HomeMy WebLinkAboutCRA-R-19-0022 BackupEXHIBIT A
Southeast Overtown/Park West
Community Redevelopment Agency
' k Legislation
CRA Resolution CRA-R-17-0031
File Number: 2356 Final Action Date:5/22/2017
A RESOLUTION OF THE BOARD OF COMMISSIONERS OF THE SOUTHEAST
OVERTOWN/PARK WEST COMMUNITY REDEVELOPMENT AGENCY,
AUTHORIZING A GRANT, IN AN AMOUNT NOT TO EXCEED $570,000, TO
TOWN PARK VILLAGE NO. 1, TO UNDERWRITE COSTS ASSOCIATED WITH
PRE -CONSTRUCTION SERVICES FOR THE REHABILITATION OF TPV,
LOCATED AT 1680 NW 4TH AVENUE, MIAMI, FLORIDA (FOLIO #: 01-3136-067-
0001); AUTHORIZING THE EXECUTIVE DIRECTOR TO EXECUTE ALL
DOCUMENTS NECESSARY FOR SAID PURPOSE; FURTHER AUTHORIZING
THE EXECUTIVE DIRECTOR TO DISBURSE FUNDS, AT HIS DISCRETION, ON
A REIMBURSEMENT BASIS OR DIRECTLY TO VENDORS, UPON
PRESENTATION OF INVOICES AND SATISFACTORY DOCUMENTATION;
ALLOCATING FUNDS FROM TAX REVENUE BOND ISSUANCE PROVIDED
FOR BY RESOLUTION NO. CRA-R-12-0061.
WHEREAS, the Southeast Overtown/Park West Community Redevelopment Agency
("CRA") is a community redevelopment agency created pursuant to Chapter 163, Florida
Statutes, and is responsible for carrying out community redevelopment activities and projects
within its Redevelopment Area in accordance with the 2009 Southeast Overtown/Park West
Redevelopment Plan ("Plan"); and
WHEREAS, Section 2, Goal 3, at page 11, of the Plan lists the "creati[on of] infill
housing, diversity in housing types, and retaining affordable housing," as a stated
redevelopment goal; and
WHEREAS, Section 2, Principle 2, at page 14, of the Plan provides that "[t]he
neighborhood ... retain access to affordable housing ... ;" and
WHEREAS, on June 9, 2016, the CRA issued Request for Qualifications ("RFQ") No.
16-05 for Design -Build and Relocation Services for TPV ("Project") and ranked the proposal
received from Cazo Construction, Corp. ("Cazo") as the highest ranked proposer; and
WHEREAS, on October 31, 2016, the Board of Commissioners, by Resolution No. CRA-
R-16-0051 authorized the CRA to negotiate with the top ranked firm to perform the Project,
which included an assessment of the condition of TPV in order to ascertain the approximate
total cost of the Project; and
WHEREAS, in order for TPV to proceed with the Project, a two-step process for the
design build services is necessary. Step one, involves the execution of an agreement to
undertake of pre -construction services for the Project. This step allows the development of
construction plans in order to ascertain the final construction costs; and
WHEREAS, step two involves the execution of a construction services agreement for the
rehabilitation of TPV; and
City of Miami Page 1 of 2 File ID: 2356 (Revision:) Printed On: 5/30/2017
File to: 2356 Enactment Number: CRA-R-17-0031
WHEREAS, the Board of Commissioners wish to authorize a grant, in an amount not to
exceed $570,000 to underwrite costs associated with pre -construction services for the
rehabilitation of TPV; and
WHEREAS, the Board of Commissioners finds that such a grant to TPV would further
the above mentioned redevelopment principles;
NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF COMMISSIONERS OF
THE SOUTHEAST OVERTOWN/PARK WEST COMMUNITY REDEVELOPMENT AGENCY
OF THE CITY OF MIAMI, FLORIDA:
Section 1. The recitals and findings contained in the Preamble to this Resolution are
adopted by reference and incorporated herein as if fully set forth in this Section.
