Lawson Thomas Buiding - Roofing Reconstruction Project Close-out with 40 year Required Improvements
1021 NW 3rd Ave - Anticipated Project Budget 9/15/2022
Base Construction Proposal $205,800
A/E fees w/Construction Administration $20,500
Permit fees (master, sub -permits, & 40 year) $15,000 (estimated)
impact fees $0 (none anticipated)
WASD fees/connection charges/street closure $25,000 (estimated)
FPL service connection $3,500
Asbestos survey/mitigation (if needed) $7,500
Insurance and Bonds $0 (included)
Total $277,300
contingency (7.5%) $20,798
Total Project Budget Cost $298,098
BOFAM CONSTRUCTION COMPANY, INC
_General Contractors, Estimators & Roofing Contractors_
CGC 062660 & CCC 1329221
(Certified DBE, CSBE, SECTION 3)
TEL: (754) 245-0102
FAX: (305) 675-9269
AUSTIN@BOFAMINC.COM
Date: August 31, 2022
Proposal: # B22-042
To: Mr. Brian Zeltsman
Community Redevelopment Agency
Director of Architectural & Dev
819 NW 2nd Avenue
Miami, FL 33136
305-679-6827 (Tel)
305-679-6835 (Fax)
E-mail: BZeltsmankmiamigov.com
Attention: Mr. Zeltsman
We appreciate the opportunity to submit a proposal on your firm's project.
If you have any questions, please do not hesitate to contact me at (754) 245 — 0102
Respectfully, Austin Akinrin
Project: Thomas Building Roofing Close-out with 40/50 Year Recertification
Location: 1021 NW 2nd Avenue, Miami, FL 33136
Quotation:
1600 N.W 3RD AVENUE,
BLDG. D4
MIAMI, FL 33136
Scope of work: Furnish all permits, labor, materials, equipment and services for the construction and improvement to include
permit close-out of existing roofing reconstruction permit for work previously completed triggering building department
requiring improvements to building to comply with 40-year recertification, work is not limited to complete the works as
requested by City of Miami 40-Year recertification, code compliance, and as specified in the attached scope of work.
Base Price
Thomas Building Roofing Close-out with 40/50 Year Recertification $205,800
Alternates
Engineering & design fees $20,500
Asbestos report & remediation (If required) $7,500
Permit Fees (All agencies having jurisdiction) $15,000
Payment: As agreed
Specific Exclusions: Fees (All agencies having jurisdiction)
This proposal may be withdrawn and/or revised in 15 days if not accepted the undersigned owner accepts the above job at
the price quoted and agrees to pay for said work as per agreed payment schedule specified herein.
Sincerely,
Austin Akinrin,
President
ACCEPTANCE OF PROPOSAL: The above prices, specifications and conditions are satisfactory and accepted. You are
authorized to do the work as Specified and payments will be made as described above.
Date of Acceptance; / 2022 Signature: _
Page 1 of 1
Preliminary Scope of Work
40/50 Year Recertification & Improvement
Lawson Thomas Building
1021 NW 2nd Ave Updated 8/29/2022
DEMOLITION
(previously completed)
Provide new openings for windows/doors as required
MECHANICAL
Furnish and install A/C units (i.e. — air handler and condenser units) as required based on
assumed loads for future cafe use
Furnish and install new duct work
Furnish and install new refrigerant lines and covers, drain lines, and A/C stands
Exterior condenser units to be protected by security screen.
