well as reduced surface street conflicts, supporting a more pedestrian -friendly environment in Downtown Miami. Future Downtown Miami transportation needs also encompass enhancements to other modes of transportation including bicycles and water -borne transportation. The MDTMP has not eliminated roadway improvements from its multimodal approaches to managing congestion, enhancing accessibility, and improving mobility. It also addresses vehicular needs like the traffic congestion caused by the Brickell Bridge openings, the confusion of the one- way street system, and the need to create more appropriate vehicle entryways than the current I-95 Distributor Ramps. Transportation System Needs Page S - 12 19.1fi Miami Downtown Transportation Master. E The MDTMP promotes a forward-looking, more sustainable, more people -friendly and traveler - responsive transportation system. It recommends meeting needs across a broad spectrum of multimodal project and management offerings. And it seeks to meet the transportation needs with the input from its users, residents, workers, and the business and community leaders of Downtown Miami. Transportation System Needs Page 5 - 13 4 6I6)Iftf� Miami Downtown Transportation Master . i 6.0 DEVELOPMENT AND EVALUATION OF TRANSPORTATION SYSTEM IMPROVEMENTS 6.1 Three -Tiered Process The specific transportation system improvements to be evaluated consisted of three tiers. Tier 1 included improvements based on suggestions made or problems identified by the public. For example, a public comment that "the streets are confusing and I always get lost" supported converting one-way streets to two-way streets. Tier 2 incorporated improvements proposed in previous studies for Downtown Miami such as the removal of the I-95 Distributor Ramps and the creation of a grand boulevard entrance for the downtown area. Tier 3 included a series of improvements determined by the Technical Advisory Committee including projects like ITS to warn motorists of Brickell Bridge openings and reviewing those included in the FDOT's Work Program, the MPO's TIP, and the MPO's Long Range Transportation Plan. In all, more than 40 improvement strategies, covering many modes of transportation and numerous specific projects, were developed for each subarea of Downtown Miami. Every effort was made to explore improvement options in each of the major transportation mode categories: roadway, transit, pedestrian, and bicycle/other modes. 6.2 Improvements Evaluation Each transportation system improvement was evaluated against the study goals and objectives and its expected benefits. The Evaluation Criteria Committee (ECC) determined weighted scores for each transportation system improvement based on six goals. The following is the list of the goals and its objectives. 1. Improve transportation benefits of systems and projects a. Improves downtown mobility b. Decreases downtown traffic congestion c. Completes Downtown transportation networks (road, transit, pedestrian, bicycle) d. Implements multimodal solutions e. Improves travel safety and security f. Increases transportation effectiveness and efficiency g. Improves systems management and operations h. Emphasizes maintenance and upkeep i. Employs technology in lieu of construction Development and Evaluation of Transportation System Improvements Page 6-1 12390 Miami Downtown Transportation Master. 2. Increase social benefits of Downtown transportation investments a. Supports environmental justice/equitable assignment of positive and negative impacts b. Preserves community cohesion/stabilizes or improves urban neighborhoods c. Addresses elderly and handicapped concerns d. Integrates community oriented aesthetics in planning e. Increases residents' and employees' access to major activity centers f. Incorporates sustainability of transportation facilities 3. Enhance and strengthen Downtown economic activities a. Increases multimodal accessibility of employment centers b. Increases freight access to port c. Increases freight accessibility to businesses d. Facilitates tourism and tourists movement(s) e. Increases multimodal access to retail and shopping areas f. Increases access to recreational sites g. Increases Downtown employment 4. Preserve the environment and promote energy conservation a. Improves air quality b. Improves water quality c. Does not disturb sensitive land uses d. Reduces consumption of fossil fuels e. Promotes non -motorized travel 5. Reinforce sound Downtown growth and development principles a. Supports and augments the City's Comprehensive Development Master Plan b. Promotes infill for vacant land c. Encourages adaptive reuse of existing infrastructure where appropriate 6. Employ sound improvement investment strategies a. Minimize capital costs b. Minimize operation and maintenance costs c. Implement externally funded projects where feasible The ECC assessed the six categories of goals/benefits and assigned numerical weights to each: • Transportation Benefits (31 %) • Social Benefits (20%) • Economic Activity (14%) • Environmental Benefits (14%) • Growth and Development Benefits (11%) • Transportation Investment (10%) Development and Evaluation of Tronsportation System Improvements Page 6-2 12390 Miami Downtown Transportation Master The transportation improvements were input along with the travel demand from various future development scenarios (2020 Baseline, 2020 Enhanced, and 2020 Visionary) into the Paramics model to test their level(s) of effectiveness. The Technical Evaluation Committee (TEC) considered the results from the traffic simulation and the goals and objectives of the study. The TEC assigned a performance score to each transportation improvement option/alternative. The low range of the score was -10 points for options that are counterproductive relative to a specific study objective. The maximum score was +10 points for the maximum positive impact relative evaluation criteria. Zero points represented no impact. The weighting of the evaluation criteria is very important because it takes into account community preferences, as reflected in the following example. Consider two options: Improvement A and Improvement B. The sum of the scores for the six evaluation criteria is identical for both Improvements (see below). In this example, Improvement A scored higher than Improvement B under Transportation Benefits. Without weights, each evaluation criteria (goal/benefit) would be equally important and both improvements would get the same performance ranking. Improvement A Economic Improvement B -0.3 Goal/Benefit Score Goal/Benefit Score Transportation +8 Transportation +1 Social +4 Social +2 Economic +2 Economic +6 Environmental -2 Environmental -2 Growth/Development +6 Growth/Development +6 Trans. Invest. 0 Trans. Invest. +5 TOTAL +18 TOTAL +18 However, with the weights used in this study, Improvement A is clearly superior to Improvement B because the community decided that Transportation Benefits were the most important benefits of any improvement option (see below). Improvement A Goal/Beneiit Weiehted Score Transportation +2.5 Social +0.8 Economic Environmental Growth/Develop. Trans. Invest. TOTAL Improvement B Goal/Benefit Weighted Score Transportation +0.3 Social +0.4 +0.3 Economic +0.8 -0.3 Environmental -0.3 +0.7 Growth/Develop. +0.7 0 Trans. Invest. +0.5 +4.0 TOTAL +2.4 Development and Evaluation of Transportation System Improvements paf e -L- Miami Downtown Transportation Master . The evaluation of transportation improvement alternatives was based on a weighted scoring method described above. The weighted scores were then used by the Technical Committee to recommend the improvements and the priorities to be included in the MDTMP (see Appendix E for un -weighted and weighted scores of each transportation improvement considered in the MDTMP). This method is similar to the method used in the Long Range Transportation Plan. Involvement of the Evaluation Criteria Committee ensured that each study objective was considered explicitly and that the appropriate degree of importance was reflected in the final evaluation of improvement options. Development and Evaluation of Transportation System Improvements Page 64 12390 Miami Downtown Transportation Master. 7.0 RECOMMENDATIONS he Miami Downtown Transportation Master Plan (MDTMP) is intended to be a guide for implementing improvements to Downtown Miami's transportation system that will develop an economically stronger, more sustainable, and much more livable city. As a guide, the MDTMP offers conceptual approaches and broad strategies, but it also provides recommendations for specific projects where appropriate. This section addresses the approaches and lists the specific projects considered and evaluated during the course of Plan development. Evaluated according to the goals and objectives of the MDTMP, the downtown transportation system improvements were ranked as recommendations. Several recommendations were repeated throughout the entire study area, like improving transit service (frequency, reliability, and state-of- the-art, user -information systems), developing a network of pedestrian -oriented corridors, and converting one-way streets to two-way. Other recommendations, like removing a portion of I-395, were more sub -area specific. The recommendations were further stratified by sub -area. Some specific improvements include: • Creating a Metromover loop in the Brickell Financial District • Implementing a water taxi between Brickell Key and the mainland • Constructing a tunnel under the Miami River at SW 1 Avenue • Extending Metromover to the Wynwood area • Extending the M -Path for bicycles through all of Downtown • Modifying North 14 Street from I-95 to Biscayne Boulevard • Completing Baywalk from Pace Park to Bayside. 7.1 Improvement Categories The recommendations in the plan are categorized into four mode -specific groups and are presented below. Pursuing the goals of creating a true, multimodal, transportation system—with an emphasis on the pedestrian environment and enhanced transit service—to support downtown residential growth and continuing economic vitality have resulted in the proposals listed. 7.1.1 Roadway Improvements Roadway improvements include physical changes to all types of roads in the study area; these include conventional approaches like road realignments, road widenings, intersection improvements, and the like. This group of improvements also includes operational changes such as conversion from one-way to two-way flow and technological improvements such as using Recommendations Page 7-1 _1239« Miami Downtown Transportation Master i Intelligent Transportation System (ITS) devices to increase operational efficiency and utilizing the existing roadway system better. 7.1.2 Transit Improvements Transit improvement recommendations include providing circulator services, extending Metromover, and implementing a free -fare transit zone in the downtown area. In some cases, it is recommended that new shuttle service and Metromover extensions be provided along the same corridors. These recommendations are not intended to be redundant or duplicative; instead, when both technologies are recommended, the shuttle service should be considered an interim improvement that can be phased out once the Metromover extension is operational. The effectiveness of any transit service depends on the quality of service, including many factors— chief among them, high frequency. Metromover extensions will increase service, reliability, and effectiveness because of the exclusive guideway that eliminates the delays when buses share the roadways with cars, especially in areas that are congested during much of the day. Metromover extensions will certainly reduce transit travel times throughout Downtown Miami. 7.1.3 Pedestrian Improvements A pleasant, safe environment for pedestrians will promote additional walking in Downtown Miami. Unfortunately, pedestrians compete with automobiles for space along a corridor when crossing streets, and conflicts are unavoidable. These conflicts can be mitigated and significantly reduced. 7.1.4 Travel Demand Management The number of vehicles in Downtown Miami is significantly related to the amount of parking available. Jurisdictional policies that encourage an overabundance of parking in Downtown Miami are counter-productive to promoting walking and increasing mass transit use. The City of Miami and Miami -Dade County should reconsider parking requirements and policies for Downtown Miami. Limiting the growth of the parking supply in the city will benefit pedestrians by (1) physically restricting the number of vehicles entering the downtown, and (2) encouraging the use of transit as a simpler and ultimately more effective way to reach the area. Additionally, TDM policies should be implemented by the city with the help of the Downtown Transportation Management Initiative (a transportation management association) and South Florida Commuter Services. TDMs are collections of strategies aimed at reducing usage and volumes of single -occupancy vehicles during peak travel hours. The strategies may be as varied as carpooling, staggered work hours, parking management, and telecommuting. These strategies, when supported by local jurisdictions and aggressively implemented by area businesses, can result in noticeable reductions in peak -hour travel demand with the corresponding benefit in the area's roadway system. Recommendations page 7_2 Miami Downtown Transportation Master. 7.1.5 Other Modes This category of improvements includes bicycles, personal transporters, and waterborne transportation. Both general and specific improvement recommendations were formulated for the plan and are discussed in more detail in this section. Another existing mode, taxicabs, will need further study. Taxicabs can effectively complement the existing and proposed modes of travel in Downtown Miami by facilitating short trips and serving as a mode of access to supplement other modes such as Metromover and Metrorail. The taxicab industry, however, is highly regulated and significant legal and administrative changes would likely be needed to make this mode more responsive to travel needs in Downtown Miami. 7.2 Specific Recommendations Individual improvement recommendations are presented below in more detail. The recommendations have been listed in order of priority as established by the study's Technical Committee. This priority system was established based on both a technical evaluation of benefits and the weights given to each evaluation criterion by the study's Evaluation Criteria Committee. 7.2.1 Implement a Free -Fare Transit Zone. The vision of a vibrant Downtown Miami can be realized only if pedestrians and automobiles can co- exist. Transit is a large component of the formula for achieving this goal. One of the most effective ways to encourage transit ridership (other than excellent service) is providing the service free of charge. An area like Downtown Miami is ideal for implementing this concept. The area already has a core transit distribution system (Metromover) that is being supplemented with local, high frequency circulators. A Free -fare zone will increase transit ridership. Free -Fare Transit Zones have been successfully implemented elsewhere. It is also well documented that the patronage of local high -frequency transit service is high when the service is provided free. Indeed, since Metromover became a free service in January 2003, Miami -Dade Transit has reported that ridership has increased over 40%. The zero out-of-pocket cost is certainly an incentive for users to ride such systems. However, there are also intangible benefits. For example, riders need not worry about having enough (or exact) change, and user convenience is, therefore, increased. Additionally, removal of the farebox Recommendations Page 7-3 12390 Miami Downtown Transportation Master i eliminates the delays from the extra step of paying a fare upon boarding the vehicle. A number of transit analysts also agree that a substantial portion of the cost of running these systems is eliminated when cash collection equipment costs and maintenance, as well as revenue control and administrative support costs, are avoided. Furthermore, fewer delays means both that the service frequency is more reliable and the run times are shorter, thereby reducing rolling stock costs, as fewer vehicles are needed to provide the same service frequency. Implementing a Free -Fare Transit Zone is recommended for the entire study area. The system should allow riders to use any, or transfer between any, of the local systems (shuttles and/or Metromover) for free. 7.2.2 Construct pedestrian connection from Bayside to AA Arena. Bayside Marketplace is one of the most active (and attractive) retail centers in Downtown Miami. The AmericanAirlines Arena, with its frequent sporting and entertainment events, is also another popular destination in the immediate area. These two attractions complement each other in that numerous arena patrons visit Bayside before and/or after games and concerts. Another popular destination that interacts with Bayside is the restaurant/club on the arena property. There is a definite synergy between these uses on opposite sides of Port Boulevard. There has long been mutual interest between managers of both properties to construct a pedestrian bridge over Port Boulevard. Discussions continue regarding siting, placement, and access for the facility, a pedestrian bridge linking Bayside and the AmericanAirlines Arena is expected to become a reality in the relatively near future. This pedestrian bridge is not included in the TIP or the LRTP, as it will be built with private funds. ...a pedestrian bridge linking Bayside and AA Arena is expected to become a reality in the near future." 7.2.3 Extend Baylink light rail down Biscayne to Rader. Downtown Miami and Miami Beach are major economic engines in South Florida. Yet, there are no enhanced transit options for trips between these two high-density activity centers. The general purpose of the Baylink project is to: • Connect Downtown Miami hotels and tourist attractions to the Miami Beach Convention Center and beaches • Tie Miami Beach to the rest of Miami -Dade County's transit system • Provide an enhanced transit connection from Miami Beach to the Miami International Airport Recommendations Page 7-4 12390 Miami Downtown Transportation Master. MacArthur Causeway was recently improved with more lanes and higher bridges generally increasing the capacity of this important connection between Downtown Miami and Miami Beach. A light rail system will further increase the capacity of this corridor to ensure adequate speeds for everyone traveling on the causeway. The proposed alignment brings the light rail system (Baylink) from South Beach on the Causeway, down Biscayne Boulevard and west to connect with the Government Center Station. The Typical light rail vehicle. most desirable alignment for this final leg would be on (or near) Hagler Street. Such an alignment would be most compatible with the short-range objectives of the proposed Hagler Street shuttle and is a high priority for the MDTMP. 