Section 2. The Board of Commissioners hereby authorizes a grant in an amount not
to exceed $570,000, to Town Park Village No. 1 ("TPV"), to underwrite costs associated with
pre -construction services for the rehabilitation of TPV located at 1680 NW 4th Ave, Miami,
Florida (Reference Folio #: 01-3136-067-0001).
Section 3. The Executive Director is authorized to execute all documents necessary
for said purpose.
Section 4. The Executive Director is authorized to disburse funds, at his discretion,
on a reimbursement basis or directly to vendors, upon presentation of invoices and satisfactory
documentation.
Section 5. Funds to be allocated from tax revenue bond issuance provided for by
CRA-R-12-0061.
Section 6. This Resolution shall become effective immediately upon its adoption.
APPROVED AS TO FORM AND LEGAL SUFFICIENCY:
Re iee Jadustngh, Staff Cou nsel 5 i6/2017
City of Miami Page 2 of 2 File JD: 2356 (Revision: ) Printed on: 5/30/2017
EXHIBIT B
3/22/2019Z:\sharel\COMMON\excei\FILES\660 - Town Park Village\Phase I Estimate (TPVl)
CONSTRUCTION CORP.
PROJECT NAME: Town Park Village No. 1
ADDRESS: 500 NW 17 Street Miami FI 33136
DATE: March 20, 2019
DIV. 1 General Conditions
Phase I
BLDG 1,2,3,4,5,6 & 7 (40 U)
39137 S.F.
0101
Permits
By Owner
0102
Engineer Fees
$ 4,246.00
0103
Surveys
$ 2,895.00
0104
Compaction / Concrete
$ 4,246.00
0107
Plans for Bid
$ 2,123.00
0108
Supervision
$ 76,428.00
0109
Safety Requirements
$ 3,474.00
0112
Equipment Rental
$ 5,018.00
0113
Mobil/Layout (Lump Sum)
$ 4,921.50
0114
Off/Storage Trailer
$ 4,728.50
0116
Temporary Utilities
$ 6,581.30
0117
Field Toilets
$ 2,702.00
0118
Trash Hauling (Miscellaneous)
$ 16,791.00
0119
Insurance Liability (Lump Sum)
$ 10,422.00
0120
Barricades
$ 3,551.20
0121
Final Cleaning and Continius Cleaning
$ 18,817.50
0123
Miscellaneous
$ 8,685.00
0124
Photography/Signs (Lump Sum)
$ 1,447.50
0125
Punch List
$ 21,230.00
0126
General Labor
$ 23,160.00
0127
Guarantee
$ 15,054.00
0129
Truck/ Transportation
$ 4,342.60
SUBTOTAL �^�� �
$ _ 240,864.00
3/22/2019Z:\sharel\COMMON\excel\FILES\660 - Town Park Village\Phase I Estimate (TPV1)
DIV. 2 SITE WORK
02050
Demelition Clearing
$ 177,560.00
02082
Asbestos/ Lead Abatement (Allowance)
$ 19,300.00
02200
Earthwork
$ 4,825.00
02280
Soil Treatment
$ 6,369.00
02500
Re -Paving
$ 35,922.13
02520
Concrete Walks R Ramps
$ 41,205.50
02580
Pavement Marking/Bumpers
$ 8,890.55
02660
Water Distribution
$ 96,500.00
02700
Sewage Distribution
$ 77,200.00
02720
Storn Drainage
$ 21,712 50
02784
Site Lighting (Allowance)
$ 10,615.00
02830
Fences and Gates (Allowance)
$ 19,300,00
02900
Landscaping (Allowance)
$ 38,600.00
02901
Miscellaneous
$ 4,246.00
