Loading...
HomeMy WebLinkAboutCRA-R-17-0031 BackupCAZO CONSTRUCTION CORP General Contractor - Construction Management 3461 S.W. 8th Street Miami, Florida 33135 LIC#CGC 007041 Town Park Village Assesment Re: Assesment 1680 NW 4th Ave Miami FI Complete Review of 149 Units $ 33,525.00 Preparation of a report/unit including pictures $ 7,450.00 Asbestos Report (Allowance if required) $ 29,800.00 Lead Paint Report (Allowance if required) $ 22,350.00 Cost of a New Survey (Allowance if required) $ 18,000.00 Evaluation of the Site (Allowance) $ 4,500.00 Paving and Drainage Ladscaping (Allowance) $ 13,068.00 No. Of trees, Types of trees, size of trees Etc Roofing Evaluation TBD Termite Tents TBD Selected Demolition (L.S.) $ 5,000.00 Meeting with the Bldg Dept.(Fire Alarm, flood plain, sprinkler) (Allowance) $ 4,500.00 Fire Consultant TBD Architecture and Engineering $ 400,000.00 * Existing Plan * Demo Plan * Architecture * Electrical * Mechanical * Plumbing * Structure (If Required)(Allowance) $ 54,500.00 Civil (Allowance) $ 52,505.00 * Existing Site Plan * Water Distribution * S.S. Distribution * Lighting * Drainage * Paving Relocation - Assesment/Advisory Services $ 30,000.00 Subtotal $ 568,193.00