7.2.4 Implement a two-way road system. In the 1950s and 1960s, one-way streets were implemented in many downtown areas across the country with the purpose of relieving traffic congestion. As traffic congestion was decreased with the one-way system, automobiles speeds increased in these areas with high pedestrian activity. Further, one-way streets are confusing to the unfamiliar driver because of the lack direct routes to destinations. Now, the trend for downtown areas is an environment that reduces automobile speeds and volumes to a more compatible level with the pedestrian. This can be achieved by converting from one-way streets to two-way streets. Convert the following streets from one-way to two-way operation: • SE 8 Street from Brickell Avenue to South Miami Avenue • SW 8 Street from South Miami Avenue to I-95 • South 7 Street from Brickell Avenue to 1-95 • Biscayne Boulevard Way from SE 2 Avenue to Biscayne Boulevard • SE 3 Street from SE 2 Avenue to Biscayne Boulevard • SE 2 Street from SE 2 Avenue to Biscayne Boulevard • South 1 Street from SW 2 Avenue to Biscayne Boulevard • Flagler Street from Biscayne Boulevard to West 3 Avenue • North 1 Street from NW 3 Avenue to Biscayne Boulevard • North 2 Street from NW 1 Avenue to Biscayne Boulevard Recommendations Page 7 12390 Miami Downtown Transportation Master I • North 3 Street from NW 3 Avenue to Biscayne Boulevard • Miami Avenue from Miami River to NE 14 Street • East 1 Avenue from South 3 Street to NE 15 Street • East 2 Avenue from Biscayne Boulevard Way to NE 13 Street • SE 3 Avenue from Biscayne Boulevard Way to Flagler Street • Biscayne Boulevard from SE 2 Street to Biscayne Boulevard Way In some cases, the change is intended to address specific problems in the area. For example, the TYPICAL STREET CONFIGURATION ONE-WAY TWO-WAY conversion of South 8 and 7 Streets will help with the congestion caused by the Brickell Bridge openings and will provide an alternate route to access I-95. The City of Miami and the FDOT have conducted feasibility studies of these changes and are already moving forward with the early stages of implementation. The conversion of Flagler Street to two-way traffic is another project in the early implementation stages. In fact, this project includes several components that will improve Typical one-way and two-way street configurations. transit and pedestrian services. Regarding other corridors, many downtown residents, workers, and visitors agree that the present circulation system, dominated by one-way streets, is confusing and not particularly user-friendly, something to avoid in a city frequented by visitors and tourists. The consensus is that such a system is also inefficient because it usually requires driving longer distances to travel to/from downtown destinations. Further, one-way streets generally have higher vehicular speeds, which endanger pedestrians. Creating a two-way traffic circulation system in the area will make Downtown Miami less confusing for motorists and safer for pedestrians. The higher capacity provided by one-way streets must thus be subordinated to other user considerations. Certain critical arteries such as NE/NW 5 and 6 Streets, providing access to major traffic generators like the Port of Miami, AmericanAirlines Arena, and Bayside, should remain one-way in order to preserve their high capacity and minimize disruption of access patterns. Recommendations Page 7-6 12390 Miami Downtown Transportation Masler. . Converting streets to two-way flow is relatively inexpensive. The principal changes involve modification of pavement markings, signs and repositioning and reprogramming traffic signals. In general, the number of lanes and the amount of on -street parking will not be affected. On narrow streets, however, loading zones must be carefully re-evaluated to ensure there is sufficient capacity thereby precluding double parking and blockage of through lanes. Alternatively, loading hours can be regulated to minimize conflicts between delivery vehicles and commuter traffic. In any case, enforcement will be needed. The specific changes required on each street must be established case-by-case. Re -striping the lanes and removal of one-way signs will suffice at many locations. However, there will be opportunities to introduce other desirable features to enhance the overall environment and aesthetics of the area. Examples of such enhancements are: • Landscaped medians • Wider sidewalks • Additional on -street parking • Pedestrian amenities 7.2.5 Improve transit amenities and attributes in the area. Amenities for transit patrons are a key element of an effective transit system. The elements contributing to a high quality environment are well documented, but for the most part include: • Comfortable shelters providing protection from the elements • Adequate lighting and safety at the shelters • Clean and safe vehicles Transit level of service (TLOS) attributes are, perhaps, even more important to a successful transit system than transit amenities. TLOS attributes include: • High frequency • Long operating hours • Reliable schedules • Reasonable walking distances • Available seats on the vehicles • Courteous drivers • Ease of use for riders • Economical fare Recommendations Page 7-7 123,90 Miami Downtown Transportation Master . A comprehensive and systematic program should be implemented to transform transit service in and out of Downtown Miami. Users outside the downtown must find transit a convenient means of reaching the area if a significant increase in transit ridership is to be achieved. Many of these improvements are relatively uncomplicated and inexpensive. Others represent a substantial capital investment in vehicles and support facilities. Training, quality control, and a commitment to user satisfaction must receive the attention they deserve from the transit operators. All this will take time to implement but must start immediately as a phased program of system -wide improvements. Longer -range solutions must also be continually explored as discussed below. To be an effective alternative to the automobile, transit travel must offer a reasonable schedule. From the users' standpoint, driving and/or walking to the initial transit point of access (and from the final transit stop to their ultimate destination), time spent waiting for transit, and transfer times (generally in a warm, humid, and frequently rainy environment) all add up and can drastically reduce Comfortable shelters that provide protection from the elements are essential. convenience. An excessive number of stops along the way, indirect routes, and multiple transfers further detract from users' convenience. Finally, transit vehicles in mixed traffic flow, captive to traffic congestion, are the final deterrent to using transit. This is why an extensive transit system is essential. Extending the system must enable more exclusive right-of-way systems such as Metrorail, Metromover, busways, and Tri -Rail. Semi -exclusive rights-of-way such as the South Dade Busway (buses must stop at signals), and light rail systems with signal pre-emption would represent a slight improvement over mixed -traffic flow and should be considered interim solutions that can later be converted to exclusive right-of-way systems. Every opportunity to secure transit rights-of-way should be explored. This includes roads, railroads, grade separations, waterways, utility corridors, public lands, partially filling water bodies, and grade separations (above and underground), etc. Finally, technological advances have revolutionized our daily lives. A lot of the same technology that is used for highways can be used for improving the efficiency of transit service. In fact, the term Intelligent Transportation Systems (ITS) also applies to other modes of travel besides Recommendations Page 7_8 12390 Miami Downtown Transportation Master roadways. The part of that technology that can be used for transit is known as Advanced Public Transportation Systems (APTS). This group of technologies has several components. However, vehicle location technology and extensive advanced communication systems are the substructure. The ultimate goal is to use those resources to monitor the system performance, make adjustments as needed, and, last but not least, share real-time information with the transit user. The technology would allow riders to check the schedule of their transit service from a computer at home or at work. The most convenient application would be to have that same information, via on-line (perhaps interactive) monitors, available at most (if not all) stops (called "Next Stop" technology). Such a system would both keep users informed minute -by -minute in real time as changes take place and provide them with information and choices to reach their ultimate destination. Cities like Chattanooga, TN and Ann Arbor, MI have already begun implementing this technology. Another convenient element of APTS is Smart Cards. When used extensively throughout the entire transportation system, Smart Cards provide the user with ultimate convenience when transferring from mode to mode without having to worry about exact change or mode -specific passes. Many of these and other APTS features are ready for application. As usual, though, a substantial investment in the infrastructure and operation is required. But it is indispensable to make transit service so convenient that it will be an effective means of traveling to and from Downtown Miami. 7.2.6 Connect other neighborhoods with transit. A vibrant Downtown Miami will depend greatly on the ability of residents, workers, and visitors to reach the area by an effective and convenient transit system. Short trips can use the proposed shuttles and Metromover system. Long trips can get riders to and from Downtown Miami on the regional commuter rail, Metrorail, and Metrobus (once these components are extended and improved). Intermediate or medium length trips, however, are as yet not properly served. More extensive, high frequency and good quality transit service is needed for these trips. Neighborhoods near downtown could be linked with small busesitrolleys that operate with high frequencies. Recommendations Page 7-9 12390 Miami Downtown Transportation Master t Neighborhoods near Downtown Miami must be linked with transit. The neighborhood system should include service to/from Downtown Miami and neighborhoods such as Model City, Little Haiti, Wynwood, Allapattah, Overtown, Little Havana, Flagami, The Roads, Coconut Grove, and connections between these neighborhoods as appropriate. These services would typically be provided with small buses that operate with high frequencies and provide reasonably good capacity. 7.2.7 Implement Intelligent Transportation System (ITS) technology alternatives to help with bridge openings. Bridge openings are disruptive to city center traffic flows. They interrupt sections of the network from handling traffic, they overburden the network by distributing delayed traffic after the bridge closes, and they interrupt cross street operations because of illegal queuing across intersections. The concept of this recommendation is to provide an integrated communication system that would warn motorists well in advance (both in distance and time) of the impending opening of each bridge. Effective communication between the vessels, the bridge tenders ITS cameras assist with real- and the system control center is essential. Integration with the time adjustments to the traffic Miami -Dade Traffic Control Center is also vital to ensure that signal system. signal timing adjustments are also incorporated into the alternative traffic flow patterns implemented during bridge openings. Additional monitoring via Closed Circuit TV cameras would further ensure that real-time adjustments can easily be made when needed. Three potential bridge -specific ITS traffic handling approaches are recommended, and include variable message signs advising when bridge will open and the expected period of impassable traffic, signs promoting—and possibly indicating—alternate routes, and adaptive "smart" signal retiming (and reintegration with system synchronization) after bridge opening. This recommendation affects most directly the Brickell area. It is intended to alleviate the mid-day traffic flow disruptions caused by opening drawbridges to allow large ships to navigate the Miami River. The Brickell Bridge is presently locked in the down position during the morning and the afternoon peak hours on weekdays. But when it is raised, disrupting vehicular traffic flows, motorists suffer frustrating delays trying to leave or reach Downtown Miami via Brickell Avenue. Additionally, the often long backups caused by the bridge cause indirect gridlock in the DuPont Plaza area, preventing access to/from the I-95 Distributor Ramps. A similar situation is found south of the Brickell Bridge for motorists using SE 7 and 8 Streets as well as those traveling to/from Brickell Key. Congestion caused by the Brickell Bridge openings was the most frequent complaint at the public meetings. Recommendations Page 7-10 19966 Miami Downtown Transportation Master t Such a system should be implemented within the study area (Brickell Avenue, South Miami Avenue, and SW 2 Avenue. Additionally, other bridges feeding the Downtown Miami area should be considered in future extensions of the system. 7.2.8 Develop an extensive network of pedestrian corridors Successful, vibrant areas of Downtown Miami—and most other cities across the US and around the world—are often easy to identify because of high levels of pedestrian activity. While walking to/from nearby destinations may be a necessity, it can be discouraged by the lack of adequate pedestrian facilities. A systematic effort must be mounted to not only "accommodate" but actively enhance pedestrian safety and promote a pleasant environment. As a direct benefit, the street system the street system will be relieved of vehicular trips that could otherwise be made on foot. A high level of the pedestrian activity will become an integral factor in the vitality of Downtown Miami. While some may disagree that pedestrian corridors can Pedestrian facilities are an important coexist adjacent to busy roads, the reality of Downtown component of the Downtown Miami Miami includes several inescapable facts: (1) there are busy transportation system. streets everywhere, (2) often the origin and destination of walk trips are along these busy roads, and (3) there are few alternatives to walking along busy streets because there are no public rights-of-way for exclusive pedestrian corridors. In other words, a balance is needed between servicing traffic and serving pedestrians on the street system of Downtown Miami. Recommendations page 7-11 12390 Existing conditions of highlighted area to left Key New Live Oak trees Existing trees New Royal Palms m median, in addition colorful shrubs and groundcovers Royal Palms by others • New street lamps with banners 0 Bench Et trash receptacle Landscape pots Concrete pavers to match Brickell Village paving Typicat cross section looking. North through the proposed Brickell Avenue median and sidewalks Miami Downtown Transportation Master I Pedestrian facilities must not be relegated to second-tier status in the transportation system in Downtown Miami. In some cases, traffic capacity may have to be compromised in order to achieve a better balance. After all, not every building has its own parking facility, so the connection between many parking lots or garages and the ultimate destination will often be by walking. Additionally, as noted above, transit must become a more common way to reach Downtown Miami destinations, and transit relies heavily on walking as the final segment of the trip (few buildings have their own transit stop within or in front of the building). The following list indicates streets recommended for improvement into pedestrian corridors with amenities designed to better accommodate walking: • Brickell Avenue from Miami River to 26 Road (Rickenbacker Cswy) • Brickell Bay Drive from South 8 Street to 15 Road • Miami Avenue from South 12 Street to North 36 Street • Miami Avenue/SE 1 Avenue from South 12 Street to 26 Road (Rickenbacker Causeway) • Biscayne Boulevard from Biscayne Blvd. Way to NE 36 Street • South 13 Street from I-95 to Brickell Avenue • South 10 Street from I-95 to Brickell Avenue • South 8 Street from I-95 to Brickell Key • South 15 Road from I-95 to Bayshore Drive • Flagler Street from I-95 to Bayfront Park • North 5 Street from Eastl Avenue to Biscayne Blvd. • North 3 Street from East 1 Avenue to East 2 Avenue • North 2 Street from West 2 Avenue to Biscayne Blvd. • North 4 Street from I-95 to Biscayne Blvd. • NW 5 Avenue from NW 21 Street to NW 36 Street • West 2 Avenue from SW 15 Road to NW 36 Street • East 2 Avenue from North 3 Street to North 5 Street • East 1 Avenue from North 3 Street to North 5 Street • North 9 Street from I-95 to Biscayne Blvd. • North 11 Street from I-95 to Biscayne Blvd. • North 14 Street from I -95/I-395 Interchange to Biscayne Blvd. • North 17 Street from 1-95 to NE 2 Avenue • North 20 Street from I-95 to Biscayne Blvd. • North 29 Street from I-95 to Biscayne Blvd. • North 36 Street from I-95 to Biscayne Blvd. Recommendations Page 7.13 12390 Miami Downtown Transportation Master i 7.2.9 Implement the recommendations from the Miami River Greenway Action Plan. A detailed, comprehensive study outlining the development of the SlC7 INl�u aJfi Miami River Greenway establishes aW � precisely how to create a pedestrian corridor along the banks of the river. study the Within the s y area proposed greenway extends along both sidesiA ?: of the river from I-95 to Biscayne Bay. In fact, portions of the: greenway have been created as new -- wiift Nrtm ti fMt etn. projects have been constructed along the river in recent years. The city of 51 hd Offaft seN�di Miami has enacted ordinances Proposed cross-section for the Miami River Greenway. requiring the reservation of 50 -feet along the banks of the river for the greenway. City staff has been diligently in enforcing this requirement, promoting the actual creation of the greenway as new projects are developed and/or redeveloped. Many gaps still exist, but they are quickly being completed due to the recent surge in development activity in Downtown Miami. 7.2.10 Connect Brickell Shuttle to Rader Shuttle. Seamless travel throughout the entire Downtown Miami area depends on transit use. But transit is an effective choice only when it is easy to use and takes travelers to their ultimate destinations. All shuttles through the area should be integrated without losing quality of service, especially frequency. Such connections will tie the eastern part of the Brickell area to the heart of Flagler Street in the most straightforward and efficient manner, providing bi-directional service on the same roads, with loops on both ends. 7.2.11 Reconfigure Metromover in the Dupont Plaza Area. Metromover has an awkwardly aligned segment in the heart of Downtown Miami, on SE 3 Street between SE 2 Avenue and Biscayne Boulevard. The elevated guideway is in a concrete island splitting the lanes of this one-way street. SE 3 Street is the continuation of the high volume I-95 Distributor Ramps, yet the lanes at this important junction do not align well due to the Metromover guideway. Moreover, many Downtown Miami workers and visitors consider this guideway alignment unsightly in an area that should be a beautiful gateway into the downtown core. Recommendations Page 7-14 12390 Miami Downtown Transportation Master . i This Metromover guideway is undergoing studies to determine the most appropriate alignment. The MDTMP study considers the proposed flow pattern change to one-way circulation in the DuPont Plaza area. Such circulation adjustments will also be integrated with the complete revamping and conversion of most Downtown Miami one-way streets to two-way. N W CONVENTION �., � CENTER i ?aeP.,t» �E-Toupv�a al.ic>anel_>ar .*.IS'IN ;• MET«..OIER AL;GNMENT ._...___--.. ._.-----------.._.._.._.._..—..—..—..—..—..—..--'--'-- mo ; WKI">FORM InusrTuiraw�] _. _ i i_.._. %TAT./IATFOIW 1 I I roc i "—.. ..................................................... f i I A I it IA! The proposed Metromover realignment and the two-way conversion of roadways in the DuPont Plaza area. Additionally, there are redevelopment plans for three of the four blocks comprising the DuPont Plaza area. It is anticipated that construction of a new Metromover station will be coordinated with the guideway realignment. A station was planned and approved at this location during the original alignment studies for Metromover. The station, however, was to be integrated into buildings that were never constructed. Redevelopment now seems imminent, and the proposed DuPont Plaza station will complete the system as originally proposed and greatly facilitate movement of workers and visitors to the proposed One Miami development (a mix of office, retail, hotel, and residential uses). Recommendations Page 7-15 12390 F1W f i I A I it IA! The proposed Metromover realignment and the two-way conversion of roadways in the DuPont Plaza area. Additionally, there are redevelopment plans for three of the four blocks comprising the DuPont Plaza area. It is anticipated that construction of a new Metromover station will be coordinated with the guideway realignment. A station was planned and approved at this location during the original alignment studies for Metromover. The station, however, was to be integrated into buildings that were never constructed. Redevelopment now seems imminent, and the proposed DuPont Plaza station will complete the system as originally proposed and greatly facilitate movement of workers and visitors to the proposed One Miami development (a mix of office, retail, hotel, and residential uses). Recommendations Page 7-15 12390 Miami Downtown Transportation Master, 7.2.12 Implement ITS for Special Events. Special event strategies and hardware suitable for the Downtown Miami area include: • Variable Message Signs (Roadways and Parking) • Closed Circuit Television (CCTV) • Highway Advisory Radio (HAR) • Downtown Miami Traffic Signal Control System The nature, number, and magnitude of the special events that it holds, as well as its special attractions often define the character of a city—not to mention the resulting positive economic impact. Special events can be fixed, seasonal, or occasional venues. Downtown Miami is fortunate to have many such events and venues. These include: AmericanAirlines Arena — home of the Miami Heat. Fixed Seasonal Venues • AmericanAirlines Arena (professional basketball and concerts) • Miami Arena (concerts and gatherings) • Performing Arts Center (symphony hall and opera house, under construction) • Bayside Marketplace (specialty "carnival" retail) • Gusman Theater (concerts and plays) • Lyric Theater (concerts and other performances) Special Events • Bayfront Park, Bayfront Amphitheater, Bicentennial Park and Miami -Dade Community College (MDCC) (concerts, performances, fairs and festivals) • Grand Prix (car race) • Corporate Run (foot race, walk) • Film -making Given the frequency, the severity, and the wide range of impacts from these events, a flexible method of redirecting traffic flows is essential. Intelligent Transportation Systems (ITS) is the ideal technology to effect these changes. The appropriate combination of devices, supported and supplemented by technical and enforcement personnel, can greatly simplify this labor-intensive, recurring task. The purpose of such as system would be to: Recommendations Page 7-16 12390 Miami Downtown Transportation Muster _ i • Simplify the implementation of special event traffic control plans though interactive devices programmed in advance with pre -established patterns that can be reused for recurring events • Facilitate the traffic flow to/from events while providing adequate access to other vital areas of Downtown Miami (e.g. Port of Miami, MDCC) • Allow immediate adjustment of traffic patterns based on real-time feedback from a variety of sources to maximize the flexibility and optimize flow under traffic conditions that can change quickly in both predictable or unpredictable ways • Maximize traffic and pedestrian flows as well as the utilization of fixed capacity resources such as roadways, ramps, transit vehicles, and parking facilities. Two freeways, I-95 and I-395, border Downtown Miami. An ITS - based traffic control system for special events can be considered an extension of the freeway monitoring system being deployed by FDOT in many of its major facilities. Full integration of such systems would be vital to maximize the benefit of the systems, optimizing traffic flow and ensuring a pleasant experience for road users destined to Downtown Miami, as well as those passing near it, during these special events. Bayfront Park holds several concerts, fairs and festivals throughout th Similar system components and ITS a year. programs have been successfully implemented in other cities like San Jose, CA. 7.2.13 Provide a pedestrian walkway along Biscayne Bay from Pace Park to Bayside. Pace Park overlooks Biscayne Bay at the north end of the Omni area. As public land, the park presents a unique opportunity to create a baywalk that can be connected to its counterpart to the south. The rationale for a baywalk here is the same as the reasons outlined for walkways in other areas to the south. When all are built, there will be continuous baywalk along Biscayne Bay from Pace Park to the Miami River, where the riverwalk would then continue west terminating near I-95. The baywalk will provide many recreational opportunities, increased connectivity between different sub -areas of the extended Downtown Miami area, and a viable alternative for walking trips. Recommendations page 7.17 12291) Miami Downtown Transportation Master _ 7.2.14 Implement Biscayne Boulevard Improvements from NE 6 Street to NE 14 Street. The proposed improvements to Biscayne Boulevard will complement the redevelopment of Bicentennial Park. This segment of Biscayne Boulevard connects the core of Downtown Miami with an important freeway, I-395. It is part of the route used by thousands of workers, residents and visitors to Downtown Miami each weekday. This particular section of Biscayne Boulevard, unlike the segment immediately south, does not have a raised median or much landscaping, and the sidewalks are barely adequate. This portion of Downtown Miami is changing rapidly after the completion of the AmericanAirlines Arena. The city is also pursuing major improvements to Bicentennial Park adjacent to the arena. The safe crossing of Biscayne Boulevard by pedestrians is crucial for the park to be successful when renovated. There is a great need to improve this roadway both from an operational and an aesthetic standpoint. The city of Miami has been working closely with FDOT to develop a set of improvements addressing the concerns above. Wider sidewalks, a wide median, safe pedestrian crossing, and landscaping are essential. The number of traffic lanes and provisions for on -street parking are being decided. With the final studies already underway, construction plans will follow. When complete, this segment of Biscayne Boulevard will become a compatible extension of the landmark entranceway into the core of Downtown Miami. 