SUBTOTAL
$ 562,245.68
DIV.3 CONCRETE
03900
Concrete Demolition (Slab)
$ 31,845.00
SUBTOTAL
$ 31,846.00
DIV.4 MASONRY
04223 IMisc. Scaffolds/Security I $ 3,860.00
3,860.00
DIV.5 METALS
05010
MISC. Metal Materilas
$ 8,492.00
05720
Railings and Handrails (Allowace)
$ 16,791 00
SUBTOTAL
$ 25,283.00
DIV.6 WOOD AND PLASTICS
06005
General Labor
$ 65,813.00
06010
Lumber (Allowance) _
$ 11,580.00
06060
Rough Hardware (Allowance) _
$ 7,720.00
06124
Decking (Allowance)
$ 15.440 00
3/22/2019Z:\sharel\COMMON\excel\FILES\660 - Town Park Village\Phase I Estimate (TPV1)
06190
Pre-fab Wood Trusses (Allowance) Repairs
$ 19,300.00
06200
Finish Carpentry
$ 48.250.00
06220
Millwork
$ 34,720.00
06430
Wood Stairs and Handrails
$ 38,600.00
SUBTOTAL
$ 241,423.00
DIV.7 THERMAL & MOISTURE PROTECTION
07200
Insulation
$ 57,900.00
07270
Fire Stopping
$ 12,738.00
07610
Metal Roofing
$ 188,836.03
07620
Sheet Metal Trim
$ 15,440.00
07920
Sealants, Caulking and Seals
$ 10,615.00
SUBTOTAL
$ 285,529.03
DIV. 8 DOORS AND WINDOWS
08100
Exterior Metal Doors and Frames (N.I.C)
N.I.C.
08200
Wood Doors and Frames
S 77,200.00
08275
Door Louvers
$ 61,181.00
08520
Aluminum Windows (N.I.C)
N.I.C.
08710
Finish Hardware (Allowance)
S 47,092.00
08520
Window Repairs (Allowance)
S 12.738.00
SUBTOTAL
$ 198,211.00
DIV. 9 FINISHES
09200
Lath & Plaster
$ 130.371.50
09206
Metal Furring & Accessories
$ 152,856.00
09250
Gypsum Board
$ 373,648.00
09300
Window Sills
$ - 16,984.00
09310
Ceramic Tile
$ 67.936.00
09650
Resilient Flooring
$ 184,450.00
09900
Painting (Interior & Exterior)
$ 250,514.00
10420
10550
10670
10830
10830
3/22/2019Z:\sharel\COMMON\excel\FILES\660 - Town Park Village\Phase I Estimate (TPV1)
SUBTOTAL I $ 1,1T6,759.50
10 SPECIALTIES
Letters and Plaques
$
5,095.00
Postal Speialties
$
14,861.00
torage Shelving
$
33,968.00
Bathroom Mirrors
$
17.408.00
Bathroom Accessories
$
29,722.00
SUBTOTAL
$
101,064.00
DIV. 11 EQUIPMENT
11452
Residential Appliances (Allow.)
$ 93,412.00
SUBTOTAL
$ 93,412.00
DIV. 12 FURNISHINGS
12000
Kitchen and Bath Cabinets
$ 286,180.40
12500
Window Treatment
$ 25,476.00
SUBTOTAL
$ 311,656.40
DIV. 15 MECHANICAL
15320
Fire protection Sprinkler
N.I.C.
15400
Plumbing
$ 391,905.80
15500
Heating, Ventilating & A/C
$ 350,295.00
SUBTOTAL
Is 742,200.80
DIV. 16 ELECTRICAL
16400
Electrical Service & Distribution
$ 430,119.80
16501
Lighting
$ 50,952.00
SUBTOTAL
$ 481,071.80
TOTAL $ 4,495,415,21
OVERHEAD $ 179,816.61
SUBTOTAL $ 4,675,231.82
3/22/2019Z:\sharel\COMMON\excel\FILES\660 - Town Park Village\Phase I Estimate (TPVl)
PROFIT $ 327,266.23
SUBTOTAL $ 5,002,498.05
GRAND TOTAL $ 5,002,498.05
Phase I
Building 1- 3 bedroom townhouse 8 units 8,348 S.F.
