Loading...
HomeMy WebLinkAboutCRA-R-22-0044 BackupF Lawson Thomas Buiding - Roofing Reconstruction Project Close-out with 40 year Required Improvements 1021 NW 3rd Ave - Anticipated Project Budget 9/15/2022 Base Construction Proposal $205,800 A/E fees w/Construction Administration $20,500 Permit fees (master, sub -permits, & 40 year) $15,000 (estimated) impact fees $0 (none anticipated) WASD fees/connection charges/street closure $25,000 (estimated) FPL service connection $3,500 Asbestos survey/mitigation (if needed) $7,500 Insurance and Bonds $0 (included) Total $277,300 contingency (7.5%) $20,798 Total Project Budget Cost $298,098 BOFAM CONSTRUCTION COMPANY, INC _General Contractors, Estimators & Roofing Contractors_ CGC 062660 & CCC 1329221 (Certified DBE, CSBE, SECTION 3) TEL: (754) 245-0102 FAX: (305) 675-9269 AUSTIN@BOFAMINC.COM Date: August 31, 2022 Proposal: # B22-042 To: Mr. Brian Zeltsman Community Redevelopment Agency Director of Architectural & Dev 819 NW 2nd Avenue Miami, FL 33136 305-679-6827 (Tel) 305-679-6835 (Fax) E-mail: BZeltsmankmiamigov.com Attention: Mr. Zeltsman We appreciate the opportunity to submit a proposal on your firm's project. If you have any questions, please do not hesitate to contact me at (754) 245 — 0102 Respectfully, Austin Akinrin Project: Thomas Building Roofing Close-out with 40/50 Year Recertification Location: 1021 NW 2nd Avenue, Miami, FL 33136 Quotation: 1600 N.W 3RD AVENUE, BLDG. D4 MIAMI, FL 33136 Scope of work: Furnish all permits, labor, materials, equipment and services for the construction and improvement to include permit close-out of existing roofing reconstruction permit for work previously completed triggering building department requiring improvements to building to comply with 40-year recertification, work is not limited to complete the works as requested by City of Miami 40-Year recertification, code compliance, and as specified in the attached scope of work. Base Price Thomas Building Roofing Close-out with 40/50 Year Recertification $205,800 Alternates Engineering & design fees $20,500 Asbestos report & remediation (If required) $7,500 Permit Fees (All agencies having jurisdiction) $15,000 Payment: As agreed Specific Exclusions: Fees (All agencies having jurisdiction) This proposal may be withdrawn and/or revised in 15 days if not accepted the undersigned owner accepts the above job at the price quoted and agrees to pay for said work as per agreed payment schedule specified herein. Sincerely, Austin Akinrin, President ACCEPTANCE OF PROPOSAL: The above prices, specifications and conditions are satisfactory and accepted. You are authorized to do the work as Specified and payments will be made as described above. Date of Acceptance; / 2022 Signature: _ Page 1 of 1 Preliminary Scope of Work 40/50 Year Recertification & Improvement Lawson Thomas Building 1021 NW 2nd Ave Updated 8/29/2022 DEMOLITION (previously completed) Provide new openings for windows/doors as required MECHANICAL Furnish and install A/C units (i.e. — air handler and condenser units) as required based on assumed loads for future cafe use Furnish and install new duct work Furnish and install new refrigerant lines and covers, drain lines, and A/C stands Exterior condenser units to be protected by security screen. All mechanical work is based on permitted Mechanical and Plumbing plans LOW VOLTAGE ELECTRICAL Furnish and install new data and cable drops at limited locations based on assumptions for 40/50-year recertification use or as determined by Owner ELECTRICAL Install Electrical Service and Panel Boxes (including all new interior wiring, electric boxes, switches, receptacles, smoke detectors, breakers, and interior electrical panels) Install new electrical service wires between new meter and new interior electrical panels Install new interior light fixtures (low -end for temporary use, but permanent wires and conduits) Install new exterior light fixture at front entry Furnish and install fire alarm system (if required) Furnish and install new conduits and associated wiring for new fire alarm system (if required) Exit signs as required for each exit aI:7;8:j:Zell1X01[07►1 [Fire protection system only if required by Code] Provide and install a minimum of 2 ABC type fire extinguishers PLUMBING Provide new sewer lateral Provide new water service Confirm/supply backflow preventer Construct two (2) new ADA-compliant bathroom, with required fixtures, accessories, grab- bars, etc. CONCRETE Identify and repair all exterior cracks on existing building exterior Remove existing broken concrete sidewalk in front and along south side of building Removed broken floor slab at exterior North side. Replace with new as per design approved. Patch and repair exterior walls or skim coat where needed. Pressure clean and paint building exterior Interior concrete floor slab: floor leveling min. 2" concrete will be required ROOF (Previously completed) DRYWALL Install and finish (i.e. — smooth finish) new drywall and furring at all exterior walls Install new framing and drywall at restrooms, a/c closet (if required), and electrical closet (if required). Paint building interior white or with colors to be determined by the Owner Provide thermal insulation at exterior walls as required by code and sound insulation at interior partitions 1901t;9:1;&9 Floor slab: exposed concrete (float level and smooth) Ceiling: exposed; painted black WINDOWS & DOORS Install new impact glass store front at West fagade. Vestibule may be required for door swing. Install new impact windows and doors at North fagade to allow for future outdoor dining/seating area at mini -park lot owned by the CRA. To include large sliding/ accordion panels opening. (Maintain existing mural at west end) Install new metal door at Southeast corner of building for secondary egress DESIGN SERVICES Coordinate location/condition of existing water and sewer service Prepare engineering plans to be submitted to Miami -Dade WASD, DERM, and the city of Miami's Department of Public Works for review, approval, and permit Prepare architectural plans to be submitted to the City of Miami's Building Department for review, approval, and permit Prepare fire protection plans for permit (if required) Coordinate with FPL Central Office to provide electrical service for the project Coordinate with MDWASD for new sewer tie-in and water metering PAINTING - Prepare and repair building to receive new paint (Interior) - Apply one (1) coat primer - Apply two (2) coats interior paint (Color selection by owner) a GRAPHIC SCALE FOLIO NO 01-0101-060-1130 --- - ----- — --- - --- 10 20 40 8G iN ii EE`i- N\1 Ztv AVM 1 inch = a"*t f L-AW �04 TRt" �1It_PI O9 SURVEY FOR: 1021 NW 2ND AVENUE MIAMI, FLORIDA 33136 I HEREBY CERTIFY: That the BOUNDARY SURVEY of the above captioned proper.,t was completed under my supervision and/or direction, to the best of my knowled t This survey meets or exceeds the Minimum Technical Standards set forth by the F' a% of Land Surveyors in Chapter 5J-17 Florida Adminis Code. Pursuant to 472.027, Florida Statutes. DELTA MAP IN S YI INC. �ouG X- w6l� Lftrr F011!ND �Wt6 C.Aa►SOP`f p6a- Pxlev. b '} OJt St�i3-UI't'o2. W►4 %I�G(�auf�G7bu PIPE ID. i �, frx,9C. PttoTo ._ R: 12" ON L;N h s ONE STORY SUILDIN 1021 N W. 2ND AVE`!. r-LWa4A7G 1 e. OUND • �G• �AIgt,Kv�/ If tw1R•aD tAW- vZ Q 4tp&, *ir-- W o w WWMW T6 MWft NO ID i DEL TA MAPPING AN10 SURVEYING INC. 1