7.2.15 Build a new tunnel under the Miami River at SW 1 Avenue. This recommendation provides a tunnel under the Miami River from SW 7/8 Street to SW 3 Street. The tunnel will provide an alternate route to cross the Miami River. Natural barriers usually cause transportation challenges. The Miami River is no exception. Crossing a body of water requires bridges, which are more expensive than construction of at -grade roadways. Recommendations Pal 7�8 390 90 Miami Downtown Transportation Master . In the case of the Miami River, this cost factor is further compounded because the river is navigable and very active. In fact, numerous marine -oriented businesses are located along the river as far west as Douglas Road (over three miles inland). The constant flow of vessels requires certain vertical clearances even for the smaller boats. Large ships are accommodated by Large vessels are accommodated on the Miami River with drawbridges which adversely impact traffic. either drawbridges or high-level bridges, the latter of which allows vehicular traffic to remain unaffected by the passage of ships. Both types of bridges are expensive to build and maintain. Construction of high-level bridges is extremely expensive. Right -of way impacts can be devastating to a community in as much as these bridges require 65 -feet of vertical clearance over the river, and such requirement means a very long structure. Drawbridges, while less expensive and intrusive, carry significant operational costs, and impede large traffic flows. Brickell Bridge openings are notorious for causing traffic gridlock both in Downtown Miami and the Brickell area. The traffic tie-ups, in fact, could be worse in the peak hours. However, the bridge remains in the down position during the morning and the afternoon peak hours, when traffic volumes across the bridge are the highest. Further control of the bridge openings, however, is unfeasible. River traffic has right -of way entitlements because it preceded the roadways in the area. Furthermore, additional restriction of river traffic could adversely impact the operations of businesses located along the river. Preliminary feasibility studies have been conducted by a multi -agency task force. The consensus of the group, as well as the Evaluation Committee for this study, is a tunnel under the Miami River would be of great benefit to the area and should be pursued. The preliminary alignment would be in the vicinity of SW 1 Avenue. Recommendations Page 7-19 12390 Miami Downtown Transportation Master, The tunnel will increase vehicular capacity across the river (supplementing the Brickell Avenue, Miami Avenue, and SW 2 Avenue drawbridges as well as the I-95 fixed high-level bridge). More important, such a tunnel would be an effective alternate route across the river when ships are traversing the area. The tunnel will help alleviate gridlock caused by bridge openings and ensure continuous traffic flow to/from Downtown Miami and the Brickell area. River traffic would also benefit from uninterrupted flow or delays that another drawbridge would cause if one were built instead of the tunnel. 7.2.16 Improve pedestrian connections in Bicentennial Park. Access to the water for pedestrians is a unique characteristic of waterfront cities. When done well, pedestrian corridors serve as memorable meeting places for area residents, workers, and visitors. These corridors also provide an area for exercising or relaxing and breaking away from the daily routine. Last, but not least, a pedestrian corridor can make an excellent route for walk trips that can bypass roads and vehicular traffic altogether. Such connections can also provide an important linkage between areas that would otherwise seem completely disconnected. From a pedestrian standpoint, the Omni area north of I- 395 might as well be miles away from Downtown "When done well, pedestrian Miami. There are no viable pedestrian linkages between corridors serve as memorable the two. Plans for the improvement of Bicentennial Park meeting places for area residents, (based on the approved park master plan) include a workers, and visitors." baywalk that serves as the continuation of the Miami River Riverwalk and the baywalk along Bayfront Park and Bayside. Extending this baywalk north to the Omni area is critical in order to establish this much-needed pedestrian linkage. Such extension should be done in a manner compatible with the improvement within the park. Likewise, areas west of the park have never been properly connected to Bicentennial Park. The greatest obstacle is Biscayne Boulevard with its many lanes of high-speed traffic. Better ways to connect the park to areas west of the boulevard are also most necessary. The city has already begun the process of reconstructing Biscayne Boulevard in a way that facilitates pedestrian access to and from the park. The corresponding improvement of Biscayne Boulevard is reflected under the roadway section of these recommendations. 7.2.17 Improve NE 1 and 2 Avenues for truck traffic. This is an interim traffic operations improvement to enhance the efficient and safe movement of trucks through the Downtown Miami area. Heavy trucks traversing the Downtown Miami area are, in general, undesirable. However, the location of the Port of Miami entrance is in the downtown Recommendations Page 7-20 12390 Miami Downtown Transportation Master i core. The port lacks direct connections to the freeway system. Truck traffic on Downtown Miami surface streets is unavoidable until the proposed tunnel to the port is completed. This project is an interim step before an I-95 northbound on-ramp at NW 6 Street to provide access to westbound SR 836 is constructed and, eventually, the Port of Miami Tunnel is built. Once the I- 95 northbound on-ramp at NW 6 Street is constructed, truck traffic will be diverted away from the Performing Arts Center making it a much more pedestrian friendly environment. The project consists of turning radius and curb return improvements on NE 2 and 1 Avenues. These streets provide the most direct surface routes connecting the Port of Miami and I-395. The latter provides access to I-95 (north and south) and SR 836 (west). 7.2.18 Complete Downtown Miami DDA signage plan. Miami's Downtown Development Authority (DDA) planned, designed, and partially implemented a signage plan for the downtown area. The plan essentially divides Downtown Miami into several sectors and identifies each area with district graphic symbols (color "logos"). The plan will be particularly helpful to persons unfamiliar with the area, including visitors and tourists. The plan has several phases. Phase I (sector signs) has been completed. Phases II and III (expressway signs, directional signs, kiosks, and parking signs) have yet to be implemented. 7.2.19 Provide a truck -only tunnel from the Seaport to Watson Island. DDA Downtown Miami Sector Signs. The construction of such a tunnel will have many benefits including: • Facilitating truck access to/from the Port of Miami • Increasing the vehicular access capacity to/from the Port • Removing port -related truck traffic from Downtown Miami streets The tunnel will provide a direct connection to the freeway system. It would start at the MacArthur Causeway on Watson Island, near the end of I-395, proceed under Government Cut, and surface at Dodge Island. Recommendations a 7S 9 P Miami Downtown Transportation Master. i I- IMMERSED TUBE The proposed truck -only tunnel will provide easy access to 1-95 and SR 836. Use of the tunnel by truckers would provide easy and convenient access to I-95 and SR 836 (the Dolphin Expressway). This route will completely bypass the surface street system and preclude delays involved in traversing Downtown Miami. The tunnel will add more lanes of traffic capacity to/from the port. Additionally, both the main Port entrance and other surface streets will benefit from additional reserve capacity. The added reserve capacity, in fact, will be greater than the number of trucks diverted to the tunnel. The reason for such increase in capacity is that (1) trucks occupy more space than automobiles, and (2) the slow acceleration and deceleration of trucks represent a large capacity penalty when compared to autos. Other benefits of removing trucks from Downtown Miami are making the area streets friendlier with a more homogeneous traffic composition (fewer trucks), as well as reducing the noise and emissions generated by trucks. Consequently, the area will also be more pleasant for pedestrians and building occupants (workers, visitors, and residents). This project has undergone numerous studies to establish its impacts and design. Part of the LRTP but presently unfunded, it is the focus of recently renewed interest in finding alternate funding sources. Recommendations page 7.22 12390 Miami Downtown Transportation Master. i 7.2.20 Widen and extend West 1 Avenue. Biscayne Boulevard and Miami Avenue handle most of the north/south traffic destined for western areas of Downtown Miami. These two roadways are currently operating near capacity. West 1 Avenue provides circulation within the Downtown Miami street network and direct access for surrounding land uses but does not effectively move north -south traffic into or out of the Downtown Miami area. West 1 Avenue is under utilized because it does not offer the necessary connectivity to the north or south of the CBD, nor is the existing cross section compatible with an arterial designation. The proposed improvements to West 1 Avenue include widening it to a four -lane divided arterial from NW 10 Street to NW 14 Street, and extending the roadway south from SW 1 Street to the proposed tunnel under the Miami River. The alignment should be "straightened" between NW 10 Street and NW 14 Street, encouraging the use of the corridor. Also, extending the corridor south to the proposed tunnel requires that the I-95 Distributor ramps be removed and converted into a grand boulevard. Proposed West 1 Avenue improvement 7.2.21 Extend SE 1 Avenue from SE 8 Street to SE 5 Street. There are four city blocks in the Brickell area bounded by the Miami River and by the major arteries Brickell Avenue, SE 8 Street, and Miami Avenue. Two of these arteries are one-way streets. Circulation between and within these blocks is cumbersome. The proposed extension of SE 1 Avenue will improve the continuity of this street north of SE 8 Street, serving as an alternate route for several buildings to the south. The improvement will thus Recommendations Page 7-23 -1. �1c/0 Miami Downtown Transportation Master. t relieve the traffic loadings on Brickell Avenue and simplify circulation in the area for buildings both south and north of SE 8 Street. The improvement can be built largely within the Metromover rights-of-way, under the guideway, between SE 5 Street and SE 8 Street. Additional right of way, however, will be needed at the south end of the extension where it connects to SE 8 Street. Preliminary feasibility studies for this improvement have been conducted by DDA. 7.2.22 Improve bicycle facilities. Bicycle riders have the legal right to use the roadways for their travel, whether it is for commuting or recreation. Therefore, while bicycles may cause disruptions in traffic flow in some cases, it is, in general, wise to accommodate them within the transportation system. In doing so, bicycle travel becomes another choice that improves the mobility to, from, and within the Downtown Miami area. The M path is a bike path located mostly under the Metrorail guideway within the system's right-of- way, is one of few bicycle facilities outside of parks that is physically separated from traffic lanes. The facility was built when Metrorail was constructed using rights-of-way purchased from the Florida East Coast Railroad. It extends most of the length of the Metrorail's south line beginning at Recommendations Page 7-24 ,.2390 Improving bicycle facilities in the area can take many forms— providing bicycle = racks/lockers, encouraging businesses to provide showers and changing rooms, designating bicycle routes with the appropriate signing and markings, creating exclusive bicycle lanes, etc. Bicycling can be promoted The M path is bike path located mostly within the Metrorail right-of-way. through educational programs. A comprehensive bicycle improvement program should be developed and implemented. A few areas of Downtown Miami are especially good candidates for improved facilities such as bike lanes. • North 4 Street from I-95 to Biscayne Blvd • Flagler Street from I-95 to Biscayne Blvd • North 20 Street from 1-95 to Biscayne Blvd. • Biscayne Blvd. designated bike route from Pace Park to North 36 Street The M path is a bike path located mostly under the Metrorail guideway within the system's right-of- way, is one of few bicycle facilities outside of parks that is physically separated from traffic lanes. The facility was built when Metrorail was constructed using rights-of-way purchased from the Florida East Coast Railroad. It extends most of the length of the Metrorail's south line beginning at Recommendations Page 7-24 ,.2390 Miami Downtown Transportation Master, the Miami River. The path was later extended south from the Dadeland South Metrorail terminus station to Cutler Ridge as part of the South Dade Busway Project. Plans to extend the Busway to Florida City will further extend the M Path, making it the longest continuous bike path in south Florida. Such a facility has an obvious potential for bicycle commuting trips. The path can be extended along the proposed SE 1 Avenue extension to South 5 Street, then east to Brickell Avenue and south to 26 Road (Rickenbacker Causeway). Rickenbacker is a very popular route for bikers going to parks and other locations in Key Biscayne. That area has designated bike lanes that are heavily used by recreational bikers. In the Downtown Miami area, the M path should be extended as follows: continue on Brickell Avenue from South 5 Street to Biscayne Boulevard Way, go east on Biscayne Boulevard Way, then north on Biscayne Boulevard to Bicentennial Park. This extension will connect the facility to the heart of Downtown Miami. The extension of the M Path into the Omni area should be as follows: continue on Biscayne Boulevard from Bicentennial Park on proposed Baywalk to the Venetian Causeway (under I-395 and behind Herald Building), then north to Pace Park. 7.2.23 Extend Metrorail to AA Arena and Seaport. For Downtown Miami to achieve its potential, substantially higher use of mass transit is essential. Metrorail already serves Downtown Miami and has an outstanding distribution system— Metromover. However, without a line serving the East-West corridor, the western portions of Miami -Dade lack direct access to Metrorail. Metrorail East-West line This critical extension of Metrorail is the key to increasing mass transit use to/from Downtown Miami. Such a line will connect the western suburbs as well as other major generators such as the Miami International Airport and Florida International University. Additionally, there are many office complexes and hotels along this corridor. Businesses and residents of Downtown Miami will greatly benefit from connectivity to areas west of Downtown Miami. Recommendations Page 7-25 12390 Miami Downtown Transportation Master, r The alignment and elevation of this line has been debated extensively. In any case, the need is crucial for Downtown Miami, and regardless of the alignment, important connections should be established at: • Government Center Station (to properly connect the line to the rest of the system) • AmericanAirlines Arena (to provide high capacity service during events) • Port of Miami (to service thousands of employees and visitors entering the port every day, provide a more effective connection to Downtown Miami, and relieve the single entrance port bridge and roadway). 7.2.24 Remove 1-95 Distributor Ramps and provide a "Grand Boulevard" on South 3 Street. I-95 has a set of distributor ramps that provide a direct connection between the Interstate facility and the core of Downtown Miami. The elevated ramps are generally aligned between South 1 and 3 Streets and terminate at SE 2 Avenue in the area generally known as the DuPont Plaza. The "Grand Boulevard" project was conceived years ago, with the goals of: • Removing this man-made barrier and promoting more cohesive development of the area near the Miami River • Improving aesthetics • Providing a "grand boulevard" entranceway into the Downtown Miami core • Restoring the area to a more typical and pedestrian -oriented Downtown Miami environment. Reannmendations Page 7-26 16194(1 Miami Downtown Transportation Master. ,a Proposed cross section for the South 3 Street Grand Boulevard. While the project was found feasible in previous studies, it never advanced to the LRTP, nor secured funding. Updating the study should be closely coordinated with ongoing studies of circulation improvements and Metromover reconfiguration in the DuPont Plaza area that was discussed previously. These projects are not necessarily independent from one another or mutually exclusive. However, they should be approached together because of the combined benefits and the potential to reduce costs. 7.2.25 Provide a shuttle system into Wynwood. Wynwood is a mostly residential neighborhood north of the Omni/Overtown/Park West area as it extends to the area near North 36 Street. Here it begins to blend with the Design District, which is characterized by many businesses catering to homeowners and the interior decoration trade. Though located near Downtown Miami, these areas have been detached from downtown for a variety of reasons. Certainly, more interaction is desirable and possible. Facilitating transit access between Downtown Miami and Wynwood will encourage that type of interaction. Improved transit, in the form of shuttle service, will not only increase convenient accessibility, it will help residents avoid many of the inconveniences of traveling to Downtown Miami (parking, congestion, one -ways streets, etc.). The proposed shuttle service—including all of the requirements typically needed for success—could be aligned along NW 2 Avenue to 36 Street and back on Biscayne Boulevard to Omni/Overtown/Park West. Recommendations Page 7-27 12390 Miami Downtown Transportation Master, , i 7.2.26 Provide a Shuttle to Watson Island. Watson Island, immediately east of Downtown Miami and north of the Port of Miami, has changed in character and is developing into a unique destination complementing the downtown area and other tourist destinations. The long-established marina on the north side of the island will remain along with the well-known Parrot Jungle attraction (recently relocated to Watson Island from south Miami -Dade). Proposed uses for the south side, most of them already approved, include a Children's Museum, a Visitors' Center, and a mixed-use development that will include hotels, restaurants, and a Mega -Yacht Marina. The old Chalk's Charter Airline terminal will also remain on the island. In general, the demand for travel to/from Watson Island will increase substantially, and an effective transit connection will be needed soon. Construction of the proposed Baylink will eventually replace the shuttle. 