Building 2- 3 bedroom townhouse 4 units 4,210 S.F.
Building 4- 4 bedroom flat 8 units 7,920 S.F.
Building 5- 3 bedroom garden 8 units 6,943 S.F.
Building 6- 4 bedroom garden 6 units 5,960 S.F.
Building 7- 4 bedroom flat garden 6 units 5,756 S.F.
,I I
3/22/2019Z:\sharel\COMMON\excel\FILES\660 - Town Park Village\Phase II Estimate (TPV II)
CONSTRUCTION CORP.
PROJECT NAME: Town Park Village No. 1
ADDRESS: 500 NW 17 Street Miami FI 33136
DATE: March 20, 2019
DIV. 1 General Conditions
Phase 11
BLDG 8,9,10,11,12,13, & 14 (57
U) 58,903 S.F.
0101
Permits
By Owner
0102
Engineer Fees
$ 5,500.50
0103
Surveys
$ 3,795.35
0104
Compaction / Concrete
$ 6,050.55
0107
Plans for Bid
$ 3,025.28
0108
Supervision
$ 108,909.90
0109
Safety Requirements
$ 4,950.45
0112
Equipment Rental
$ 7,150.00
0113
Mobil/Layout (Lump Sum)
$ 5.413.65
0114
Off/Storage Trailer
$ 6,738.11
0116
Temporary Utilities
$ 9,378.35
0117
Field Toilets
$ 3,850.35
0118
Trash Hauling (Miscellaneous)
$ 23,927,18
0119
Insurance Liability (Lump Sum)
$ 14.851.35
0120
Barricades
$ 5,060.46
0121
Final Cleaning and Continius Cleaning
$ 26,814.94
0123
Miscellaneous
$ 12,376,13
0124
Photography/Signs (Lump Sum)
$ 2,062.69
0125
Punch List
$ 30,252.75
0126
General Labor
$ 33,003.00
0127
Guarantee
$ 21,451.95
0129
Truck/Transportation
$ 6,188.06
SUBTOTAL
$ 340,751.00
3/22/2019Z:\sharel\COMMON\excel\FILES\660 - Town Park Village\Phase II Estimate (TPV II)
DIV. 2 SITE WORK
02050
Demelition Clearing
$ 253,023-00
02082
Asbestos/ Lead Abatement (Allowance)
S 27,502.50
02200
Earthwork
$ 6,875.63
02280
Soil Treatment
S 9,075.83
02500
Re -Paving
$27,864.38
02520
Concrete Walks & Ramps
$ 58,717.84
02580
Pavement Marking/Bumpers
$ 12,669.03
02660
Water Distribution
$ 137,512,50
02700
Sewage Distribution
$ 110,010.00
02720
Storn Drainage
$ 30,940.31
02784
Site Lighting (Allowance)
$ 15,126.38
02830
Fences and Gates (Allowance)
$ 27,502.50
02900
Landscaping (Allowance)
$ 55,005.00
02901
Miscellaneous
$ 6.050.55
SUBTOTAL
$ 777,875.45
DIV.3 CONCRETE
03900
Concrete Demolition (Slab)
$ 45,379.13
SUBTOTAL
is 45,379.13
DIV.5 METALS
05010
MISC Metal Materilas
$ 12,101.10
05720
Railings and Handrails
$ 23,927.18
SUBTOTAL
Is 36,028.28
DIV.6 WOOD AND PLASTICS
06005
General Labor
$ 93,783.53
06010
Lumber (Allowance)
$ 16,501.50
06060
Rough Hardware (Allowance)
$ 11,001.00
06124
Decking (Allowance)
$ 22,002 00
3/22/2019Z:\sharel\COMMON\excel\FILES\660 - Town Park Village\Phase II Estimate (TPV II)
06190
Pre-fab Wood Trusses (Allowance)
$ 27,505.50
06200
Finish Carpentry
$ 68,756.25
06220
Millwork
$ 49,504.50
06430
Wood Stairs and Handrails
$ 57,000.00
SUBTOTAL
$ 346,054.28
DIV.7 THERMAL & MOISTURE PROTECTION
07200
Insulation
$ 82,507.50
07270
Fire Stopping
$ 18,151,65
07610
Metal Roofing
$ 269,091,34
07620
Sheet Metal Trim
$ 22.002.00
07920
Sealants, Caulking and Seals
$ 15,126.38
SUBTOTAL
$ 406,878.87
DIV. 8 DOORS AND WINDOWS
08100
Exterior Metal Doors and Frames (N.I.C)
N.I.C.
