Loading...
HomeMy WebLinkAboutCRA-R-17-0009 BackupVandalism/Theft Photos Disconnected Main Power Fixtures removed Wiring removed Barbed wire cut Wiring removed Condensate copper removed Conduits removed Window pried open Elevator control wiring removed Condensate copper removed Vandalism/Theft Photos Wiring cut Wiring removed Elevator control raceway wires removed Condensate copper Elevator wiring Elevator control panel wiring cut/removed Condensate copper Elevator wiring Condensate copper removed Power lines removed Vandalism/Theft Photos Wiring cut/removed Elevator raceway & controller wiring removed Condensate copper removed 1 Conduit vandalized PRIMARY CONSTRUCTION, INC. June 8, 2015 Southeast Overtown Park West Community Redevelopment Agency 819 NW 2nd Avenue, 3rd Floor Miami, FL 33136 RE: Change Order Request No. 1, Phase 1 Clyde Killens Pool Hall 40 Year Re -Certification We are pleased to submit this cost breakdown for Additional Design and Construction Services on the above referenced project located 920 NW 2nd Avenue, Miami, FL. Upon completing demolition we discovered that the SW corner of the building was constructed without foundation/footer or concrete slab on grade. This unforeseen condition requires additional work beyond our scope. We must remove the existing asphalt floor, remove the existing CMU walls, remove existing fill to approx. 4"- 6" below grade and compact. We will then pour a steel reinforced footer, Build CMU Walls, pour slab on grade. This area is approximately 900 sf. Primary Construction, Inc. needs this change order executed to perform the work shown in the table below: DESCRIPTION Total Demolition: Remove asphalt floor, remove fill, remove exterior Concrete Masonry Walls (Includes Hauling) $9,800 Architectural Drawings/Engineering $4,600 Notes: Includes Labor & Material; Not part of Original Contract; All Work Done to Code. TOTAL $14,400. 11300 SW 17511 Street, Miami, FL 33157 Ph (786) 348-1237 Fax (305) 232-1113 e-mail AMoss@PrimaryConstructionlnc.com PRIMARY CONSTRUCTION, INC. June 8, 2015 Southeast Overtown Park West Community Redevelopment Agency 819 NW 2nd Avenue, 3rd Floor Miami, FL 33136 RE: Change Order Request No. 1, Phase 2 Clyde Killens Pool Hall 40 Year Re -Certification We are pleased to submit this cost breakdown for Additional Design and Construction Services on the above referenced project located 920 NW 2nd Avenue, Miami, FL. Upon completing demolition we discovered that the SW corner of the building was constructed without foundation/footer or concrete slab on grade. This unforeseen condition requires additional work beyond our scope. We must remove the existing asphalt floor, remove the existing CMU walls, remove existing fill to approx. 4"- 6" below grade and compact. We will then pour a steel reinforced footer, Build CMU Walls, pour slab on grade. This area is approximately 900+ sf. Primary Construction, Inc. needs this change order executed to perform the work shown in the table below: DESCRIPTION Total Excavate, Form, Place Structural Steel & Pour Reinforced Concrete Foundation $17,900 Re -Build Structural/Masonry Walls $18,900 Pour & Finish Slab on Grade Included Backfill, Grading, Compaction, Sheathing as Necessary $13,600 Notes: Includes Labor & Material; Not part of Original Contract; All Work Done to Code. TOTAL $50,400. 11300 SW 17511 Street, Miami, FL 33157 Ph (786) 348-1237 Fax (305) 232-1113 e-mail AMoss@PrimaryConstructionlnc.com PRIMARY CONSTRUCTION, INC. June 8, 2015 Southeast Overtown Park West Community Redevelopment Agency 819 NW 2nd Avenue, 3" Floor Miami, FL 33136 RE: Change Order Request No. 2 Clyde Killen's Pool Hall 40Year Re -Certification We are pleased to submitthiscost breakdown for Additional Design and Construction Services on theabove referenced project located 920 NW 2nd Avenue, Miami, FL. Primary Construction, Inc. needs this change order executed to performthe work shown in the table below: DESCRIPTION Total Reinforce windowopeningswith StructuraISteel, form, &Pour Concrete. Install Fixed Impact Windows72X50; 72X50; 72X50; 37X50; 37X50 Frames to be White in Color with Grey Class $13,900 Furnish/Install Double French Door (Commercial) $6,800 Architectural Drawings/Engineering Revisions $800 Notes: Horizontal Roller Windowwill increase cost by$50/window TOTAL $21,500. 11300 SW 175t' Street, Mi a mi, FL 33157 Ph (786) 348-1237 Fax(305)232-1113 e-maiIAMoss@PrimaryConstructionInc. corn PRIMARY CONSTRUCTION, INC. June 16, 2015 Southeast Overtown Park West Community Redevelopment Agency 819 NW 2nd Avenue, 3rd Floor Miami, FL 33136 RE: Change Order Request No. 3 Clyde Killen's Pool Hall 40 Year Re -Certification We are pleased to submit this cost breakdown for Additional Design and Construction Services on the above referenced project located 920 NW 2nd Avenue, Miami, FL. Primary Construction, Inc. needs this change order executed to perform the work shown in the table below: DESCRIPTION Total Furnish & Install 1,500 gallon Grease Interceptor Includes: Excavation, Crane Drop, and Backfill area. $8,900 Install Grease Waste Line Includes: Excavation and installation of Underground Grease line to front of Tank, Extension into Building, and Tie into Sanitary sewer line. Concrete cutting/patching as Necessary $5,400 Architectural Drawings/Engineering Revisions $695 Notes: TOTAL $14,995. Thank you, President PRIMARY CONSTRUCTION, INC. Sign & Da Print Name, Title SEOPWCRA Authorized Agent 11300 SW 17511 Street, Miami, FL 33157 Ph (786) 348-1237 Fax (305) 232-1113 e-mail AMoss@PrimaryConstructionInc.com PRIMARY CONSTRUCTION, INC. January 12, 2016 Southeast Overtown Park West Community Redevelopment Agency 819 NW 2nd Avenue, 3rd Floor Miami, FL 33136 RE: Change Order Request No. 4 Clyde Killen's Pool Hall 40 Year Re -Certification We are pleased to submit this cost breakdown for Additional Design and Construction Services on the above referenced project located 920 NW 2nd Avenue, Miami, FL. Primary Construction, Inc. needs this change order executed to perform the work shown in the table below: DESCRIPTION Total Furnish & Install Custom Steel Security Cages at Rooftop Condenser Units; Includes Service Entry $4,500 Notes: TOTAL $4,500. Thank you, President PRIMARY CONSTRUCTION, INC. Sign & Date Print Name, Title SEOPWCRA Authorized Agent 11300 SW 17511 Street, Miami, FL 33157 Ph (786) 348-1237 Fax (305) 232-1113 e-mail AMoss@PrimaryConstructionlnc.com