7.2.27 Extend the Metromover through the Brickell Financial District. A Metromover loop through the Brickell Financial District will increase transit coverage of this area. Metromover already services the Brickell Financial District. Unfortunately, its alignment is a block west of Brickell Avenue, while the greatest concentration of workers is found along Brickell. In fact, most of the larger buildings are on the east side of Brickell. This alignment requires Metromover users to walk a block and then cross Brickell Avenue, a very busy arterial. Extending the Metromover in a loop configuration, through the east side of Brickell, will solve the existing limitations of the system. The improvement, as proposed, will complete a Metromover two-way loop through the Brickell Financial District. This extension will greatly increase coverage of the area, thereby reducing walking distances, eliminating the need to cross Brickell Avenue and, in general, making the system much easier to use. Recommendations Pa� 7-28 390 Miami Downtown Transportation Master. i 7.2.28 Depress 1-395. Omni/Overtown/Park West, because it is located on the other side of I-395, seems detached from the Downtown Miami core. The idea of depressing I-395 "The idea of depressing I-395 emerged from the need to integrate this area and the emerged from the need to integratethis area and the CBD. Urban design CBD. Urban design issues, aesthetics, pedestrian issues, aesthetics, pedestrian circulation, and the like drive this need. Moreover, circulation, and the like drive this the construction of the Performing Arts Center has need." made this need more urgent. Only by removing the elevated roadway will these areas be able to function as one, taking advantage of the amenities of each other and increasing the synergy that each area would offer the others. There have been at least two principal concepts proposed for this project. One, developed by FDOT, consists of operational improvements to the elevated freeway section. The second concept, developed by a group of individuals with interest in the area, proposes depressing I-395 and constructing an at -grade grand boulevard parallel to the depressed freeway. The second alternative seems to accomplish all the stated goals and fit with the concerns of area residents, workers, businesses, and visitors. The typical section for the second concept is shown below. The concept proposes depressing I-395 and creating at -grade frontage roads connecting with the existing street network. Detailed analysis of both concepts has been conducted over many months. Extensive public involvement has also been undertaken. ,A) F This process, which! ,4 includes a detailed ------------- review of benefits and 71 � costs, is nearing completion. Obviously, the Longitudinal cross section of the proposed 1-395 underpass concepts are mutually exclusive. At the conclusion of the process the option to be implemented will be the one that best fulfills the area needs while balancing benefits and cost considerations. Recommendations Page 2 123�U Miami Downtown Transportation Master. ..t 7.2.29 Implement Flagler Shuttle. The Flagler Street improvement project has several components. The traffic flow changes discussed in the previous section would provide for a circulation system easier to use for the motorist than the existing one-way configuration. The vehicular flow changes, however, will also support a high frequency shuttle service on Flagler Street between Biscayne Boulevard (Bayfront Park) and the Miami -Dade Cultural Center (museum/library complex). Such a system is intended to service this important corridor and make it more appealing for Downtown Miami workers and visitors alike. The Downtown Miami shuttle system is envisioned as a short -headway (time separation between vehicles) service using electric buses. The proposal for electric shuttle buses aims to replicate the great success of electric buses in South Miami Beach. These small buses are air-conditioned, use a distinctive modern exterior, have amenities such as music, and are clean and well maintained. The vehicles are also quiet and free of air emissions. Therefore, these vehicles are also very acceptable to those walking in the area. The system is already in the TIP, has secured funding, and will start operation soon. Terminal facilities for the shuttle will be provided at the west end of the route near the Miami -Dade County Courthouse. 7.2.30 Provide a Port Boulevard U -Turn. The AmericanAirlines Arena and Bayside share a common challenge: access to and from Port Boulevard. A direct vehicular connection between the two sites is also desirable because of the interaction of both land uses. A new connecting roadway has been proposed under the Port Boulevard Bridge. The roadway would provide continuity between the frontage road on the south side of Port Boulevard (adjacent to Bayside) and the frontage road on the north side (adjacent to the AmericanAirlines Arena). This roadway under the Port Boulevard Bridge would be immediately adjacent to Biscayne Bay. At this point the Port Boulevard Bridge has already risen and provided enough vertical clearance for the road to be built under it. The space between the bridge abutment and the bay, however, is narrow, so a partial widening toward the Bay may be needed. Recommendations Page 7-30 1.26390 Miami Downtown Transportation Master. i 7.2.31 Create a Shuttle System for the Brickell residential area (from 13 Road to 26 Road). A transit shuttle has recently been implemented in the Brickell area. But the system services the commercial areas only. Residents of areas to the south do not benefit from it. An important connection, therefore, is missing. Many area residents work in the Brickell business district and/or Downtown Miami. An effective shuttle system would enable these residents, as well as others conducting business in Brickell, to ride the shuttle, thereby avoiding traffic congestion as well as the cost and the challenge of finding a parking space. The proposed residential Brickell transit shuttle would generally service the Brickell Avenue corridor between 14 Street and 26 Road. An effective shuttle service provides frequent service for long hours. At a minimum, weekday service should be implemented. Weekend service should be explored after the success of the weekday shuttle has been tested. The other important feature of a shuttle service involves destinations and/or connectivity. Ideally, the An effective shuttle system would enable Brickell residents to ride the shuttle and help reduce traffic congestion. proposed shuttle should be connected to the existing commercial area shuttle route and become an extension it. This extension, however, must be accomplished without compromising the frequency of service or convenience to the user. 7.2.32 Provide a transit greenway. Transit greenways, relatively new technology used on a limited basis at select locations, covers a wide range of vehicles, but in general, it is a low -speed conveyance system to supplement and/or facilitate walking. Users can get on or off at their convenience because the vehicle moves so slowly, it does not have to stop for the passenger to embark/disembark. The system circulates at high frequencies and does not stop along the specific corridor where it is located. The Miami -Dade Community College Wolfson Campus is an ideal location for such technology. The system would be located along NE 4 Street from NE 1 Avenue to Biscayne Blvd. This street is already closed to traffic within the campus core. The portion of the street that is open aligns with Recommendations Page 7-31 123,90 Miami Downtown Transportation Master Bayside Market Place—an alignment that will both service internal walking needs within the campus and provide a connection to Bayside for shopping, dining, and/or entertainment. This proposal needs to be included in the LRTP. As a new technology, perhaps a demonstration project grant can be obtained. 7.2.33 Implement traffic calming alternatives through Brickell residential areas. These improvements are aimed at making the Brickell area more livable and user-friendly for residents. The area has an interesting mix of high-rise/high-density housing as well as low density, and even single-family homes. The improvements will involve not only Brickell Avenue but also Coral Way and Miami Avenue. There is an overwhelming concern with the volume and speed of what is, for most the part, cut - through commuter traffic in the residential areas. Unfortunately, the area does have a large amount of existing non-residential (primarily office) development. Given the few routes available to access both the residential and the commercial areas, both land uses must co -exist as harmoniously as possible. Over time, the focus of future growth is expected to be in the CBD and the Omni/Overtown/Park West areas. In the meantime, traffic calming will help alleviate some of the residents concerns. Traffic calming alternatives may include roundabouts, chokers, curb extensions, gateways, texture crossings, landscaping, etc. Specific treatments and locations, however, must be developed and implemented in close coordination with the affected community. The overall objective is balancing the desire to minimize the impact of cut -through traffic for area residents while at the same time preserving needed access routes and capacities to service both the commercial and the residential components of this community. 7.2.34 Extend Metromover into Wynwood. The rationale for additional transit service in this area is outlined in the description of the proposed shuttle system for Wynwood. The proposed alignment should take the form of a loop in order to maximize coverage, reduce walking distances, and improve convenience. The alignment should follow the NW 2 Avenue and the Biscayne Boulevard corridors. Recommendations Pa7-32 123�e �U Miami Downtown Transportation Master. 7.2.35 Extend the Metromover to 26 Road. The need for this system extension is the same as that for a shuttle system in the Brickell residential area south of 14 Street. The service that Metromover can provide, however, is vastly superior in capacity and reliability. 7.2.36 Build an 1-95 northbound on-ramp at North 6 Street to provide access to westbound SR 836. The western portions of Miami - Dade County, already heavily populated, will continue to develop even further. Yet traveling west from the core of Downtown Miami can be challenging, especially for those not familiar with the Downtown Miami street system and travel patterns. The main artery providing freeway access to most of west Miami -Dade County is SR 836 (Dolphin Expressway). Today, access to SR 836 from the Downtown Miami core can The proposed ramp will provide access to westbound SR 836. be directly accomplished from the I-95 Distributor Ramps at the south end of the core. But the I-95 on-ramp at NW 8 Street allows access only to I-95 north. The northbound entrance ramp puts motorists on the extreme right lane of northbound I-95. From this lane, access to westbound SR 836 is physically impossible. The only other access to westbound SR 836 is through the Park West/Overtown area just south of Omni. Entrance ramps from NE 1 Avenue provide a connection to I-395, which interchanges with SR 836 west of the entrance ramps. The proposed improvement would construct a new left entrance on-ramp to westbound SR 836. The ramp would be built between the existing northbound and the southbound mainline lanes and would start at NW 6 Street. The new ramp would allow easy, convenient access to westbound SR 836. This project already has design and construction funding allocated in the current TIP. Recommendations Page 7-33 12390 Miami Downtown Transportation Master, 7.2.37 Improve North 14 Street from 1-95 to Biscayne Boulevard NW/NE 14 Street provides limited circulation within the adjacent street network and does not facilitate efficient east -west travel. This is a result of an inconsistent cross-section and lack of continuity within the roadway network This project proposes improving NW/NE 14 Street to a four -lane undivided facility from east of I-95 to Biscayne Boulevard. Major intersections will be signalized on a coordinated system, with priority given to east -west traffic, where practical. This improvement will provide quick access to the proposed NW 1 Avenue corridor from Biscayne Boulevard and the Venetian Causeway. I :IYlc..OPEN OAGE.T0... INTERACT -,WITH THE N.W 13th3TIHE1 Proposed Improvements to North 14 Street. 7.2.38 Provide Commuter Rail to Broward County. UN Eftmg fie H...%2 ;Ht!.* $#=. a f:I The Tri -Rail system does not provide a direct, convenient connection to Downtown Miami. Tri -Rail ends near Miami International Airport. The only rail connection to Downtown Miami is via an awkward transfer from Tri -Rail to Metrorail at the Tri -Rail Metrorail station on NW 79 Street. Better service for commuters is definitely needed to improve transit access to Downtown Miami. Many alternative alignment options exist, including the reuse of an existing railroad corridor coming into Downtown Miami. The most appropriate use for the corridor is presently under study. Regardless of the findings of that study, though, a major commuter connection should be developed. 7.2.39 Provide a Brickell Key Water Taxi. The study area is bounded by water to the east, yet several island destinations exist to the east as well. Another body of water, the Miami River, splits the study area near the center. Water -borne transportation, therefore, offers an unusual means of overcoming those natural barriers while taking Recommendations pat 7-34 Miami Downtown Transportation Master. t advantage of yet another mode of travel. Fisher Island (further east, near south Beach), for example, does not have any bridges and provides 24-hour ferry service for residents and visitors to take their vehicles across Government Cut and onto the island. Water taxi service as a for-profit operation is presently working well in Ft. Lauderdale and other cities. The same service was available in Miami for a few years. The potential is certainly there for this type of operation to return to Miami, especially given the intensity of development in recent years. Water taxis provide another non -vehicular mode of travel. One connection that is particularly attractive for some type of Water Taxi/Ferry service is between Brickell Key and the Central Business District. The location of Brickell Key, an island south of the mouth of the Miami River, often results in difficulties leaving the island by car when the Brickell Bridge opens for marine traffic. A water-based connection between the island and the Hyatt Hotel would allow many trips to cross the river unimpeded, and travelers could walk to their final destination in the CBD. Longer trips could take advantage of the Metromover station at the Knight Center. In fact, the Metromover connects to Metrorail and many bus routes. Access to the rest of the Miami -Dade County would thus be greatly facilitated. The ideal funding of this operation is through self-supporting fares, with management by a private company. Another option is through a subsidized cooperative effort among businesses interested in supporting such a service as a convenience to their customers, residents, workers, and visitors. 7.2.40 Provide a Water Taxi/Ferry to Watson Island Watson Island is becoming a more recreation -oriented destination. Parrot Jungle has recently relocated here. Soon a children's museum, visitors' center, and a mega -yacht marina/hotel/restaurant /retail complex will be built. The island's main mode of access is via automobile across the MacArthur Causeway. Many Metrobus routes presently use the causeway on their way to/from Miami Beach. A light-rail system connecting Downtown Miami and South Miami Beach has been recommended in the MDTMP. This study also suggests a conventional transit shuttle service as an interim high -frequency transit connection to the island. The potential for a water -borne connection also seems a viable necessary means of making this destination both more accessible and interesting while further strengthening the relationship between Watson Island and Downtown Miami. Recommendations Page 7-35 12390 Miami Downtown Transportation Master, The proposed service could very well be undertaken by the private sector either as a fare -driven, self-sufficient, for-profit operation, or as a collective effort subsidized by the developments serviced by the water taxi. The most logical connection to Downtown Miami would be to the Bayside Market Place Marina. Other connections may include the Port of Miami (for customers working there or cruise -ship passengers). With added redevelopment and improvements in the area, other stops may be considered in the future in Omni/Overtown/Park West, Bicentennial Park, Bayfront Park, Brickell Key and perhaps other destinations along the Miami River. 7.2.41 Provide a partial 1-95 Interchange at NW 29 Street. The Wynwood area and the south end of the Design District have long endured awkward access from I-195 via partial interchanges at Miami Avenue and Biscayne Boulevard. This is very frustrating to area residents and businesses because the area is immediately adjacent to I-95. Direct access to/from I-95 has never been provided due to the proximity of the SR 112/I-195 interchange to the north and the SR 836/I-395 to the south. This interchange spacing, in fact, prevents a full I-95 interchange for the Wynwood/Design District area. However, a more direct connection can be achieved via a frontage road or a Collector - Distributor (CD) road system built parallel to and adjacent to the I-95 lanes. These are similar concepts. Frontage roads are at -grade without access control. CD roads have full control of access and can have ramps connecting to the surface road system. The proposed interchange would be built in the vicinity of NW 29 Street. 7.2.42 Construct an interchange on 1-95 at NW 14 Street. Residents and businesses just north of I-395 and east of I-95 have requested a direct connection to I- 95. Presently, to access I-95 from this area vehicles have to travel east to Biscayne Boulevard to I- 395 or south into the CBD to I-95. This project proposes a new I-95 interchange at NW 14 Street. This interchange will provide direct connection to/from I-95 to the Omni/Overtown/Park West area, an improvement compatible with the proposed improvements to NW 14 Street and the extension of West 1 Avenue. 7.2.43 Depress 1-95. The concept of depressing I-95 (below grade) responds to the issue of the incompatibility of freeways with vital Downtown Miami environments. Freeways do not make good neighbors, nor do they encourage pedestrian activity. For the most part, lands immediately adjacent to freeways are Recommendations Page 7-36 12399 Miami Downtown Transportation Master. i poorly utilized. In many cases, the freeway itself becomes a physical and psychological barrier preventing redevelopment. Depressing freeways is being considered in many areas in the vicinity of Downtown Miami cores as a way to revitalize the area, make it more aesthetically pleasing, attract pedestrian activity, and abate freeway noise. This proposed improvement through Downtown Miami would be an ambitious and very costly project, with its share of construction -related problems. Yet it would forever change the aspect of Downtown Miami and bring many direct and indirect benefits. Special funding will likely be needed to achieve an improvement of this magnitude. As proposed, I-95 would be depressed north of the SR 836/I- 395 interchange. At that point mainline I-95 would go into an open -cut section proceeding south, below ground level, and frontage roads would be constructed at - grade to fully connect with the existing Downtown Miami street grid. The frontage roads would terminate north of the River by Depressing 1-95 would forever change the aspect of Downtown tying into the proposed "Grand Miami and bring many direct and indirect benefits. Boulevard" that will replace the distributor ramps in the vicinity of South 2 and 3 Street. The exact configuration would need to be carefully studied to minimize and/or, preferably, avoid right-of-way acquisition. In concept, however, it might look like the exhibit below in those areas where sufficient right of way is Recommendations Page 7-37 1263tlU Miami Downtown Transportation Master. available to provide an adequate number of lanes on both the freeway (I-95) section and the frontage roads. Cantilever (overhang) design variations and/or fully enclosed tunnel sections could be used to minimize the right-of-way impacts. Ideally, some of the existing I-95 right-of-way could be recovered for other community uses, both public and private. Any private uses would generate property taxes for the city. Preserving the grade separation of the freeway interchange movements to/from SR 836 and I-395 would require some of the ramps to be in tunnel sections. The high-level bridge over the Miami River would be replaced with a tunnel for the I-95 mainline lanes. The I-95 mainline lanes would surface south of SW 15 Road. At that point I-95 would become an at -grade freeway/controlled access road. A frontage road system would also be created south of the river between SW 15 Road and SW 6 Street. Ramps between the frontage road system and the I-95 mainline lanes will also be needed. At a minimum, one such of set of ramps will be needed south of the river and two sets north of the river. Existing interchanges north of its terminus (US -1) would need to be reconstructed as well. Additionally, the at -grade crossing of Metrorail should be replaced with a grade -separated crossing by elevating this section of the Metrorail guideway. If Downtown Miami is to continue to grow and mature into the global center of commerce envisioned by its community and city leaders, then it is crucial that proper investment in the transportation infrastructure be planned for the long-term, as well as the short-term. Without such investment, traffic congestion will worsen and not only discourage new business and residential investments but also push existing businesses to relocate. To reach the levels of development envisioned by community and city leaders, more emphasis is placed on transit use (Metrorail, Metromover, shuttles, etc.) and improving the pedestrian environment. As reflected in the recommended transportation improvements discussed above, employees, residents, and visitors to Downtown Miami will need to significantly reduce their reliance on automobiles to maintain manageable levels of mobility. See Exhibits 7-1 through 7-3 for maps of the recommended transportation system improvements by subarea. Recommendations page 7.38 12390 Miami Downtown Transportation Master. i Recommendations Page 7-39 124390 Miami Downtown Transportation Master _n Recommendations Page 7-40 1.2390 Exhi,b*i. \Vc,,,t Aivo Impro\oilcnis milaml IlTrall "'portal lon Master Plall Miami Downtown Transportation Master i 8.0 IMPLEMENTATION Implementation of any transportation plan involves numerous logistic, jurisdictional, funding, and process -related issues. Although the study area is located within the City of Miami boundaries, some of the principal transportation components are owned and operated by other agencies. For example, Metrorail, Metromover, and all of the traffic signals are under the jurisdiction of Miami - Dade County. Brickell Avenue, Biscayne Boulevard, the I-95 Distributor Ramps, and I-395 are owned and operated by the FDOT. Further, the U.S. Department of Transportation also has some jurisdiction over the Interstate and the U.S. Highway System. Additionally, federal funding is conditioned upon a continuous transportation planning process that must be followed by all metropolitan areas. In Miami -Dade, the agency responsible for coordinating the planning and funding of transportation projects is the Metropolitan Planning Organization (MPO). The process used for this coordinated planning process is open to the public, and all the agencies and jurisdictions involved and/or affected are participants. Elected officials are responsible for setting policy direction as members of the MPO Governing Board. The area's transportation agencies proviae tecnmcai expertise, follow-through, and effort necessary to "...the direct, continued and aggressive utilize implementation funding based on policy participation of elected officials is direction. It is ultimately the elected officials who perhaps the most important decide what portions of the plan are pursued, what implementation element of a plan." the priorities should be, and how funding gaps should be addressed. Therefore, the direct, continued and aggressive participation of elected officials is perhaps the most important implementation element of a plan. This type of leadership has been in place since the beginning of this study and its continuity is critical to the success of this ambitious and visionary MDTMP. 