08200
Wood Doors and Frames
$ 110,010.00
08275
Door Louvers
$ 87,182.93
08520
Aluminum Windows (N.I.C.)
N I.C.
08710
Finish Hardware (Allowance)
$ 67,106.10
$ 18,151.65
SUBTOTAL
$ 282,450.68
DIV. 9 FINISHES
09200
Lath & Plaster
$ 192,517.50
09206
Metal Furring & Accessories
$ 217.819 80
09250
Gypsum Board
$ 532,448.40
09300
Window Sills
$ 24.202 00
09310
Ceramic Tile
$ 96,808.80
09650
Resilient Flooring
$ 262,841.39
09900
Painting (Interior & Exterior)
$ 356,982 45
ITEM
10420
10550
10670
10830
10830
3/22/2019Z:\sharel\COMMON\excel\FILES\660 - Town Park Village\Phase II Estimate (TPV II)
SUBTOTAL $ 1,683,620.34
10 SPECIALTIES
Letters and Plaques
$
7,260.66
Postal Speialties
$
21,176.93
torage Shelving
$
48,404,40
Bathroom Mirrors
$
24.807.26
Bathroom Accessories
$
42,353.85
SUBTOTAL
$
144,003,10
DIV. 11 EQUIPMENT
11452
Residential Appliances (Allow.)
$ 133,112.10
SUBTOTAL
$ 133,112,10
DIV. 12 FURNISHINGS
12000
Kitchen and Bath Cabinets
S 407,807.07
12500
Window Treatment
S 36,303.30
SUBTOTAL
$ 444,110.37
DIV. 15 MECHANICAL
15320
Fire protection Sprinkler
N.I.C.
15400
Plumbing
S 558,465.77
15500
Heating, Ventilating & A/C
$ 500,101,00
SUBTOTAL
I $ 1,058,566.77
DIV. 16 ELECTRICAL
16400
Electrical Service & Distribution
$ 614,020.00
16501
Lighting
$ 73,000.00
SUBTOTAL
$ 687,020.00
TOTAL $ 6,391,350.87
OVERHEAD $ 255,654.03
SUBTOTAL $ 6,647,004.90
3/22/2019Z:\sharel\COMMON\excel\FILES\660 - Town Park Village\Phase II Estimate (TPV II)
PROFIT
$
465,290.34
SUBTOTAL
$
7,112,295.25
GRAND TOTAL
$
7,112,295.26
Phase II
Building 8- 4 bedroom flat 8 units 7,920 S.F.
Building 9- 3 bedroom garden 8 units 6,944 S.F.
Building 10- 4 bedroom flat 4 units 3,990 S.F.
Building 11- 3 bedroom garden flat & 3 bedroom townhome 8 units 12,522 S.F.
Building 12- 3 bedroom garden flat 10 units 8,664 S.F.
Building 13- 4 bedroom flat & 3 bedroom townhome 8 units 12,873 S.F.
Building 14- 4 bedroom flat 6 units 5,990 S.F.
d
3/22/2019Z:\sharel\COMMON\excel\FILES\660 - Town Park Village\Phase III Estimate (TPV III)
CONSTRUCTION CORP.