All mechanical work is based on permitted Mechanical and Plumbing plans
LOW VOLTAGE ELECTRICAL
Furnish and install new data and cable drops at limited locations based on assumptions for
40/50-year recertification use or as determined by Owner
ELECTRICAL
Install Electrical Service and Panel Boxes (including all new interior wiring, electric boxes,
switches, receptacles, smoke detectors, breakers, and interior electrical panels)
Install new electrical service wires between new meter and new interior electrical panels
Install new interior light fixtures (low -end for temporary use, but permanent wires and
conduits)
Install new exterior light fixture at front entry
Furnish and install fire alarm system (if required)
Furnish and install new conduits and associated wiring for new fire alarm system (if
required)
Exit signs as required for each exit
aI:7;8:j:Zell1X01[07►1
[Fire protection system only if required by Code]
Provide and install a minimum of 2 ABC type fire extinguishers
PLUMBING
Provide new sewer lateral
Provide new water service
Confirm/supply backflow preventer
Construct two (2) new ADA-compliant bathroom, with required fixtures, accessories, grab- bars,
etc.
CONCRETE
Identify and repair all exterior cracks on existing building exterior
Remove existing broken concrete sidewalk in front and along south side of building
Removed broken floor slab at exterior North side. Replace with new as per design approved.
Patch and repair exterior walls or skim coat where needed.
Pressure clean and paint building exterior
Interior concrete floor slab: floor leveling min. 2" concrete will be required
ROOF
(Previously completed)
DRYWALL
Install and finish (i.e. — smooth finish) new drywall and furring at all exterior walls
Install new framing and drywall at restrooms, a/c closet (if required), and electrical closet
(if required).
Paint building interior white or with colors to be determined by the Owner
Provide thermal insulation at exterior walls as required by code and sound insulation at
interior partitions
1901t;9:1;&9
Floor slab: exposed concrete (float level and smooth)
Ceiling: exposed; painted black
WINDOWS & DOORS
Install new impact glass store front at West fagade. Vestibule may be required for door
swing.
Install new impact windows and doors at North fagade to allow for future outdoor
dining/seating area at mini -park lot owned by the CRA. To include large sliding/ accordion
panels opening. (Maintain existing mural at west end)
Install new metal door at Southeast corner of building for secondary egress
DESIGN SERVICES
Coordinate location/condition of existing water and sewer service
Prepare engineering plans to be submitted to Miami -Dade WASD, DERM, and the city of
Miami's Department of Public Works for review, approval, and permit
Prepare architectural plans to be submitted to the City of Miami's Building Department for
review, approval, and permit
Prepare fire protection plans for permit (if required)
Coordinate with FPL Central Office to provide electrical service for the project
Coordinate with MDWASD for new sewer tie-in and water metering
PAINTING
- Prepare and repair building to receive new paint (Interior)
- Apply one (1) coat primer
- Apply two (2) coats interior paint (Color selection by owner)
a
GRAPHIC SCALE FOLIO NO 01-0101-060-1130 --- - ----- — --- - ---
10 20 40 8G
iN ii EE`i- N\1 Ztv AVM
1 inch = a"*t f L-AW �04 TRt" �1It_PI O9
SURVEY FOR: 1021 NW 2ND AVENUE
MIAMI, FLORIDA 33136
I HEREBY CERTIFY: That the BOUNDARY SURVEY of the above captioned proper.,t
was completed under my supervision and/or direction, to the best of my knowled t
This survey meets or exceeds the Minimum Technical Standards set forth by the F' a%
of Land Surveyors in Chapter 5J-17 Florida Adminis Code. Pursuant to
472.027, Florida Statutes.
DELTA MAP IN S YI INC.
�ouG X- w6l� Lftrr
F011!ND
�Wt6 C.Aa►SOP`f p6a- Pxlev. b '} OJt St�i3-UI't'o2. W►4 %I�G(�auf�G7bu PIPE
ID. i
�, frx,9C. PttoTo ._
R: 12"
ON L;N h s
ONE STORY SUILDIN
1021 N W. 2ND AVE`!. r-LWa4A7G
1 e.
OUND • �G• �AIgt,Kv�/
If tw1R•aD
tAW- vZ
Q 4tp&, *ir--
W o w
WWMW T6 MWft NO ID
i
DEL TA MAPPING AN10 SURVEYING INC. 1