8.1 Schedule The MDTMPs Technical Evaluation Committee estimated an implementation schedule for each improvement: Phase 1—through 2010, Phase 2-2011 through 2015, and Phase 3-2016 through 2020. The schedule recognizes that more detailed studies, conceptual and final designs, and construction timeframes must be accommodated. See Exhibits 8-1 through 8-3 for the expected implementation phase for each improvement. Implementation Page 8-L 1�3 i Miami Downtown Transportation Master. i Recommended Improvement Phase Create a Transit Free -Fare Zone l Implement Intelligent Transportation Systems (ITS) alternatives to help 1 with bridge openings 3` Improvetransit amenities 1 Connect Brickell to other neighborhoods with transit' l Develop pedestrian corridors 1 Implement Miami River Greenway Action Plan for the south side 3 of the Miami Riverl l Convert one-way streets to two-way streets 1 Connect Brickell Shuttle to Flagler Shuttle 1 Construct a new tunnel under the Miami River at SW 1 Avenue 2 Extend SE 1 Avenue from SE 8 Street to SE 5 Street 2 Complete Downtown DDA Downtown signage plan 1 Loop Metromover through the Brickell Financial District 3` Improve bicycle routes/facilities 1' Provide shuttle system for the Brickell residential' areas l Implement traffic calming alternatives through Brickell residential areas 1 Extend the Metromover to SE 26 Road 3 Provide a water taxi from Brickell Key to the Riverwalk Metrornover station l Depress I-95 and create a Grand' Boulevard' 3 Note: Phase 1: Implementation by 2010, Phase 2: Implementation by 2015, Phase 3: Implementation by 2020 Implementation Page 8-2 12390 Miami Downtown Transportation Muster i Recommended Improvement Phase Create a Transit Free -Fare Zone I Provide pedestrian connections from Bayside to AA Arena 1 Extend 'Miami >Beach light rail (Baylink) into downtown 2 Convert one-way streets to two-way streets 1 Improve transit amenities I' Connect CBD to other neighborhoods with transit 1 Complete the Flagler Street Corridor improvements I Develop pedestrian corridors I Implement Miami River Greenway Action Plan for the north side 1 of the Miami Riven 1 Re -align Metromover and add new station at DuPont Plaza area 1 Implement Intelligent Transportation System (ITS) for special events 1 Complete Biscayne Boulevard' improvements l Construct a new tunnel under the Miami River at SW 1 Avenue 2 Complete DDA Downtown signage plan 1 Extend W 1 Avenue Corridor (Arena Boulevard) 2' Improve bicycle routes/facilities l Extend fixed guideway to AA Arena and Seaport 3 Remove Distributor Ramps and provide a Grand Boulevard on S 3 St 2 Implement Flagler Shuttle 1 Provide Port Boulevard U-turn 1 Implement shuttle system from Watson Island l Provide a Transit Greenway 3 Provide a I-95 NB on-ramp at NW 6 St to provide access to WB SR 836 & 2 Improve N 5 & 6 Streets for truck traffic Provide Commuter Rail to Broward County 3 Provide a water taxi from Watson Island' I Depress I-95 and create a Grand Boulevard 3 Note: Phase 1: Implementation by 2010, Phase 2: Implementation by 2015, Phase 3: Implementation by 2020 Implementation Page 8-3 12390 Miami Downtown Transportation Master. Recommended Improvement Phase Create a Transit Free -Fare Zone 1 Extend Miami Beach light rail (Baylink)' 2 Connect Q/UT/PW with other neighborhoods with transit 1 Develop pedestrian corridors 1 Convert one-way streets to two-way streets 1 Implement Intelligent Transportation System (ITS) for special events l Provide a pedestrian walkway along the Bay from Pace Park to Bayside 1 Complete Biscayne Boulevard improvements 1 Improve pedestrian connections to Bicentennial Park 1 Provide tunnel from Seaport to Watson Island 3' Extend W I Avenue Corridor Extension 2 Implement DDA Downtown signage plan 1 Improve bicycle routes/ facilities 1 Provide a shuttle system into Wynwood 1 Depress I-395 to provide Grand Boulevard 3 Extend Metromover into Wynwood 3 Improve N 14 St from I-95 to Biscayne Blvd 1 Provide Commuter Rail to Broward County 3 Provide a new partial I-95 Interchange at NW 29 St 1 Provide a new I-95/NW 14 St Interchange 2 Depress I-95 and create a Grand Boulevard 3 Note: Phase 1: Implementation by 2010, Phase 2: Implementation by 2015, Phase 3: Implementation by 2020 Implementation P e 8- Miami Downtown Transportation Master. i The aforementioned phases are predicated on the estimated time needed to get improvements ready for construction (planning/studies, design, securing funding, and bidding). Phase I recommendations, therefore, are those that require the least time to get ready. Most of them would need a relatively minor amount of funding. In some cases, a funding source is already available for these projects. Projects in Phase 2 would require a considerable amount of funding and significant planning to move them forward. Fortunately, a new, dedicated funding source for transportation projects was implemented on January 1, 2003—the Half -Cent Transit Sales Tax, which is discussed in more detail below. Additional funding, such as special grants, may still be necessary for certain major projects. The Phase 3 projects are even more complex technically and many will require extensive funds that may not be available based on available funding sources and expected funding levels. This is perhaps the biggest challenge and the area where aggressive leadership from elected officials will be most effective. New and/or unconventional funding methods will likely be required to achieve the full implementation of the MDTMP, especially, the projects in Phase 3. 8.2 The Half -Cent Transit Sales Tax The philosophy of the Downtown Task Force was that this MDTMP should focus on visionary solutions to its transportation system. Securing the funding for the transportation improvements would follow with political and community leadership. In November 2002, the voters in Miami -Dade County overwhelmingly passed the People's Transportation Plan. This plan levies a half -cent transit sales surtax to provide (1) more and higher quality transit and (2) funding to municipalities for roadway and transportation projects. Twenty percent of the sales surtax proceeds will be distributed to municipalities based on their population. Each municipality shall apply 20% of its share of the proceeds towards transit improvements, with the balance to be used for other transportation/roadway projects. It is estimated that the City of Miami, being the largest municipality in Miami -Dade County, and higher quality transit. ImplementationP,8-5 .it�3 {I eG Miami Downtown Transportation Master will receive annual surtax proceeds of over $ I OM. This new, dedicated funding source will enable implementation of many of the MDTMPs recommendations by the year 2020. 8.3 Long Range Plan All transportation improvements within Miami -Dade, regardless of municipal boundaries, must follow the guidelines established by the Federal Highway Administration and the Federal Transit Agency. These requirements are very specific in that transportation improvements using public funding must be included in the Long Range Transportation Plan (LRTP) and the (shorter range) Transportation Improvement Program (TIP). The recommendations in this study are no exception. Each recommendation must be included in the LRTP and the TIP. However, all recommendations need not be included simultaneously. Given the required process, each recommendation should follow its own path until implementation is competed for all. The Paramics simulation model developed as part of this Master Plan should be used, on a continuous basis, for more detailed analysis and further evaluation of the recommendations as part of the process that will move the improvements closer to implementation. 8.4 MDTMP Flexibility Finally, the recommendations in this study are based on several scenarios of how Downtown Miami may develop through the year 2020. Inevitably, the market and external economic factors will play a role in how much, when, and where development will occur within the study area. Since this study cannot anticipate every possible variation that might happen over time, the MDTMP must be considered a "living plan." This means that implementation should be constantly checked against actual conditions and deviation from the forecasted development scenarios. Development "The MDTMP, therefore, must not only remain flexible and react to changing conditions, but must be constantly checked against its guiding principles, goals, and objectives." type, intensity, and timing all affect what , transportation improvements are implemented and when. The MDTMP, therefore, must not only remain flexible and react to changing conditions, but must be constantly checked against its guiding principles, goals, and objectives. This approach will ensure implementation in a sequence that is consistent with the original intent, satisfies the most urgent needs at that particular point in time, and does not create conflicts between the various components of the transportation system. Implementation Page 8-6 12390 Miami Downtown Transportation Master I The MDTMP presents the most viable long-range vision for the Downtown Miami transportation system. The resulting MDTMP focuses on multiple modes of transportation to help resolve mobility issues for Downtown Miami and better connect neighborhoods to this area. This plan places an emphasis on the continual upgrade of the transit system and pedestrian environment which are key components needed to turn the vision of Downtown Miami—a unique, progressive, and vibrant place in which to work, live, and play—into reality. The MDTMP presents the most viable long range vision for Downtown Miami- a truly world class city. Implementation Page 8-7 12390 Miami Downtown Transportation Maste n Appendix A Transportation Projects/Studies in Downtown Miami Appendix A Page A-! 12390 Miami Downtown Transportation Maste n Transportation Projects/Studies in Downtown Miami Reports Inventory and Summary Miami Downtown People Mover Demand Analysis Model This includes the various tables and comparative graphs developed from past experiences and available data to analyze and model transit system in the Miami Downtown Area. Port of Miami Tunnel & Access Improvements PD&E Study (1996) The purpose of this study is to develop a cost effective program to link The Port of Miami to the Interstate system and to consider various issues to establish future traffic patterns and projections. East-West Multi Modal Corridor Study — Preferred Investment Strategy Report (1995) The study analyses various alternatives for improving the transportation capacity in the project corridor and propose the best transportation improvements from the alternatives evaluated. Downtown Miami Traffic Access and Mobility Improvement Study (1981) The purpose of this report is to define traffic characteristics and to establish and quantify the traffic demand and make future projections. Also to identify travel demands that exceed the street and transit capacities and develop and evaluate alternatives. Miami Surface Shuttle Services: Feasibility Study for Transit Circulator Services in Downtown Miami, Brickell, Overtown and Airport West (2000) The purpose of this report is to analyze the potential of Flagler Street and Brickell to support shuttle services and to develop alternative routes and represent their levels of service along with the approximate capital and operating services associated with each. The report will identify the potential sources of funds for paying for these services. Year 2000 Fast Track Transportation Initiative (1999) The City of Miami Downtown Development Authority (DDA) has an economic plan that includes a sound transportation system balancing Rapid -rail, Metromover, buses, motor vehicles and pedestrian modes of travel. This report features the immediate transportation needs that DDA has identified in that plan. Downtown Miami: A Conceptual Transportation Plan (1973) The general goal of this study is to develop improved transportation facilities which will provide for fast, safe and efficient movement of vehicular and pedestrian traffic in downtown Miami. In addition, these facilities will provide the greatest positive benefits and least negative impacts for the City of Miami. Appendix A Page A-2 1239,10 Miami Downtown Transportation Maste n Southwest Second Avenue Crossing the Miami River Comparative Analysis of Alternative River Crossings (1985) This report presents in detail the facts and conclusions derived from a comparative study of several alternate proposals for improvement in the crossing of the Miami River along the line of SW 2nd Avenue. Miami - The Downtown Master Plan (1989) The Downtown Miami Master Plan builds a overall policy framework for a functional, accessible, stimulating and friendly downtown. This plan is designed to meet the technical needs of developers, administrators, politicians, and planners and to provide insight to citizens about the potential of downtown. 195 Downtown Ramps - Downtown Circulation Loop Master Plan (1997) This report does a traffic analysis and provides the alternatives for the SR 970/I 95 Downtown Distributor Ramps (DDR). This is part of a Project Development & Environmental (PD&E) study to determine if reconstruction or elimination of the SR 970/1 95 Downtown Distributor Ramps is beneficial and practical from a transportation and socio-economic perspective. Maritime Park Preliminary Concept Master Plan Project (1997) This is a concept plan that proposes that, port expansion occur in a new pier configuration, with megaships placed on each side, and provides for a third mega -ship parallel to the shoreline in a future phase if necessary. This plan attempts to balance the need for revenues with an equally profound need for an accessible, desirable and vibrant destination on the waterfront. Traffic Impact Study for Performing Arts Center (1997) The purpose of this report is to indicate the traffic impact due to the development of the Performing Arts Center, on the surrounding roadway network. I-95 Dupont Plaza Ramps, Alternative Feasibility study (1993) The objective of the this study is to develop a preliminary Boulevard concept, similar to Biscayne Boulevard located on the eastern edge of the downtown area, and determine the feasibility of reconstructing the existing I-95 distributor ramps that currently access downtown Miami via the Dupont Plaza area. NW SW 1st Avenue — NE/NW 14th Street Feasibility study (1998) This report studies the feasibility of enhancing the NW/SW 1st Ave and NW 14th Street corridors by modifying the existing roadway cross-sections on these corridors and creating a better geometric connection between NW 1st Ave and NW 14th Street. The objective of the improvement is to provide an alternative route for motorists traveling from Biscayne Boulevard in the vicinity of the Venetian Causeway to the Government Center area in downtown Miami. Appendix A Page A-3 12390 Miami Downtown Transportation Maste n Downtown Miami Circulation Study (2000) This study analyses the existing Downtown Miami roadway network to identify: critical traffic demand locations and the potential solutions, and areas with available capacity. Port of Miami Cruise Ship Terminal Operations Traffic Study (1981) The purpose of this report is to analyze the travel patterns of cruise ship passengers and project traffic volumes and further make recommendations to effectively handle it. Brickell Key Traffic Calming Study (1996) This report studies the traffic circulation and traffic operations in the Brickell Key and makes recommendations for traffic calming measures. Port of Miami Master Development Plan (1988) This report presents information about existing and future conditions in the Port and adjacent area and the guidelines the Port has developed to guide its day to day operations and its long term expansion program. Downtown Miami Transportation Report (1985) The report addresses issues related to Streets and Highways, Transit/Para Transit, Parking and Pedestrian Circulation in the downtown area. It also makes recommendations for improvements taking future conditions into consideration. One Miami Master Traffic Study for Master Use Special Permit (MUSP) (2000) This report does the MUSP traffic impact study in accordance to the Downtown Miami DRI and makes recommendations regarding the projects compliance. Miami CBD Maintenance of Traffic (1982) This report proposes maintenance of traffic, required due to the reconstruction and eastern extension of the I-95 downtown distributor, by rerouting traffic to alternate roadway facilities. 195 Downtown Distributor - Design Study Report (1982) The report studies and recommends geometric design layouts and develops operating strategies for the improved I-95 Downtown Distributor. Downtown Miami Convention and Cultural Center (1968) This report does an inventory analysis of existing conditions and the development of proposals and plans for developing convention and cultural accommodations with amenities suitable for business, social and intellectual exchange. Appendix A Page A-4 12396 Miami Downtown Transportation Maste, t Downtown Miami Transportation Center and Air Rights Development (1968) This report presents the proposal for the development of the air rights over the combined system of railroad and road transport rights-of-way provided by the East-West Major Arterial and the area of interchange with the North-South major arterial, and a Transportation Center. Biscayne Boulevard/SR-5/US-1 (From NE 35th Terrace to NE 105th St) PD&E Study (2000) The objective of this report is to develop and document the design criteria and engineering decisions used to develop alternatives for roadway improvements on this section of Biscayne Boulevard. Long Range Transportation Plan Update (1995) This is a technical memorandum, which describes the computer program developed and assumptions used to produce directional trip distribution from a zone. Metro Miami — Market Place (1995) This is to make recommendations and hence establish goals for development in the major areas including the Downtown area in Miami to accommodate future growth. Appendix A Page A-5 1 90 Miami Downtown Transportation Master, Appendix B Acknowledgements Appendix B Page B-! Miami Downtown Transportation Master f ACKNOWLEDGMENTS CITY OF MIAMI COMMISSIONERS Mayor Manuel A. Diaz Commissioner Angel Gonzalez Commissioner Joe Sanchez Commissioner Johnny L. Winton Commissioner Tomas Regalado Commissioner Arthur E. Teele, Jr. MIAMI-DADE COUNTY COMMISSIONERS Alex Penelas, Mayor Steve Shiver, County Manager Bruno A. Barreiro, District Five Dr. Barbara Carey -Shuler, Chairperson, District Three Jose Diaz, District Twelve Betty Ferguson, District One Sally Heyman, District Four Joe Martinez, District Eleven Jimmy L. Morales, District Seven Dorrin O. Rolle, District Two Rebeca Sosa, District Six Natacha Seijas, District Thirteen TASK FORCE MEMBERS Comm. Johnny L. Winton, City of Miami Comm. Arthur E. Teele, Jr. City of Miami Frances M. Bohnsack, Miami River Marine Group Jeff Cohen, Miami -Dade County Public Works William Cullom, Greater Miami Chamber Clark Turner, City of Miami Alberto Dominguez, City of Miami Public Works Wilson Fernandez, Miami -Dade County MPO Ana Gelabert, City of Miami Nem Gomez, CH2M Hill Pedro Hernandez, Miami -Dade County Dennis C. Moss, District Nine Katy Sorenson, District Eight Javier Souto, District Ten Comm. Bruno A. Barreiro, Miami -Dade County Danny Alvarez, Miami -Dade County Transit Esther Calas, Miami -Dade County Public Works Josie Correa, Downtown Miami Partnership Rafael De Arazoza, FDOT District VI Jason Walker, City of Miami Gary Donn, FDOT VI Carl Fielland, Miami -Dade Seaport Alfredo Gonzalez, Miami -Dade County Sam Gonzalez, Miami -Dade Expressway Authority Tory Jacobs, Brickell Homeowners Association Richard Judy, Community Redevelopment Agency Ric Katz, CommuniKatz J. Megan Kelly, Swire Properties, Inc. Eleanor Kluger, Omni Advisory Board David Korros, FDOT VI Frank Castaneda, City of Miami Adam Lukin, Downtown Development Authority David Miller, Miami River Commission Appendix B Page B-2 12390 Miami Downtown Transportation Master) Gaspar Miranda, Miami -Dade County Public Works Priscilla Perry, Priscilla Perry & Associates Aristides Rivera, Miami -Dade County Public Works Gerald Sanchez, County Attorney's Office Phil Steinmiller, FDOT, District VI Jose Padilla, St. Agustine Real Estate Advisors Karma Prieto, Parsons, Brinckerhoff Dulce Rodriguez, Miami -Dade County Public Works Ben Starrett, Collins Center for Public Policy Charles Towsley, Port of Miami TECHNICAL RESOURCE GROUP MEMBERSHIP Frank Baron, Miami -Dade County MPO Jeff Cohen, Miami -Dade County Public Works Carl Fielland, Miami -Dade Seaport Adam Lukin, Downtown Development Authority Ben Starrett, Collins Center for Public Policy Alberto Dominguez, City of Miami, Public Works Wilson Fernandez, Miami -Dade County, MPO David Korros, FDOT, District VI Dulce Rodriguez, Miami -Dade County, Public Works Phil Steinmiller, FDOT, District VI LAND USE PLANNING GROUP MEMBERSHIP Clark Turner, City of Miami Frances M. Bohnsack, Miami River Marine Group Eleanor Kluger, Omni Advisory Board Ben Starrett, Collins Center for Public Policy Alberto Dominguez, City of Miami, Public Works EVALUATION CRITERIA COMMITTEE Commissioner Johnny Winton, City of Miami Frank Baron, Miami -Dade County MPO Jeff Cohen, Miami -Dade Public Works Department Carl Fielland, Miami Dade Seaport Alberto Dominguez, City of Miami Public Works Adam Lukin, Downtown Development Authority Capt. Greg Shapley, US Coast Guard (Retired) Tory Jacobs, Brickell Homeowners Association Eleanor Kluger, Omni Advisory Board Karen Cartwright, Overtown Representatives Frances Bohnsack, Miami River Marine Group Tim Keadle, Insignia, E.S.G Raul Tercilla, Rouse -Miami, Inc. Lilia Medina, City of Miami J. Megan Kelly, Swire Properties, Inc. Jose Padilla, St. Agustine Real Estate Advisors Frank Baron, Miami -Dade County MPO Commissioner Bruno Barreiro, Miami -Dade County David Henderson, Miami -Dade County MPO Mario Garcia, Miami -Dade County Transit Authority Clark Turner, City of Miami Rafael DeArazoza, FDOT Richard Judy, Community Redevelopment Agency Josie Correra, Downtown Miami Partnership J. Megan Kelly, Brickell Area Association Jose Padilla, St. Agustine Real Estate Advisors Rosa Cornejo, Wynwood Citizens Advisory Comm. David Miller, Miami River Commission William Senn, American Airlines Arena, LLC. Valerie Riles Robinson, Performing Arts Center Appendix B Page B-3 12390 Miami Downtown Transportation Maste. i Appendix C Summary of Survey Responses Appendix C Page C-! 