PROJECT NAME: Town Park Village No. 1
ADDRESS: 500 NW 17 Street Miami FI 33136
DATE: March 20, 2019
DIV. 1 General Conditions
Phase III
BLDG 15,16,17,18,19 & 20
(46 U) 40,610 S.F.
0101
Permits
By Owner
0102
Engineer Fees
$ 4,882.90
0103
Surveys
$ 3,329.25
0104
Compaction / Concrete
$ 4,882.90
0107
Plans for Bid
$ 2,441.45
0108
Supervision
$ 87,892.20
0109
Safety Requirements
$ 3,995.10
0112
Equipment Rental
$ 5,770.70
0113
Mobil/Layout (Lump Sum)
$ 5,659.73
0114
Off/Storage Trailer
$ 5,437.78
0116
Temporary Utilities
$ 7,568.50
0117
Field Toilets
$ 3,10730
0118
Trash Hauling (Miscellaneous)
$ 19,309.65
0119
Insurance Liability (Lump Sum)
$ 11,985.30
0120
Barricades
$ 4,083.88
0121
Final Cleaning and Continius Cleaning
$ 21,640.13
0123
Miscellaneous
$ 9,987.75
0124
Photography/Signs (Lump Sum)
$ 1,664.63
0125
Punch List
$ 24,414.50
0126
General Labor
$ 26,634.00
0127
Guarantee
$ 17,312.10
0129
Truck/ Transportation
$ 4.993.88
$
SUBTOTAL
$ 276,993.63
3/22/2019Z:\sharel\COMMON\excel\FILES\660 - Town Park Village\Phase III Estimate (TPV III)
DIV. 2 SITE WORK
02050
Demelition Clearing
$ 204,194 00
02082
Asbestos/ Lead Abatement (Allowance)
$ 22,195.00
02200
Earthwork
$ 5,548.75
02280
Soil Treatment
$ 7.324.35
02500
Re -Paving
$ 33,642,80
02520
Concrete Walks & Ramps
$ 47,386.33
02580
Pavement Marking/Bumpers
$ 10,224.13
02660
Water Distribution
$ 110,975.00
02700
Sewage Distribution
$ 88,780.00
02720
Storn Drainage
$ 24,969.38
02784
Site Lighting (Allowance)
$ 12,207.25
02830
Fences and Gates (Allowance)
$ 22,195.00
02900
Landscaping (Allowance)
$ 44,390.00
02901
Miscellaneous
$ 4,882.90
SUBTOTAL
$ 638,914.89
DIV.3 CONCRETE
03900
Concrete Demolition (Slab)
$ 36,621.75
SUBTOTAL
I $ 36,621.75
DIV.5 METALS
05010
MISC. Metal Materilas
$ 9,765.85
05720
Railings and Handrails
$ 19.309,65
SUBTOTAL
$ 29,075.50
DIV.6 WOOD AND PLASTICS
06005
General Labor
$ 75,684.95
06010
Lumber (Allowance)
$ 13,317.00
06060
Rough Hardware (Allowance)
$ 8,878.00
06124
Decking (Allowance)
$ 17,756.00
3/22/2019Z:\sharel\COMMON\excel\FILES\660 - Town Park Village\Phase III Estimate (TPV III)
06190
Pre-fab Wood Trusses (Allowance)
$ 22,195.00
06200
Finish Carpentry
$ 55,487,50
06220
Millwork
$ 39,951,00
06430
Wood Stairs and Handrails
$ 44.390.00
SUBTOTAL
$ 277,659.45
DIV.7 THERMAL & MOISTURE PROTECTION
07200
Insulation
$ 66,585.00
07270
Fire Stopping
$ 14,648,70
07610
Metal Roofing
$ 217.161.43
07620
Sheet Metal Trim
$ 17,756.00
07920
Sealants, Caulking and Seals
$ 12,207.25
SUBTOTAL
$ 328,358.38
DIV. 8 DOORS AND WINDOWS
08100
Exterior Metal Doors and Frames (N.I.C)
N.I.C.
