Loading...
HomeMy WebLinkAboutCRA-R-19-0023 BackupBOFAM CONSTRUCTION COMPANY, INC _General Contractors, Estimators & Roofing Contractors_ CGC 062660 & CCC 1329221 (Certified DBE, CSBE, SECTION 3) TEL: (754) 245-0102 FAX: (305) 675-9269 AUSTIN@BOFAMINC.COM CHANGE PROPOSAL REQUEST #1 ADDITIONAL WORK ORDER April 19, 2019 To: Brian Zeltsman Southeast Overtown/Park West - CRA Project Manager, 819 NW 2nd Avenue Miami, FL 33136 Tel: 305-679-6827 Fax: 305-679-6835 2019 Email: BZeltsmanAa miami ov.com Dear Mr. Brian. 1600 N.W 3RD AVENUE, BLDG. D4 NIMMI, FL 33136 Project: St Peter's catholic Church 40 Year Recertification Location: 1811 NW 41' Court Miami, FL 33136 Contract Date: December 11th, Per recent conversation and understanding, we hereby submit the following change proposal as requested in connection with the named project for your approval. Addition 1. Additional Bathrooms: Provide new rear toilet, accessible from inside the building $ 7,500 2. HVAC Replacement: (Per Engineer recommendations) Original scope was to repair existing units; however, they are non -repairable and beyond useful life span. New (4) 5ton HVAC units was recommended by the Engineer. $10,800 3. Replace all Interior doors: Replace aluminum storefront French door and (2) others that were inoperable and could not be repaired $ 3,200 4. Vandalism/Theft: Replace with new all broken lights, stolen copper pipes, and vandalized electrical conduits and wires $ 4,000 5. Security: Additional exterior lighting and monitoring system for safety and security $ 4,500 6. Bell Tower: Improvement to bell tower roof $ 5,000 $35,000 Total Change Proposal #1 $35,000.00 Time Extension: These changes require additional TBD days to the contract. READ APPROVED AND ACCEPTED THIS day of , 20_ PROJECT MANAGER: CONTRACTOR: Sign & Date Page 1 of 1 Sign & Date 40 Year Certification Additional Scope of Work St Peter's Catholic Church — 1811 NW 4th Court ADDITIONAL BATHROOM Provide new rear toilet, accessible from inside the building Install framing and drywall enclosure for accessible toilet Supply and install sewer and water connection, water closet and pedestal Furnish and install new 70CFM exhaust fan in ceiling with switch and wiring Furnish and install ceramic floor and wall tiles to US standard and quality REPLACE EXISTING HVAC Furnish and install new (4) 5ton A/C units (i.e. - air handler and condenser units) Supply and install new duct work Furnish and install new refrigerant lines and covers, drain lines, and A/C stands Exterior condenser units to be protected by security screen. REPLACE INTERIOR FRENCH DOOR Furnish and install aluminum storefront French door and (2) others that were inoperable and could not be repaired Supply and install new commercial lockset and hardware Provide new framed opening for French door VANDARLISM/THEFT Remove and dispose vandalized conduits, wires, HVAC copper pipes, and exterior lights Install new electrical service wire connections to A/C and exterior lights Replace and or repair damaged electrical wall conduits. SECURITY Supply and install additional LED exterior light fixture at front entry and around the building Furnish and install new conduits and associated wiring for new security monitoring system Exit signs as required for all doors BELL TOWER Pressure clean metal bell tower Treat with rust-oleum copper base Apply two (2) coats liquid copper coatings made with real copper flakes