12390 Miami Downtown Transportation Maste. n Summary of Survey Response Brickell Area Pedestrian ❑ Pedestrian overpasses ❑ Wider sidewalks ❑ Pedestrian friendly intersections ❑ Improve lighting for evening pedestrians 0 Provide pedestrian overpasses on Brickell Avenue Greenspaces ❑ Parks, fountains, museums ❑ Air quality ❑ More trash cans ❑ Upkeep of benches, streets, sidewalks, landscaping ❑ Provide benches along Brickell Avenue ❑ Public gathering spaces ❑ Use European example to model Miami Brickell Avenue Bridge ❑ Limit bridge opening during rush hours Parking ❑ Parking ❑ Eliminate employer subsidized parking downtown, use metrorail ❑ Increase cost of parking 0 New construction should provide adequate parking spaces ❑ More parking near Brickell Bay Village ❑ Reduce illegal parking Transit ❑ Provide metrorail service to airport ❑ At -grade rail/trolley ❑ Expanded metromover service ❑ Exclusive bus lanes ❑ Smaller buses ❑ Better advertising of new Brickell bus service, people not aware Fj Increase promotion of metrorail/metromover locally and in tourist publications Appendix C Page C-2 12390 Miami Downtown Transportation Maste, a ❑ Additional bus routes ❑ Improve bus service ❑ Improve better public transportation service to reduce dependence on cars ❑ Provide shuttle service from residential areas to financial district and downtown ❑ Do not provide exclusive bus lanes or wider sidewalks ❑ Cleaner metromover ❑ Eliminate bus service in Brickell area, connections should be made at metromover or metrorail station ❑ Provide free/very inexpensive shuttle services ❑ Route metrorail to proper areas: Airport, Kendall area, Aventura area. Properly maintaining facilities, provide adequate parking at remote stations Access/Connectivity ❑ Provide better access from Brickell Avenue to I-95 ❑ Improve access to Bayside: paths for bikes, runners, skaters ❑ Improved accessibility ❑ Do not close Brickell Bay Drive ❑ Build tunnel under Brickell Bridge ❑ Alternate routes to US -1 from downtown to Kendall ❑ Provide bike lanes ❑ Limit automobile use in the downtown area ❑ Close Brickell Bay Drive ❑ Eliminate the forced northbound right turn past the bridge ❑ Provide access lanes to larger buildings and developments Development ❑ Too much clustering downtown due to PAC, arena, and new stadium ❑ No stadiums or arenas ❑ Night life, more quality restaurants ❑ Do not issue any more building permits ❑ Additional retail in vicinity to minimize use of cars ❑ Better mix of residential/retail/office spaces ❑ Place moratorium on construction in Brickell Area until traffic study is completed ❑ Brickell Bay Village will be a burden to the Brickell Area Signals/Signing ❑ Traffic signal coordination ❑ Improve signage, lighting, and lane markings from Biscayne Boulevard to I-395 ❑ Traffic signal at Coral Way/ 15 Road ❑ Improve signage and reduce number of signs Appendix C Page C-3 12390 Miami Downtown Transportation Maste a ❑ Enforcement of signs and signals ❑ Have cameras to catch red light violators Traffic ❑ Implement traffic calming in residential areas to redirect through traffic away from them ❑ Improve special event traffic rerouting from AA arena ❑ Convert NE 2 Avenue to two-way during sporting events ❑ Provide use of right lane on Biscayne Boulevard during rush hour ❑ Implement a route along the Bay ❑ Construction traffic (trucks) ❑ Additional lanes on Brickell Key bridge ❑ Westbound traffic at SW 8 Street/Brickell Avenue, redirect traffic from SW 8 Street ❑ No buses from 15 Road to 26 Avenue, local traffic only, more traffic lights to exit driveways ❑ Lower speed limits and enforce them ❑ Restrict truck loading/unloading hours ❑ Implement two-way traffic on SW 8 Street, center lane should be reversible ❑ Eliminate forced right turn lane north of Brickell bridge ❑ Improve maintenance of traffic during construction ❑ Median lighting ❑ Do not widen Brickell Avenue ❑ Reduce noise caused by traffic Downtown CBD Area Greenspace ❑ Increase greenspaces ❑ Provide more public gathering spaces for socializing, representing the cultural diversity of the city Parking ❑ Provide free motorcycle parking Transit ❑ Provide Metrorail service to Miami Beach and Airport from CBD ❑ Act on discussions of providing residential land uses at Metrorail station areas, high density residential should be encouraged at all station areas ❑ Provide Metrorail service to other counties Appendix C Page C-4 12390 Miami Downtown Transportation Maste, I Access/Connectivity ❑ Provide better connection between downtown and rest of the County Development ❑ Increase residential use downtown ❑ Provide after-hours activities in the CBD Traffic ❑ Concerned how changing travel patterns downtown will affect existing businesses (converting one-way streets to two-way, and changing of bus routes) OMNI/Overtown Area Pedestrian ❑ Wider sidewalks ❑ Improve security ❑ Increase Police presence on the streets ❑ Provide pedestrian overpasses on Flagler Street ❑ Provide shelters for bus stops Greenspace ❑ Provide more benches along the streets ❑ Increase landscaping along sidewalks Parking ❑ Provide more parking downtown Transit ❑ Provide Handicap Accessibility and no cost passes ❑ Extend Metromover/Metrorail service to Wynwood and reduce fares ❑ Provide frequent shuttle bus service to Wynwood area ❑ Make bus passes more accessible to wider age bracket ❑ Remove Jitneys from Street eliminate conflicts with buses ❑ Extend Metromover to Overtown at NW lst Avenue/NW 15 Street ❑ Provide bus benches (with dividers to prohibit lying down) under bridges ❑ Provide shuttle service similar to one in Brickell Area to connect neighborhoods and activity centers within the OMNI area and with the CBD ❑ Transportation System improvements for school children in area, unloading of buses at Metrorail/Metromover stations to get to desired locations Appendix C Page C -S 12390 Miami Downtown Transportation Maste n Access/Connectivity ❑ Implement expressway exit onto 36 Street or 29 Street ❑ Implement bike paths through Wynwood ❑ Provide bike paths/lanes and parking for bicycles ❑ Provide pedestrian and bicycle connectivity between neighborhoods and activity centers within the OMNI area 0 Improved pedestrian amenities and connectivity between the OMNI Area and the CBD, specifically the extension of Baywalk from the OMNI Area to the AmericanAirlines Arena and other activity centers in the CBD Development ❑ Increase retail downtown ❑ Take recent increase in residential demand in consideration for future land use areas in Study Traffic 0 Widen Biscayne Boulevard and NE 2 Avenue ❑ Convert NE 2 Avenue to one-way southbound ❑ Widen streets downtown so that buses can pass through ❑ Eliminate one-way streets ❑ Reduce car and truck traffic in area ❑ Enforcement of speed limits ❑ Provide tunnels to minimize traffic Appendix C Page C-6 12399 Miami Downtown Transportation Master i Appendix D List of Meetings Appendix D Page D-1 12390 Miami Downtown Transportation Maste, i List of Meetings and Public Forums No. Meeting With Date 1 Task Force Meeting #1 24 -Jan -01 2 Technical Committee Meeting # 1 12 -Mar -01 3 Forum #1 — (CBD) 09 -Apr -01 4 Forum I - OMNI/Overtown 09 -Apr -01 5 Forum I — Brickell 09 -Apr -01 6 Performing Arts Center 02 -May -01 7 Brickell Area Association 14 -May -01 8 Brickell Homeowners Association 16 -May -01 9 Downtown Miami Partnership 16 -May -01 10 Grand Condo Association (Omni) 23 -May -01 11 Wynwood Citizen Advisory Committee 12 -Jun -01 12 Community Redevelopment Agency (Overtown/ Park West) 25 -Jun -01 13 Greater Miami Chamber of Commerce 26 -Jul -01 14 Task Force Meeting # 2 01 -Aug -01 15 Forum # 2 (Omni) 04 -Oct -01 16 Downtown Task Force #3 12 -Dec -01 17 DDA 15 -Feb -02 18 Brickell Town Hall Meeting 25 -Feb -02 19 Task Force #4 1 -April -02 20 Evaluation Committee 22 -July -02 21 Task Force #5 5 -Sept. - 22 1 Forum #3 (Brickell) 22 -Oct -02 Appendix D Page D-2 12390 Miami Downtown Transportation Master i Appendix E Evaluation Scores Appendix E Page E -I 12390 Miami Downtown Transportation Maste n Evaluation Criteria Un -weighted Scores OPTIONS Transportation Social Economic Environmental Development Investment AVERAGE BRICKELL AREA Develop the following roadways Into pedestrian corridors 3 7 2 9 7 3 5.17 Brickell Avenue - from Miami River to 26 Road (Rickenbacker Cswy) Brickell Bay Drive - from S.8 Street to 15 Road Mam i !venue - from Mami River to S. 12 Street Miami /venue/SE 1 /+venue - from S. 12 Street to 26 Road (Rickenbacker Cswy) S. 13 Street- from 1-95 to Brickell Avenue S. 10 Street. from 1-95 to Brickell Avenue S. 8 Street - from 1-95 to Brickell Key S. 15 Road - from 1-95 to Bayshore Drive W. 2 Avenue - from Miami River to SW 15 Road Miami River Greenway Action plan for the south side of the Lower River 3 7 2 9 1 6 4 5.17 ITS alternatives to help w/ bridge openings 8 4 4 2 3 5 4.33 Improve bicycle routes/facilities 1 1 0 9 3 7 3.50 Improve transit amenities in the area 5 6 3 6 3 9 5.33 DDA Downtown Signage plan 3 4 3 1 1 5 2.83 Two -Way Conversion in Brickell 2 5 7 1 6 8 4.83 5.11 Street from 495 to S 1 Avenue 5.11 Street from S 1 Avenue to Brickell Place S. 10 Street from 1-95 to S 1 Avenue S. a Street from Brickell to Miami Avenue. S. 8 Street from Miami Paenue to 495 S. 7 Street from Brickell to 1-95 S.9 Street from Miami Avenue SW 1 Avenue S.3 Avenue from SW 7 Street to SW 6 Street SW 1 Avenue (west of Metrorail) from SW 11 Street to Miami River SW 1 Avenue (east of Metrorail) from SW 13 Street to SW 7 Street Miami Avenue from SW 12 Streetto Miami River Extend SE 1 Avenue from S. 8 Street to S. 5 Street 4 3 3 0 5 -1 2.33 Water Taxi from Brickell Key to Metromover station @ Hyatt 1 0 3 0 1 1 1.00 Implement Tragic calming alternatives through Brickell residential areas 1 4 2 1 3 2 2.17 Connect other neighborhoods with Transit 5 7 5 5 5 5 5.33 Shuttle System for the Brickell residential area (from 13 Road to 26 Road) 4 2 2 1 2 0 1.83 Connect Brickell Shuttle to Ragler Shuttle 7 5 3 5 3 0 3.83 Transit Free fere Zone 9 7 8 6 6 7 7.17 Loop Matromover through the Brickell Financial District 5 3 2 3 2 -4 1.83 Extend the Metromover to 26 Road 4 1 1 2 2 2 -4 1.17 New tunnel under the Miami River @ W / Avenue 8 3 5 0 1 -3 2.33 Depress 495 and create a Grand Boulevard -1 1 0 -1 0 -5 -1.00 Appendix E Page E-2 12390 Miami Downtown Transportation Maste. .a OPTIONS Transportation Social Economic Environmental Development Investment AVERAGE CBD AREA ` Develop the following roadways into pedestrian corridors 3 8 2 9 7 3 5.33 Miami Avenue -from Mami River to N.6 Street Biscayne Boulevard -from Biscayne BIW. Way to N.6 Street Hagler Street -from 1-95 to Bayfront Park W.2 Awnue - from Mami River to N 6 Street N. 5 Street - from NE 1 Avenue to Biscayne BIW. NE 2 Avenue -from NE 3 Street to NE 5 Street N E 3 Street - from NE 1 Avenue to N E 2 Avenue N E 1 Avenue - from NE 3 Street to N E 5 Street NE 2 Street -from NW 2 Avenue to Biscayne Boulevard S.1 Street- from SW 2Awnue to Biscayne Boulevard N.4 Street - from 1-95 to Biscayne BIW. Miami River Greemay Action Plan for the north side of the Lower Ricer 3 8 2 9 7 3 5.33 Pedestrian connections from Bayskle to AA Arena 5 8 6 9 7 8 7.17 Improve bicycle routeaRecilitlas 1 2 0 9 3 7 3.67 Improve transit amenities in the area 6 6 3 6 3 9 5.50 Extend Miami Beach light rail (M ink) into downtown 8 6 8 6 5 -1 5.33 Port Boulevard LLturn 5 1 2 -1 1 2 1.67 DDA Downtown Signage plan 4 4 4 1 1 6 3.33 Implement Ragler Shuttle 2 3 3 0 5 0 2.17 Im ow N 5 and 6 street for truck traffic 5 -2 4 2 3 8 3.33 Provide a 1-95 NB —ramp at N 8 Street to provide access to WB SR 836 6 -3 4 1 -2 -2 0.67 Complete the Reler Street Corridor improiarments 4 6 5 7 5 2 4.83 Provide tunnel from Seaport to Watson Island 5 2 7 0 4 -4 2.33 Two-ey conwrslen in CBD 3 6 8 1 7 9 5.67 E 2 Awnue from Biscayne Boulevard Wayto NE 6 Street Biscayne Boulevard Way from SE 2 Awnue to Biscayne Boulevard S 3 Street from BE 2 Awnue to Biscayne Boulevard S 2 Street from SE 2 Awnue to Biscayne Boulevard S 1 Street from W 2 Avenue to Biscayne Boulevard N 1 Street from W 3 Avenue to Biscayne Boulevard N 2 Street from W 1 Avenue to Biscayne Boulevard N 3 Street from W 3 Avenue to Biscayne Boulevard E 3 Avenue from Biscayne Boulevard Wayto NE 2 Street Biscayne Boulevard from SE 2 Street to Biscayne Boulevard Way S. Mami Avenue from Mami Riwr to NE 6 Street E 1 Awnue from S 3 Street to N E 6 Street Connect other nelghborhoods with Transit 5 7 5 5 5 5 5.33 W. 1 Avenue Corridor Extension (Arens Boulevard) 4 5 2 0 5 0 2.67 Provide a Transit Oeemvay 2 3 1 3 5 0 2.33 Mal' n Metro— and add neer station ® DuPont Plaza 5 6 6 2 5 -1 3.83 ITS for SpecialEwrds 6 2 4 1 3 5 3.50 Create a Transit Res Fare Zone 9 7 8 6 6 7 7.17 Extend Rxed(#tideway to AA Arens and Seaport 4 3 4 3 2 -4 2.00 Mmove Distributor Mmps and provide a'Qand Boulevard' on S.3 Street 2 2 3 1 9 -2 2.50 Depress "S and create a trend Boulevard -1 1 0 -1 0 -5 -1.00 Appendix E page E-3 1�t11e��I Miami Downtown Transportation Maste. n OPTIONS Transportation Social Economic Environmental Development Investment AVERAGE OMNVOVERTOWN/PARK WEST AREA Dewlepthefollowingroadweys Into desirianeorrld". 3 8 2 9 7 3 5.33 Mami Avenue - from N. 6 Streetto N. 36 Street Biscayne Boulevard -from N. 6 Street to NW 36 Street W.2 Awn us -from N.20 Street to N.36 Street W. 5 Aanue from N-21 Street to N 36 Street N.9 Street -from 1-95 to Biscayne BIW. N. 11 Strael -hom I-95 to Biscayne BIW. N.13 Street -hom 1.95 to Biscayne BIW. N. 14 Street -from 1.954-3951nterchangs to Biscayne BIW. N. 17 Street -from I-95 to NE 2 Avenue N.20 Street from 1-95 to Biscayne BIW. N.29 Street from I -95 -to Biscayne BIW. N. 36 Street -hom I-95 to Biscayne BIW. E 2Q - hom 6 Sl to N W 20 Street Provide a pedestrian walkwa along the Bayfrom Pace Park to Bayside 1 3 2 8 8 8 5.00 Im ow pedestrian connections to Bicentennial Park 1 4 2 8 5 8 4.67 Improv bicycle routes/facilkies 1 2 0 9 3 7 3.67 Realign1395 and improve on/off ramps (based on FDOTplans) 3 -3 3 0 -1 -1 0.17 Two-way conversion In OmnYOwrtawNPark West 2 5 7 1 6 8 4.83 N 9 Streetfrom N 2 Avenue to Biscayne BIW. E 2 Avenue from N 6 Streetto NE 13 Street Mami Awnue from N 6 Street to NE 17 Street E 1 Awnue from N 6 Street to NE 17 Street NE Mami Court from NE 14 Street to NE 18 Street N 10 Streelfrom NW 3 Avenue to Biscayne BIW. N 11 Street from NW 3 Avenue to Biscayne BIW. N 13 Street from Mami Avenue to NE 2 Avenue N 17 Street from Mami Avenue to NE 2 Awnue cam late Dmrdown Signage plan (from DDA) 3 4 3 1 1 5 2.83 Improw transit amenities inthe area 6 6 3 6 3 9 5.50 Biscayne Boulewrd Improvements FOOT Plan) 0.00 Biscayne, Boulevard Improvements (City of Miami Plan) 4 5 3 2 7 1 3.67 W.1 Avenue Corridor Ext region 4 5 2 0 5 0 2.67 Improve N.14 Street from 1-95 to Biscayne Blvd 0 3 1 0 5 1 1.67 Connect other neighborhoods with Transit 5 7 5 5 5 5 5.33 Provide a shuttle system into Wymvood (NW 2 Avenue/36 Street! Biscayne/ Cmn) 4 3 2 1 3 0 2.17 Create a Transit Free Fere Zone 9 7 8 6 6 7 7.17 Depress 1395 from west of PJR to provide •trend Bouleverd' 2 3 3 1 8 -4 2.17 Extend Metro- into Wymwood(N 2 Aven-129 Streell Biscayne/ Omni) 3 2 2 3 2 -3 1.50 Provide a new partial 495 interchange at N 29 Street 0 0 1 0 2 -1 0.33 I-95/NW 14 Street Interchange 1 1 0 0 0 -1 0.17 Depress 1-95 and create a Grand Boulevard -1 1 0 -1 0 -5 -1.00 Provide Commuter Rail to Bard County 3 0 1 2 1 -1 1 1.00 Appendix E Page E-4 12390 Miami Downtown Transportation Maste. a Evaluation Criteria Weighted Scores OPTIONS Trans ortation Social Economic Environmental Develo mentInvestment TOTAL Goal Wei hts 31% 14% 20% 11% 14% 10% Develop the following roadways into pedestrian corridors 0.93 0.98 0.4 0.99 0.98 0.3 4.6 Brickell Avenue - from Miami Rmr to 26 Road (Rickenbacker Cswy) Brickell Bay Drive - from S. 8 Street to 15 Road Miami Avenue - frorn Miami River to S. 12 Street Miami Avenue/SE 1 Avenue - from S. 12 Street to 26 Road (Rickenbacker Cswy) S. 13 Street - from 1-95 to Brickell Avenue S. 10 Street - iron 1-95 to Brickell Avenue S. 8 Street - from 1-95 to Brickell Key S. 15 Road - from 1-95 to Bayshae Dr're W. 2 Avenue -from Miami Rher to SW 15 Road Miami River Greenway Action Plan for the south aide of the Lower River 0.93 0.98 0.4 0.99 0.84 0.4 1 4.5 ITS alternat]vesto het w/ bridge openings 2.48 0.56 0.8 0.22 0.42 0.5 5.0 Improve bicycle routedfacilities 0.31 0.14 0 0.99 0.42 0.7 2.6 Improve transit amenities In the area 1.55 0.84 0.6 0.66 0.42 0.9 5.0 DDA Downtown Signage Ian 0.93 0.56 0.6 0.11 0.14 0.5 2.8 Two -Way Conversion In Wckell 0.62 0.7 1.4 0.11 0.84 0.8 4.5 S.11 Street from 1-95 to S 1 Avenue S.11 Street from S 1 Avenue to Brickell Place S. 10 Street from 1-95 to S 1 Avenue S. 8 Street from Brickell to Miami Avenue. S. 8 Street Iran Miami Avenue to 1-95 S. 7 Street frau Brickell to 1-95 S. 9 Street from Miami Avenue SW 1 Avenue S. 3 Avenue from SW 7 Street to SW 6 Street SW 1 Avenue (west of Melroail) from SW 11 Street to Miami River SW 1 Avenue (east of Metromil) from SW 13 Street to SW 7 Street Miami Avenue from SW 12 Street to Miami River Extend SE 1 Avenue from S. 8 Street to S. 5 Street 1.24 0.42 0.6 0 0.7 -0.1 2.9 Water Tax] from Brickell Key to Metromover station a Flyatt 0.31 0 0.6 0 0.14 0.1 1.2 Implement Traffic calming alternatives through Brickell residential areas 0.31 0.56 0.4 0.11 0.42 0.2 2.0 Connect other neighborhoods with Transit 1.55 0.98 1 0.55 0.7 0.5 5.3 Shuttle System for the Brickell residential area (from 13 Road to 26 Road) 1.24 0.28 0.4 0.11 0.28 0 2.3 Connect Brickell Shuttle to Flagler Shuttle 2.17 0.7 0.6 0.55 0.42 0 4.4 Transit Free Fare Zone 2.79 0.98 1 1.6 0.66 0.84 0.7 1 7.6 Loop Metromover through the Brickell Financial District 1.55 0.42 0.4 0.33 0.28 1.4 2.6 Extend the Metromove, to 26 Road 1.24 0.14 0.4 0.22 0.28 -0.4 1.9 klew tunnel under the Miami River e W 1 Avenue 2.48 0.42 1 0 0.14 1 -0.3 3.7 Depress 1-95 and create a Grand Boulevard -0.31 0.14 0 -0.11 0 -0.5 1 -0.8 Appendix E Page E-5 12390 Miami Downtown Transportation Master i OPTIONS Transportation Social Economic Environmentalb Devement Investment TOTAL Goal Weights 31% 14% 20% 11% 14% 10% CBD AREA Develop the following roadways into pedestrian corridors 0.93 1.12 0.4 0.99 0.98 0.3 4.7 Miami Avenue - hum Miami River to N. 6 Street Biscayne Boulevard - from Biscayne Bhd. Way to N. 6 Street Fla ler Street - from 1-95 to Bayfront Park W. 2 Avenue - from Miami River to N 6 Street N. 5 Street - from NE 1 Avenue to Biscayne BMi. NE 2 Avenue - from NE 3 Street to NE 5 Street NE 3 Street - from NE / Avenue to NE 2 Avenue NE 1 Avenue - from NE 3 Street to NE 5 Street NE 2 Street - from NW 2 Avenue to Biscayne Boulevard S. 1 Street - from SW 2Awnue to Biscayne Boulevard N. 4 Street -from I-95 to Biscayne BIW. Miami River Greenway Action Plan for the north side of the Lower River 0.93 1.12 0.4 0.99 0.98 0.3 4.7 Pedestrian connectionsfrom Ba side to AA Arena 1.55 1.12 1.2 0.99 0.98 0.8 6.6 Improve bicycle routedfacilities 0.31 028 0 0.99 0.42 0.7 2.7 Improve transit amenities in the area 1.86 0.84 0.6 0.66 0.42 0.9 5.3 Extend Miami Beach light rail (Baylink) Into downtown 2.48 0.84 1.6 0.66 0.7 -0.1 6.2 Port Boulevard U -tum 1.55 0.14 0.4 -0.11 0.14 0.2 2.3 DDA Downtown Signage plan 1.24 0.56 0.8 0.11 0.14 0.6 3.5 Implement Fla ler Shuttle 0.62 0.42 0.6 0 0.7 0 2.3 Improve N 5 and 6 street for truck traffic 1.55 -0.28 0.8 0.22 0.42 0.8 3.5 Provide a 1-95 NB on-ramp at N 8 Street to provide access to WB SR 836 1.86 -0.42 0.8 0.11 -0.28 -0.2 1.9 Complete the Fla ler Street Corridor improvements 1.24 0.84 1 0.77 0.7 0.2 4.8 Provide tunnel from Seaport to Watson Island 1.55 0.28 1.4 0 0.56 -0.4 3.4 Two-way conversion in CBD 0.93 0.84 1.6 0.11 0.98 0.9 5.4 E 2 Avenue from Biscayne Boulevard Way to NE 6 Street Biscayne Boulevard Way from SE 2 Avenue to Biscayne Boulevard S 3 Street from SE 2 Avenue to Biscayne Boulevard S 2 Street from SE 2 Avenue to Biscayne Boulevard S 1 Street from W 2 Avenue to Biscayne Boulevard N 1 Street from W 3 Avenue to Biscayne Boulevard N 2 Street hon W 1 Avenue to Biscayne Boulevard N 3 Street from W 3 Avenue to Bisca m Boulevard E 3 Avenue from Biscayne Boulevard Way to NE 2 Street Biscayne Boulevard Iron SE 2 Street to Biscayne Boulevard Way S. Miami Avenue from Miami River to NE 6 Street E 1 Awnue from S 3 Street to NE 6 Street Connect other neighborhoods with Transit 1.55 0.98 1 0.55 0.7 0.5 5.3 W. 1 Avenue Corridor Extension Arena Boulevard 1.24 0.7 0.4 0 0.7 0 3.0 Provide a Transit Greenway 0.62 0.42 02 0.33 0.7 0 2.3 Re -align Metromover and add new station a DuPont Plaza 1.55 0.84 12 0.22 0.7 -0.1 4.4 ITS for Special Events 1.86 0.28 0.8 0.11 0.42 0.5 4.0 Create a Transit Free Fare Zone 2.79 0.98 1.6 0.66 0.84 0.7 7.6 Extend Fixed Guideway to AA Arena and Seaport 1.24 0.42 0.80.33 0.28 -0.4 2.7 Remove Distributor Ramps and provide a "Grand Boulevard" on S. 3 Street 0.62 0.28 0.6 0.11 1 1.26 -0.2 2.7 Depress 1-95 and create a Grand Boulevard -0.31 0.14 0 -0.11 0 -0.5 -0.8 Appendix E Page E-6 12390 Miami Downtown Transportation Maste, a OPTIONS Trans --:--tion Social Economic Environmental Development Investment TOTAL Goal Weights 31% 14% 20% 11% 14% 10% OMNVOVERTOWN/PARK WEST: AREA Develop the following roadways into pedestrian corridor 0.93 1.12 0.4 0.99 0.98 0.3 4.7 Miami Avenue - from N. 6 Street to N. 36 Street Biscayne Boulevard - from N. 6 Street to NW 36 Street W. 2 Avenue - from N. 20 Street to N. 36 Street W. 5 Avenue tram N 21 Street to N 36 Street N. 9 Street -from 1-95 to Biscayne Bhd. N. 11 Street - from 1-95 to Biscayne Shod. N. 13 Street - from 1-95 to Biscayne Bhd. N. 14 Street from 1-9511-395 Interchange to Biscayne BIW. N. 17 Street - from 1-95 to NE 2 Avenue N. 20 Street - from 1-95 to Biscayne Bhd. N. 29 Street - from 1-95 to Biscayne Bhd. N. 36 Street - from 1-95 to Biscayne BIW. E 2 Avenue - from 6 St. to NW 20 Street Provide a pdestri.. alkway along the Bay from Pace Park to Bayside 0.31 0.42 0.4 0.88 1.12 0.8 3.9 Improve pedestrian connections to Bicentennial Park 0.31 0.56 0.4 0.88 0.7 0.8 3.7 Improve bicycle routeaffacllitles 0.31 0.28 0 0.99 0.42 0.7 2.7 Realign 1-395 and Improve on/of ramps (based on FDOT plana) 0.93 -0.42 0.6 0 -0.14 -0.1 0.9 Two-way conversion in Omni/Overtown/l ark West 0.62 0.7 1.4 0.11 0.84 0.8 4.5 N 9 Street from N 2 Avenue to Biscayne Bbd. E 2 Avenue trom N 6 Street to NE 13 Street Miami Avenue from N 6 Street to NE 17 Street E 1 Avenue from N 6 Street to NE 17 Street NE Miami Court from NE 14 Street to NE 18 Street N 10 Street from NW 3 Avenue to Biscayne Bhd. N 11 Street from NW 3 Avenue to Biscayne Bhd. N 13 Street from Miami Avenue to NE 2 Avenue N 17 Street from Miami Avenue to NE 2 Avenue Complete Downtown Signage plan (from DDA) 0.93 0.56 0.6 0.11 0.14 0.5 2.8 Improv transit amenities in the are. 1.86 0.84 0.6 0.66 0.42 0.9 5.3 Biscayne Boulevard Improvements(FDOT Plan) 0 0 0 0 0 0 0.0 Biscayne Boulevard Improvements (City of Miami Plan) 1.24 0.7 0.6 0.22 0.98 0.1 3.8 W. 1 Avenue Corridor Extension 1.24 0.7 0.4 0 0.7 0 3.0 Improve N. 14 Street from 1-95 to Biscayne Blvd. 0 0.42 0.2 0 0.7 0.1 1.4 Connect other neighborhoods with Transit 1.55 0.98 1 0.55 0.7 0.5 5.3 Provide a shuttle system into Wymvood (NW 2 Avenue/ 36 Street/ Biscayne/ Omni) 1.24 0.42 0.4 0.11 0.42 0 2.6 Create a Transit Fre Fare Zone 2.79 0.98 1.6 0.66 0.84 0.7 7.6 Depress 1-395 from weal of WR to provide "Grand Boulevard' 0.62 0.42 0.6 0.11 1.12 -0.4 2.5 Extend Metromover into W mvood (N 2 Avenue/ 29 Street/ Biscayne/ Omni) 0.93 0.28 0.4 0.33 0.28 -0.3 1.9 Provide a new partial 1-95 Interchange at N 29 Street 0 0 0.2 0 0.28 -0.1 0.4 I-95INW 14 Street Interchange 0.31 0.14 0 0 0 -0.1 0.4 Depress 1-95 and create a Grand Boulevard -0.31 0.14 0 -0.11 0 -0.5 -0.8 Provide Commuter Rail to B-ard County 0.93 0 0.2 0.22 0.14 -0.1 1.4 Appendix E Page E-7 12390 Miami Downtown Transportation Maste, R Appendix F Abbreviations and Acronyms Appendix F Page F-1 12390 Miami Downtown Transportation Maste, i Abbreviations and Acronyms AA American Airlines AADT Average Annual Daily Traffic AASHTO American Association of State Highway and Transportation Officials ADA Americans with Disabilities Act AGT Automated Guideway Transit AGV Automated Guideway Vehicles AM Ante Meridian APTS Advanced Public Transportation System ATMS Advanced Traffic Management System Ave Avenue Avg Average Blvd Boulevard BMP Best Management Practice CA California CAC Citizen Advisory Committee CBD Central Business District CCTV Closed Circuit Television CD Collector Distributor CMS Congestion Management System CO Colorado Cswy Causeway Ct Court DART Dallas Area Rapid Transit DDA Downtown Development Authority DPA David Plummer and Associates DTF Downtown Task Force E East EB Eastbound ECC Evaluation Criteria Committee FDOT Florida Department of Transportation FHWA Florida Highway Administration FIU Florida International University FL Florida FS Florida Statutes Appendix F Page F-2 12390 Miami Downtown Transportation Maste. n FSUTMS Florida Standard Urban Transportation Model Structure FY Future Year HAR Highway Advisory Radio I Interstate ITS Intelligent Transportation System LCE Leftwich Consulting Engineers LOS Level of Service LRTP Long Range Transportation Plan MD Midday MDCC Miami Dade Community College MDTMP Miami Downtown Transportation Master Plan MDX Miami -Dade Expressway Authority MDT Miami -Dade Transit MI Michigan MIA Miami International Airport MPO Metropolitan Planning Organization MUATS Miami Urban Area Transportation Study N North NB Northbound NE North East NW North West PD&E Project Development and Environment PM Post Meridian PSWADT Peak Season Weekday Average Daily Traffic Rd Road R/R Railroad R/W Right-of-way S South SB Southbound SE South East SR State Road SW South West St Street Appendix F Page F-3 12390 Miami Downtown Transportation Maste, R TAZ Traffic Analysis Zone TEA -21 Transportation Equity Act for the 21" Century TEC Technical Evaluation Committee TDM Transportation Demand Management Terr Terrace TIP Transportation Improvement Program TLOS Transit Level of Service TN Tennessee TSM Transportation System Management TV Television TX Texas UA Urbanized Area USDOT United State Department of Transportation v/c volume to capacity vph vehicles per hour W West WB Westbound Appendix F Page F-4 16390 ITEM PZ 9 SECOND READING PLANNING FACT SHEET APPLICANT Ben Fernandez, Esquire, for Florida Union Land Corporation and Sime Corporation HEARING DATE November 20, 2002 REQUESTILOCAT16N Approximately 536, 602, 608 and 690 NW 57'" Avenue and 601, 605, 611, 631 and 641 NW 57th Court LEGAL DESCRIPTION Complete legal description on file with Department of Hearing Boards. PETITION Consideration of amending Ordinance No. 10544, as amended, the Future Land Use Map of the Miami Comprehensive Neighborhood Plan by changing the future land use designation for the properties at approximately 536, 602, 608 and 690 NW 574' Avenue and 601, 605, 611, 631 and 641 NW 57th Court from "Single Family Residential" and "General Commercial" to "Restricted Commercial". PLANNING RECOMMENDATION Denial. BACKGROUND AND ANALYSIS See supporting documentation. PLANNING ADVISORY BOARD Recommended approval with VOTE: 6-2 conditions to City Commission. CITY COMMISSION Denied First Reading on January 23, 2003. Reconsidered by motion 03-151 on February 13, 2003. Continued from City Commission of March 27, 2003. Passed First Reading on May 22, 2003. APPLICATION NUMBER 02-079 Item #1 CITY OF MIAMI - PLANNING AND ZONING DEPARTMENT 444 SW 2ND AVENUE, 3RD FLOOR • MIAMI, FLORIDA, 33130 PHONE (305) 416-1400 Date: 6/11/2003 12349(+ ANALYSIS FOR LAND USE CHANGE REOUEST Approximately 536, 602, 608 and 690 NW 57th Avenue and 601, 605, 611, 631 and 641 NW 57th Court. Auplication No. LU- 2002-0037 DISCUSSION The proposal has been reviewed for a change to the Future Land Use Map of the Miami Comprehensive Neighborhood. Plan '1989-2000 from "Single Family Residential" and "General Commercial" to "Restricted Commercial". The subject property consists of a parcel comprised of several lots facing NW 57th Avenue and a parcel comprised of several lots facing NW 57`h Court. (Complete legal description on file at the Hearing Boards Office). Miami Comprehensive Neighborhood Plan (MCNP) Land Use Policy 1.6.1., established future land use categories according to the Future Land Use Plan Map and the. "Interpretation of the Future Land Use Plan Map". The subject property is currently comprised of two parts, one facing NW 57th Court designated "Single Family Residential" and the other facing NW 57h Avenue designated "General Commercial". To the east, the area is designated "General Commercial"; to the south, the area is designated "General Commercial" and "Single Family Residential"; to the west, the designation is "Single Family Residential"; and to the north, there is a "Restricted Commercial" land use designation. "Single Family Residential": Areas designated as "Single Family Residential' allow single family structures of one dwelling unit each to a maximum density of 9 dwelling units per acre, subject to the detailed provisions of the applicable land development regulations and the maintenance of required levels of service for facilities and services included in the City's adopted concurrency management requirements. Supporting services such as foster homes and family day care homes for children and/or adults; and community based residential facilities2 (6 clients or less, not including drug, alcohol or correctional rehabilitation facilities also will be allowed pursuant to applicable 12390 state law. Places of worship, primary and secondary schools, child day care centers and adult day care centers are permissible in suitable locations within single family residential areas. Professional offices, tourist and guest homes, museums, and private clubs or lodges are allowed only in contributing structures within historic sites or historic districts that have been designated by the Historical and Environmental Preservation Board and are in suit- able locations within single family residential areas, pursuant to applicable land develop- ment regulations and the maintenance of required levels of service for such uses. Density and intensity limitations for said uses shall be restricted to those of the contributing struc- ture(s). "Restricted Commercial": Areas designated as "Restricted Commercial" allow residen- tial uses (excepting rescue missions) to a maximum density equivalent to "High Density Multifamily Residential" subject to the same limiting conditions; any activity included in the "Office" designation as well as commercial activities that generally serve the daily retailing and service needs of the public, typically requiring easy access by personal auto, and often located along arterial or collector roadways, which include: general retailing, personal and professional services, real estate, banking and other financial services, res- taurants, saloons and cafes, general entertainment facilities, private clubs and recreation facilities, major sports and exhibition or entertainment facilities and other commercial activities whose scale and land use impacts are similar in nature to those uses described above, places of worship, and primary and secondary schools. This category also includes commercial marinas and living quarters on vessels as permissible. "General Commercial": Areas designated as "General Commercial" allow all activities included in the "Office" and the "Restricted Commercial" designations, as well as whole- saling and distribution activities that generally serve the needs of other businesses; gener- ally require on and off loading facilities; and benefit from close proximity to industrial areas. These commercial activities include retailing of second hand items, automotive re- pair services, new and used vehicle sales, parking lots and garages, heavy equipment sales and service, building material sales and storage, wholesaling, warehousing, distribution and transport related services, light manufacturing and assembly and other activities whose scale of operation and land use impacts are similar to those uses described above. Multifamily residential structures of a density equal to R-3 or higher, but not to exceed a maximum of 150 units per acre, are allowed by Special Exception only, upon finding that the proposed site's proximity to other residentially zoned property makes it a logical extension or continuation of existing residential development and that adequate services and amenities exist in the adjacent area to accommodate the needs of potential residents. This category also allows commercial marinas and living quarters on vessels for tran- sients. 2 12390 The Planning and Zoning Department is recommending DENIAL of the application as presented based on the following findings: • It is found that the current designation of the east part of the subject property is "General Commercial". • It is found that a change to "Restricted Commercial" could be a logical extension of the designation immediately north and it is also found that the change could be beneficial to the area in providing development of commercial activities that serve the daily retailing and service needs of the public especially if it is located along 57h Avenue, a major arterial roadway. • It is found that the current designation of the west part of the subject property is "Single Family Residential" and is facing NW 57" Court. • It is found that the character of NW 57th Court is residential. • It is found that a change in the designation will represent a commercial intrusion into a stable residential neighborhood. • It is found that MCNP Goal LU -1. which require the City to maintain a land use pattern that protects and enhances the quality of life in the city's residential neighborhoods and, Objective LU -1.3 requires the City to encourage commercial development within existing commercial areas. These findings support the position that the existing land use pattern in this neighborhood should not be changed. It also should be stated, that whereas MCNP Land Use Policy 1.1.1. requires development or redevelopment, that results in an increase in density or intensity of land use, to be contingent upon availability of public facilities and services that meet or exceed the minimum LOS standards adopted in the Capital Improvement Element (CIE) (CIE Policy 1.2.3.). It is found that the attached Concurrency Management Analysis pertaining to concurrency demonstrates that no levels of service would be reduced below minimum levels. 12390 Proposal No. 02-37 Date: 11/12/02 CONCURRENCY MANAGEMENT ANALYSIS CITY OF MIAMI PLANNING DEPARTMENT IMPACT OF PROPOSED AMENDMENT TO LAND USE MAP WITHIN A TRANSPORTATION CORRIDOR AMENDMENT INFORMATION CONCURRENCY ANALYSIS Applicant: Ben Fernandez RECREATION AND OPEN SPACE Address: 536, 602-06, S 690 NW 57 Avenue; Population Increment, Residents 516 601, 605, 611, 631, & 641 NW 57 Court Boundary Streets: North: NW 7 Street East NW 57 Avenue Space Requirement, acres Excess Capacity Before Change 0.67 18280 South: West NW 57 Court Excess Capacity After Change 182.13 Proposed Change: From: Single Family Residential & General Comme ' 1 Concurrency Checkoff OK To: Restricted Commercial Existing Designation, Maximum Land Use Intensity POTABLE WATER TRANSMISSION S.F. Residential 0.54 acres @ 9 DU/acre 5 DUs Population' Increment, Residents 516 Peak Hour Person -Trip Generation, Residential 7 Transmission Requirement, gpd 115,575 General Commercial 0.83 acres Excess Capacity Before Charge >2% above demand Peak Hour Person -Trip Generation, Other 10 Excess Capacity After Change >2% above demand Concurrency Checkoff OK Proposed Designation, Maximum Land Use Intensity Residential 1.37 acres @ 150 DU/acre 206 DUs SANITARY SEWER TRANSMISSION Peak Hour Person -Trip Generation, Residential 103 Population Increment, Residents 516 Other sq.fL@ 0 FAR 0 sq.fL Transmission Requirement, gpd 95,453 Peak Hour Person -Trip Generation, Other 0 Excess Capacity Before Charge See Note 1. Excess Capacity After Change See Note 1. Net Increment With Proposed Change: Concurrency Checkoff WASA Permit Required Population 516 Dwelling Units 201 STORM SEWER CAPACITY Peak Hour Person -Trips 86 Exfiltration System Before Change On-site Exfiltration System After Change On-site Planning District Flagami Concurrency Checkoff OK County Wastewater Collection Zone 315 Drainage Subcatchment Basin M1 SOLID WASTE COLLECTION Solid Waste Collection Route 31 Population Increment, Residents 516 Transportation Corridor Name Flagler Solid Waste Generation, tonslyear 660 Excess Capacity Before Change 800 RELEVANT MCNP GOALS, OBJECTIVES, AND POLICIES Excess Capacity After Charge 140 Concurrency Checkoff OK Land Use Policy 1.1.1 CIE Policy 1.2.3 TRAFFIC CIRCULATION Population Increment, Residents 516 Peak -Hour Person -Trip Generation 86 LOS Before Change D LOS After Change D Concurrency Checkoff OK NOTES 1. Permit for sanitary sewer connection must be issued by Metro -Dade Water and Sewer Authority Department WASA). Excess capacity, if any, is currently not known CM_1 IN 0311 ASSUMPTIONS AND COMMENTS Population ir=wnent is assumed to be all now residuft Peak -period trip generation is based on ITE Trip Generation, 5th Edition at 1.4 ppv average occupancy for private passenger vehichm Transportation Corridor capacities and LOS aro from Table PT 2(R1). Transportation Corridors report Potable water and wastewater bansmisdon apadties aro in accordance with Meho Dade County stated capacities and aro assumed eared Service connections to water and sewer me'rrs aro assumed to be of adequate size: if not new connections aro to be metaled at ownees wepense. ReaeetioNOpen Space acreage requi arne to aro assumed with proposed change made. O Q O O w w NW7S 5 ST 12390 et► 4► ..A _ � �_, 4* .t,.' ^' � 'k• b s 4«i�.�+ �'! Y tea.. ;. . ..._, } � w � " +� Sir, �„� ,�p:�t..a-;. ��� v�� _ 'u ,i�hat ,.. „- .�„^:�u' .r , . � a•+',-. ASH' -. `?4� .. ,•�-. I�. � 7�-.e j � t u v. ' . e �y S` ..- � ii RESOLUTION PAB - 82-02 A RESOLUTION RECOMMENDING APPROVAL WITH CONDITIONS OF A CONSIDERATION OF AMENDING ORDINANCE 10544, AS AMENDED, THE MIAMI COMPREHENSIVE NEIGHBORHOOD PLAN, BY AMENDING THE FUTURE LAND USE MAP, BY CHANGING THE LAND USE DESIGNATION FOR THE PROPERTIES LOCATED AT APPROXIMATELY 536, 602, 608 AND 690 NORTHWEST 57TH AVENUE AND 601, 605, 611, 631 AND 641 NORTHWEST 57TH COURT, MIAMI, FLORIDA, FROM "SINGLE FAMILY RESIDENTIAL" AND "GENERAL COMMERCIAL" TO "RESTRICTED COMMERCIAL". HEARING DATE: November 20, 2002 ITEM NO.: 1 VOTE: 6-2 ATTEST: _ -fflkx4z AP -1 Ar&WfabeOdnchef, Director Planning andZoning Department 12390 MOTION PAB - 01-02 A MOTION OF THE PLANNING ADVISORY BOARD REGARDING AN APPLICATION FOR LAND USE CHANGE FOR THE PROPERTIES LOCATED AT APPROXIMATELY 536, 602, 608 AND 690 NORTHWEST 5711-f AVENUE AND 601, 605, 611, 631 AND 641 NORTHWEST 57TH COURT, MIAMI, FLORIDA, IN ORDER TO RECOMMEND TO THE CITY COMMISSION THAT IF THEY WERE TO SO ACCEPT THE VOLUNTARILY PROFFERED COVENANT AS PART OF THE COMPANION ZONING CHANGE TO THIS ITEM, THAT SUCH A COVENANT SHOULD ADDRESS THE FOLLOWING ISSUES: DESIGN REVIEW AND LANDSCAPE BUFFER. HEARING DATE: November 20, 2002 ITEM NO.: 1 VOTE: 8-0 ATTES a Gelabert-Sanc ez it ctor Planning and Zoning Department Sent By: Bercow & Radell; 305 377 8228; Nov -7-02 2:24PM; PLANNING AND ZONING DEPARTMENT HEARING BOARDS DIVISION 444 SW rd Avenue, r Floor • Miami, Florida 33130 Telephone 305.416-1480 • Fax 305416-2035 APPLICATION TO AMEND THE MIAMI COMPREHENSIVE NEIGHBORHOOt) PLAN Page 2/ Jv ,Ltd ANY PERSON WHO RECEP40 COMPENSATION, REMUNERATION OR EXPENSES FOR CONDUCTING LOBBYING ACTIVITIES TO REGISTER AS A LOBBYIST WITH THE CITY CLERK, PRIOR TO ENGAGING IN LOBBYING ACTIVITIES BEFORE CITY STAFF, BOARDS, COMMITTEES AND THE CITY COMMISSION. A COPY OF SAID ORDINANCE IS AVAILABLE IN THE OFFICE OF THE CRY CLERK (MIAMI CITY HALL), LOCATED AT 3500 PAN AMERICAN DRNE, MIAMI, FLORIDA. 33133. APPLICANTS ARE RESPONSIBLE, IF NEEDED. TO BRING AN INTERPRETER FOR THE ENGLISH LANGUAGE TO ANY PRESENTATION BEFORE CITY BOARDS, COMMITTEES AND THE CRY COMMISSION. POWER OF ATTORNEY WILL BE REQUIRED IF NEITHER APPLICANT OR L.EG& COUNSEL REPRESENTING THE APPLICANT EXECUTE THE APPLICATION OR DESIRE TO MAKE A PRESENTATION BEFORE CITY BOARDS, COMMITTEES AND THE CITY COMMISSION. THIS APPLICATION MUST OF TYPEWRITTEN AND SIGNED IN BLACK INK IT WILL BE ACCEPTED BY THIS DIVISION ONLY THE FIRST SEVEN (7) DAYS OF THE MONTH FROM 8:00 AM UNTIL 3:50 PM. 1. Section 62-32 of the Code of the City of Miami, periodic review of the adopted comprehensive pian and adoption of evaluation and appraisal report reads as follows: (a) Periodically, but not less often than once in five years or more often than once in two years, the comprehensive plan shall be reviewed, evaluated and appraised by the planning advisory board to determine whether changes in the amount, kind or direction of development and growth of the city or area thereof, or other reasons, make it necessary or beneficial to make additions or amendments to the comprehensive plan. The Planning and Zoning Department shall prepare an evaluation and appraisal report for the planning advisory board which shall evaluate the comprehensive plan pertaining to the major problems of development. physical deterioration and the location of land uses and the social and economic affects of such uses; the status of each element of the comprehensive plan; the objectives of the comprehensive plan compared to actual results and the extent to which unanticipated and unforeseen problems and opportunities occurred; all as compared between the date of adoption and the date of the report. The report shaft suggest that changes needed to update the comprehensive plan inclilding reformulated objectives, policies and standards. w (b) The planing advisory board may recommend the report as presented, modify the report or reject the report in duly noticed public hearing pursuant to the procedures in Section 62-31. (c) The city commission shall adopt, or adopt with changes, the report or portions thereof by resolution in public hearing within 80 days after the planning advisory board date of recommendation. The city commission shall thereafter amend the comprehensive pian based on the recommendation in the evaluation and appraisal report. Adoption of the Ray. 06104= 1239 Sent By: Bercow &.Radell; 305 377 8228; Nov -7-02 2:24PY; Page 313 report and recommended emendmW6 to the pian may be made sirrnuitarwousty pursuant to section 62-31 or If not simultaneous, the evaluation and appraisal report Mall contain a schedule for adoption of the r000mmerded amendments within one year. See also Article 22 of the Zoning Ordinance. 2. Two 11x17' original currant surveys, prepared by a State of Florida Registered Land Surveyor within six months from the date of application. 3. An 8 'A x11' copy of all exhibits that wig be presented at the hearing shag be attached to this application. 4. Affidavit and disclosure of ownership of su *ct property and disclosure of interest (see attached form). 5. Complete application should be reviewed and initialed by Planning and Zoning desrgnae prior to submittal. 6. Cost of processing, according to the City Code: Conservation, recreation, residential single-family duplex Residential medium density multifamily Residential high-density muf iif imily, office; major public facilities, transportation/uNies Commer ialfre , commercial/general and industrial Commercial (CBD) Surcharge for advertising each item Public hearing and public meeting mag notice fees, including cost of handling and mailing per notice 7. This petition is proposed by: ( ) Planning and Zoning Department (X) Other (please specify): Ower 8. The subject property is located at: 57 Court. $ 300.00 S 450.00 $ 550.00 $ 650.00 $1,200.00 $1,200.00 $ 3.50 Folio number 01-4001-003060. 01-4001-003-3042, 01-4001.00341, 01-4001 . X40, 01-4001-0034030 01400143-2M0 014001-003-2900 01-4001-003-2910 01- 4001-003-2920.01-4001-003-2921.01:4001-0001-2922. AND MORE PARTICULARLY DESCRIBED AS: RM. OWGWM 2 123 9. The undersigned being the owner or the representative of the owner, of the subject property do(es) respectfully request the approval of the City of Miami for the following amendments) to the Miami Comprehensive Neighborhood Plan for the above-described property as indicated in the Land Use Plan: FROM: Single -Family Residential and General Commercial TO: Restricted Commercial 10. Please supply a statement indicating why you think the existing plan designation is inappropriate: The existing General Commercial land use designation is not as compatible with the surrounding area as the Restricted Commercial land use designation. 11. Please supply a statement justifying your request to change the plan to your requested plan designation. Re -designation of the property to restricted Commercial will allow the aoDlicant to provide neighborhood -serving retail services to the area. 12. What is the acreage of the property being requested for a change in plan designation? 1.3706 acres 13. Has the designation of this property been changed in the last year? No. 14. Do you own any other property within 200 feet of the subject property? No. If yes, has this other property been granted a change in plan designation within ' the last twelve months? ' 15. Have you made a companion application for a change of zoning for the subject property with the Hearing Boards Division? Yes. 4 16. Have you filed with the Hearing Boards Division a(n): • Owner's list form? Yes. • Affidavit of ownership? Yes. • Disclosure of ownership form? Yes. • List of owners of property within 500 feet of the subject property? Yes. If not, please supply them. Rev. 06/04102 3 v 17. Is the property within the boundaries of a historic site, historic district or archeological zone designated pursuant to Chapter 23 of the Miami City Code? No. 18. Is the property ...thin the boundaries of an Environmental Preservation District designated pursuant to Chapter 17 of the Miami City Code? No. 19. What is the purpose of this amendment? To allow the development of an Eckerd Pharmacy on the prooert- Rev. 06/04/02 Signature Name gh: Telephone Aff2- " 37742 35 Date 4 10--7 - 02 1.2390 STATE OF FLORIDA COUNTY OF MIAMI-DADE The foregoing -by was acknowledged before me this l day of ak&r ,ncr>7die2 who is an individual o rr r who has produced _ who did (did not) take an oath. (Stamp av _M UIFENA OWMASSome# ODaWW WV": FW,wy 27.2W *ap"OTAW Roo Nr So" a earrq STATE OF FLORIDA COUNTY OF MIAMI-DADE as The foregoing instrument was acknowledged before me this day of 20 , by of a corporation, on behalf of the corporation. He/She is personally known to me or has produced as identification and who did (did not) take an oath. (Stamp) STATE OF FLORIDA COUNTY OF MIAMI-DADE Signature The foregoing instrument was acknowledged before me this day of 20 , by .,,partner (or agent) on behalf of %. , a partnership. He/She is personally known to me or who has produced as identification and who did (did not) take an oath. (Stamp) Signature Rev. 06/04/02 5 12390 AFFIDAVIT Before me, the undersigned authority, this day personally appeared Ben Femandez Esq, who being by me first deposes and says: 1. That he/she is the owner, or the,,leal representatty of the owner, submitting the accompanying application for a public hearing as required by the Code of the City of Miami, Florida, affecting the real property located in the City of Miami, as described and listed on the foregoing pages of this affidavit and made a part thereof. 2. That all owners which he/she represents, if any; have given their full and complete permission for him/her to act in his/her behalf for the change or modification of a classification or regulation of zoning as set out in the accompanying petition, ❑ including responding to day to day staff inquires; ❑ not including responding to day to day staff inquiries in which case he/she should be contacted at 305-377-6235. 3. That the foregoing pages are made a part of this affidavit contain the current names, mailing addresses, telephone numbers and legal descriptions for the real property of which he/she is the owner or legal representative. 4. The facts as represented in the application and documents submitted in conjunction with this affidavit are true and correct. Further Affiant sayeth not. Applicant Name STATE OF FLORIDA COUNTY OF MIAMI-DADE plicant Signat e v 4 The foregoing instrument was acknowledged before me 2002, by Ben Fernandez, Esq. who is an individual rsonall produced as identifi n a an oath. // /, (Stamp) BETTY LLERENA MY COMMISSION # DOOY'. " EMRES: FabnWY 27.20M Rev. 12/0 (b day of October m to r who has ho did (did not) take 12390 DISCLOSURE OF OWNERSHIP 1. Legal description and street address of subject real property: Sime Cor;,orauon , see attached Exhibit "A". Florida Union Land Corporation, see a Cached Exhibit "B". 2. Owner(s) of subject real property and percentage of ownership. Note: The Code of the City of Miami requires disclosure of all parties having a financial interest, either direct or indirect, in the subject matter of a presentation, request or petition to the City Commission. Accordingly, question #2 requires disclosure of shareholders of corporations, beneficiaries of trusts, and/or any other interested parties, together with their addresses and proportionate interest. Sime Corporation Florida Union Land Corporation Scott K. Sime 50% Ronald B. Picchi 33.33% Belinda S. Sims 50% Eugune Picci 33.33% Biaize Picci 33.33% 3. Legal description and street address of any real property (a) owned by any party listed in answer to question #2, and (b) located within 500 feet of the subject real property. I .J --- Owner or Attorney for Owner Name Owner or Attorney for r Signature STATE OF FLORIDA COUNTY OF MIAMI-DADE The foregoing instrument was acknowledged before me thi (();6b day of October 2002, by Ben Fernandez, Esq. who is an individual ersonall known tom r who has produced as identification and who did (did not) take an oath. _ A v (Stamp) FkBETTY UMIENA )MyOMMISSM 0 DD 0�7 PIRES: FabnMy 27.2006 FL Nagy SK M a eo,6rp rx Rev. 12/05/01 w The North 1/2 of Lot 2 all pf Late 24 and 26, less the East 6' of all Lass. Block 17, of WEST FLAOLER PARK, cg0►ding to the plat th9reol, recorded In Plait Sock 8; Page 8o, of tho Public Rom rd4 of D d8 �ounty. Florida. 4 12390 I w Legal Description: Lots 1,, 2, 3, 4, 5, 6, North 20 feet of Lot 7, Lots 26, 27, 28, 29, and 301-6w ' nl , ' West Flagler Park Subdivision, according to the Plat thereof recorded in Plat Book 8, Page 96 of the Public Records of Dade County, Florida. ' 9 12390 t NsnNti A ahnn, mss- .....,..,,. AdarNa to 9ozi mi (8t>.a rea,v d far Cwh of Cavrtl Yro�sey Apyt:aiear's pa_ ei 93r%*402832 1993 AUG 13 15:;: GriMF',► E IP714.00 SURTX U287.V, •1 . - }!4My PiiJT1h CLEM WE COiINTYi FL WARRANTY 0650 THlff OEED is tttad0 ae� of gle ,,, + _ daY sit August.�,�t�, between SAN0fV B. N, a Married woman (the 40rantor) �vhoe! addreea b 5 y ' w • : GQ to T.P ('r l arw d,K 81ME CORP., a Fl4ddajcotpontion (the'GrArdae' whose taxpayer Idan0cadon number Is and whose addreles.U•80B Luengs Avenue. Cord GaMise, Florld4l 3314& 1, WITHISSITH: GRANT0R, In acmWim ion of Ton ($10.00) Oollare and other good and valuable oonsWerauon rAI11 by Grantee, lila rectot and etdll of which are bereW ttoknowledged, has granted. bargdned and sold. end by :hese presents does atombarbakt and eel, to Grantee, and Grantea's helm, successors and assigns forever, the following property M, t In Dodo Courcy, igorlda (the'Isropedy). Ww* The North 1/9 *01 Lot AO Qt Lata 24 and 25, less the East $' of All LOW Block 17, of WEST l:t,AGLEA PARK. gordlnp to the Plat dwreol. recorded in Plat Sack S. Page t&0. of tho Pubwk peeordo of di dounly. FlorWA. 1. Taxes and assn 7. All laws, ord by Owe"" ' 9 EAAan+ente, . soma. HAVv ANO TO . 9J1?• 40ANT0R '+araby wa !W rs Of ss persons *ftwol GRDtd"{OM reprasonh rr Are -tor nor Is the Property IN WITNESS WN9481 : ;iod sealed and delivered in the presence of: h STATI OPiSM111i- =1 ! , ' COUNTY 01141M COQ is The •foreqQu�ng4tatruntwl t SAiNhRA & DAU(1N. fiho la Aar oath. i and dld take an *ANN M�NC_a&*"./ .29 SIP "MrMW19 i aucocun a W Commission gxptmr My t� � i .+NrMMhN.W.INM,A I ��. , '39tld �8i+9tt1�8Z'OH SZ tb1 for do year NI03 And aubwpusnt yea*._ i, rogldations, mtridlons, proMbillcns And other requlremsnts imposed and reeemtlone of fecvrd, *Wmut the Intention of reimposing yeti Grantee and chant"'& hairs, auaceseor* and aa*Ipns In res simple slip the 1100 to the Property and will defend the same against the lawful the ss that lomparty is not naw nor has R sear been the homostsed >tip ' wto the homestead of Qnuttor. GjfMtor has exaouted this Deed as of the day end year first above wflh*n. { iVima: SANDRA M DAMN Addroir It a 99: wetaoknow,wJged before me this ' -tJa of / cs1STtliikt, by mally known to me or has produced�as IdentmesIllon oroeasesa°s r► . ;min= o. State OfJla.�rst.t.t No �� ' NO.. Notarial 8aaq - OFFICrAL SEAL JANE SCARAVILLI NOTAP.Y PtlEl!t STATE OF Mr COMMISSION ExP1fE V$4 QQsEt l:E� t li$i! �f eti�Ll • d Pse^P3 �Q'�" ' X2390 0ojj6 or aerwit w a nauai avo 411 0440; UCt-2�-U2 lf:00PM� .. Aloe ran.. %1t4T 9% ret n-004-2002-1607302-19cM447-L 6 iiAifittlt A01 c n-03-166192-2 10/02/2002 11:61supm Paga 1 o:'1 `f`rw�i'Amp NOW la4n' ces, amp NOW A~ Plow a SAM1 ��LTT.A. t ' ri-1316 3ostudw Ord dt'da1IP tart Laaardats. rlovi" 33310 � COMMIT $2 4AR034bR! t1ff FEB Q3 =41 sL.tds ttoCdt. D.A. } UT Ie slates Ploolsi, 104tranet IdM'6i • a< o1Lt 03wrt. a•_ ,n,w0Amosr.0010Q�•i'JO IS wu W41*Abo a ,•t.rw as N* ellotdallY pit na tateuw ata aM0 �w tN •K N1 R.'R! V sac 1�tr �tpt• thr0. Ammut t 10 40 it . n.n W is bA03d fiCU' I. a eiyls woman. Stu bmtb sst !rd Are., last PW soft data. Fiat" SIM TIMMs MICIN 1 m MUMATl03, a RW14a t>ossosetton. sbas Doti dW Wb w it 1110t 0oodstt LSM. 3tsa taloa, R 33dsi #EWA >"Mr /tiMi�.•_M�aMNt t'r► Iti/Mf4f '`" aalail�ai, dwa°�a3.ai uodpm� .. an 1wrw lma {.�..� 44 P.��i iV tiaAd al S" DA .�YM��N.�• INS. � T'7 i� �•.'7 dA M. Cites . S" 4ff i W.MW Lars 38, 37, so, 30, and 30 cad tie Vast 60.40 swat of Lots 1, Q, S. Red 4, all ie !lock 11 ok rsb? iLA A sdsr, aseerdtar to ttr Plat tbonat as r4otr4ed id Piatbeok a at lap a of %he nu I& 20=ra of Daae Cm+aq, ilefids, r�.i'. Tie swath 30 tint, lama xho Usm. a fact at Let 23 is AWS 17us of cSIX ts6T 1.&= 1616, asoord!ag o tlh as daises rsesrdtd to Plat- I! Look s at PW a of 0.0 P0bIle antaMa of ON& Cessq. noridai •110 a INFUU7 eowdsration has wwAsapd huAm berefors. this dead revwaeis a traaatnr of sxLis otti7. A<s est t33 tt �aD tht.�..>;q.a►rer.larar+yrr.ati.�u...ro. i4+ie.afoi.•kfaaQ Kdtplai. ansahifMspeta �c�+w�cL.at:a..i.1�i..r.b.a.QtlJrml ,t�e,.+t � etai4, rs w � s�Mu' � tn+Et ar M+ey�Na.w honer warpr Artrit: 3A � ��traAl. 7�.,arra►sr�ar�tare�rid,rr.er�r+rrr'r- ae�r�►�e�,�r dw trraaa. u t rawer a0 : , t t.✓ !-s C.'r awsvarr q t�Ahlad ricats . arersrwaaur 'mow 0 .. 27r. W �. 1 /t91Tr P►1�.O11iDt 1 t1.Yf6wls.M wlr.. ln�Ll an,.ct.•�••M.4aa'•iPvi i �vrxi'ror /R/�iw���. . s1�YY+Har r1+.•..w4.-►r�uKt�.`�l.r, rr.a 1 LAt'M PiCCsI .•-+��.a1►IL'Yn�, ,,i►MiI. •�wlolu tM!1111J1.►Uwf Yla�w..►�Mu^►.riJpawir s. •n also .. iw..•. u. i..t►K.!!ar an. ar+�.ttan/arv• Nu .pM• j�Vi �a j.i.:JC�•sr_s.�>' 1-/•tf/ a .ra......M.at»r-•.a..w,. � ..� T.��+w .e,•i1 LZ4 1.,,•A serf � �Z{/ _•AO W r -M w FORM 813 MEMORANDUM OF VOTING CONFLICT COUNTY, MUNICIPAL, AND OTHER LOCAL PUBLIC OFFICERS LAS�`'AME—FIRST J�AME—MIDDLE NAME NAME OF BOARD. COUNCIL. WMMISSION. AUTHORITY. OR COMMITTEE t� v �, z `e z 4 ti a' -t-ZZ MAILING ADDRESS THE BOARD. COUNCIL. COMMISSION. AUTHORITY OR COMMITTEE ON DA WHICH I SERVE IS A UNIT OF. Ave COUNTY X CITY :1 COUNTY :1 OTHER LOCAL AGENCY CITY NAME OF POLITX�� 77LLAG SUBDIVISION: DATE ON WHICH VOTE OILED [A/ MY POSITION IS: ELECTIVE 7 APPOINTIVE q -V L v 17 WHO MUST FILE FORM 813 This form is for use by any person serving at the county, city, or other local level of government on an appointed or elected board, council, commission, authority, or committee. It applies equally to members of advisory and non -advisory bodies who are presented with a voting conflict of interest under Section 112.3143, Florida Statutes. Your responsibilities under the law when faced with voting on a measure in which you have a conflict of interest will vary greatly depending on whether you hold an elective or appointive position. For this reason, .please pay close attention to the instructions on this form before completing the reverse side and filing the form. INSTRUCTIONS FOR COMPLIANCE WITH SECTION 112.3143, FLORIDA STATUTES A person holding elective or appointive county, municipal, or other local public office MUST ABSTAIN from voting on a measure which inures to his or her special private gain or loss. Each elected or appointed local officer also is prohibited from knowingly voting on a mea- sure which inures to the special gain or loss of a principal (other than a government agency) by whom he or she is retained (including the parent organization or subsidiary of a corporate principal by which he or she is retained); to the special private gain or loss of a relative; or to the special private gain or loss of a business associate. Commissioners of community redevelopment agencies under Sec. 163.356 or 163.357, F.S., and officers of independent special tax districts elected on a one -acre, one -vote basis are not prohibited from voting in that capacity. For purposes of this law, a 'relative" includes only the officer's father, mother, son, daughter, husband, wife, brother, sister, father-in-law, mother-in-law, son-in-law, and daughter-in-law. A "business associate" means any person or entity engaged in or carrying on a business enterprise with the officer as a partner, joint venturer, coowner of property, or corporate shareholder (where the shales of the corporation are not listed on any national or regional stock exchange). o n � w . . ELECTED OFFICERS:�� In addition to abstaining from voting in the situations described above, you must disclose the conflict: �+ J ; pi PRIOR TO THE VOTE BEING TAKEN b y publicly stating to the assembly the nature of your interest in VPT4eesuWn w*h you are abstaining from voting; and :r73— Z 1 WITHIN 15 DAYS AFTER THE VOTE OCCURS by completing and filing this form with the person responloie f®r reving the min- utes of the meeting, who should incorporate the form in the minutes. O C) cn X APPOINTED OFFICERS: Although you must abstain from voting in the situations described above, you otherwise may participate in these matters. However, you must disclose the nature of the conflict before making any attempt to influence the decision, whether orally or in writing and whether made by you or at your direction. IF YOU INTEND TO MAKE ANY ATTEMPT TO INFLUENCE THE DECISION PRIOR TO THE MEETING AT WHICH THE VOTE WILL BE TAKEN: • You must complete and file this form (before making any attempt to influence the decision) with the person responsible for recording the minutes of the meeting, who will incorporate the form in the minutes. (Continued on other side) CE FORM 8B - EFF. 112000 PAGE 1 R-2-- =gdtA . la 39 c, r'2- C I a 39 1 APPOINTED OFFICERS (continued) • A copy of the form must be provided immediately to the other members of the agency. • The form must be read publicly at tfle next meeting after the form is filed. IF YOU MAKE NO ATTEMPT TO INFLUENCE THE DECISION EXCEPT BY DISCUSSION AT THE MEETING: i • You must disclose orally the nature of your conflict in the measure before participating. • You must complete the form and file it within 15 days after the vote occurs with the person responsible for recording the minutes of the meeting, who must incorporate the form in the minutes. A copy of the form must be provided immediately to the otner members of the agency, and the form must be read publicly at the next meeting after the form is filed. DISCLOSURE OF LOCAL OFFICER'S INYEREST hereby disclose that on f al A measure came or will come be a my agency which (check one) __ inured to my special private gain or s; inured to the special gain or loss of my t inured to the special gain or loss of my n inured to the special gain or loss of whom I am retained; or inured to the special gain or to of is the parent organizatio r subsidiary of a principal which has retained m+ (b) The measure before m gency and the nature of my conflicting interest in the (�ee Date Fi d is as follows: ,20 by , which u t7 N O C= n o`er r. X71 co 1 rte- "U Cn O Cn 2 NOTICE: UNDER PROVISIONS OF FLORIDA STATUTES §112.317, A FAILURE TO MAKE ANY REQUIRED DISCLOSURE CONSTITUTES GROUNDS FOR AND MAY BE PUNISHED BY ONE OR MORE OF THE FOLLOWING: IMPEACHMENT, REMOVAL OR SUSPENSION FROM OFFICE OR EMPLOYMENT, DEMOTION, REDUCTION IN SALARY, REPRIMAND, OR A CIVIL PENALTY NOT TO EXCEED $10,000. CE FORM 813 - EFF. 1/2000 PAGE 2 On Monday, June 20, 2003, I met with the members of the State Attorney's Office. I was advisgd that there was an on-going investigation of the rezoning of 536, 602, 608 and 690 NW 57`h Avenue and 601, 605, 611, 631 and 641 NW 57`h Court which appear on the July 17, 2003 Planning and Zoning agenda as items PZ 9 and PZ 10. The investigation appears to involve a claim that retention of a certain individual would be instrumental in obtaining a favorable vote from me. In fact, because of the "Jennings Rule" I have not spoken to anyone involved in the application; neither the applicants representatives nor the homeowners affected. 1 was advised by the State Attorney's office t hat I w as n of a t arget, b ut rather a witness. I w ill, a nd h ave already begun t o, cooperate fully with the appropriate law enforcement authorities to remedy this. Although, I did nothing wrong, after consultation with my attorney, Jack R Blumenfeld, and C ity Attorney Alejandro V ilarello, I h ave concluded t hat, b ecause o f these allegations and my role as a witness, there appears to be a possible conflict of interest. I emphasize that there is only an appearance of a conflict; I believe that I have no actual conflict. Nevertheless, under these circumstances, our interpretation of FS 286.012 compels that I abstain. I do so reluctantly, but agree that this is the proper course to take R t!i N CL An nza ez ! D 1,910 00 � J - � o w v � N (Y Blank Page 1 of 1 Scheider, Sylvia From: Vilarello, Alejandro Sent: Thursday, July 24, 2003 10:30 PM To: Scheider, Sylvia Cc: Castaneda, Frank; Gonzalez, Angel (Commissioner); Thompson, Priscilla A.; Medina, Anna M. Subject: RE: Memorandum of Voting Conflict -----Original Message ----- From: Scheider, Sylvia Sent: Friday, July 18, 2003 4:11 PM To: Vilarello, Alejandro Cc: Castaneda, Frank; Gonzalez, Angel (Commissioner); Thompson, Priscilla A.; Medina, Anna M. Subject: Memorandum of Voting Conflict Commissioner Gonzalez had filed with our office a Memorandum of Voting Conflict in connection with items PZ -9 and PZ -10 of the July 17th Commission meeting, but he was absent all during the afternoon and evening session. Should our office reflect the Commissioner as having abstained and file the memorandum of voting conflict, or should we rel flect the Commissioner as being absent during those two items and return the memornadum of voting conflict back to the Commissioner? Sylvia Scheider Sylvia Scheider Assistant City Clerk 250-5367 7/25/2003