08200
Wood Doors and Frames
$ 88,780.00
08275
Door Louvers
$ 70,358.15
08520
Aluminum Windows (N.I.C.)
N.I.C.
08710
Finish Hardware (Allowance)
$ 54,155.80
08520
Window Repairs (Allowance)
$ 14,648.70
SUBTOTAL
$ 227,942.65
DIV. 9 FINISHES
09200
Lath & Plaster
$ 155,365,00
09206
Metal Furring & Accessories
$ 175,784.40
09250
Gypsum Board
$ 429.695.20
09300
Window Sills
$ 19,531.60
09310
Ceramic Tile
$ 78,126.40
09650
Resilient Flooring
$ 212,117.62
09900
Painting (Interior & Exterior)
$ 288,091 10
10420
10550
10670
10830
10830
3/22/20192:\sharel\COMMON\excel\FILES\660 - Town Park Village\Phase III Estimate (TPV lll)
SUBTOTAL S 1,358,711.32
10 SPECIALTIES
Letters and Plaques
$
5,859.48
Postal Speialties
$
17,090.15
torage Shelving
$
39,063.20
Bathroom Mirrors
$
20,746.00
Bathroom Accessories
$
34,180,30
SUBTOTAL
$
116,939.13
DIV. 11 EQUIPMENT
11452 Residential Appliances (Allow.) $ 107,423.80
SUBTOTAL
107,423.80
DIV. 12 FURNISHINGS
12000
Kitchen and Bath Cabinets
$ 329,107.46
12500
Window Treatment
$ 29.297.40
SUBTOTAL
$ 358,404.86
DIV. 15 MECHANICAL
15320
Fire protection Sprinkler
N.I.C.
15400
Plumbing
$ 450,691.67
15500
Heating, Ventilating & A/C
$ 402,839.25
SUBTOTAL
$ 853,530.92
DIV. 16 ELECTRICAL
16400
Electrical Service & Distribution
$ 494,637.77
16501
Lighting
$ 58,594.80
SUBTOTAL
I $ 553,232.57
TOTAL
$ 5,168,247.85
OVERHEAD
$
206,729.91
SUBTOTAL
$
5,374,977.76
PROFIT _
$
376,248.44
3/22/2019Z:\sharel\COMMON\excel\FILES\660 - Town Park Village\Phase III Estimate (TPV III)
SUBTOTAL $ 5,751,226.21
GRAND TOTAL $ 5,751,226.21
Phase I
Building 15- 3 bedroom garden flat 6 units 5,192 S.F
Building 16. 3 bedroom garden 8 units 6,944 S.F.
Building 17- 4 bedroom & 3 bedroom garden flat 12 units 8,630 S.F.
Building 18- 4 bedroom flat 6 units 5,956 S.F.
Building 19- 3 bedroom garden flat 6 units 6,944 S.F.
Building 20- 3 bedroom garden 8 units 6,944 S.F.
3/25/2019CAUsers\elugones\AppData\Loca1\Microsoft\Windows\INetCache\Content.0ut1ook\SMTAVU96\Buildi
ng 3
CONSTRUCTION CORP.
PROJECT NAME: Town Park Village No. 1
ADDRESS: 500 NW 17 Street Miami FI 33136
DATE: March 20, 2019
DIV. 1 General Conditions
Building 3
0101
Permits
By Owner
0102
Engineer Fees
$ 440.00
0103
Surveys
$ 300.00
0104
Compaction / Concrete
$ 440.00
0107
Plans for Bid
$ 220.00
0108
Supervision
$ 7,920.00
0109
Safety Requirements
$ 360.00
0112
Equipment Rental
$ 520.00
0113
Mobil/Layout (Lump Sum)
$ 510.00
0114
Off/Storage Trailer
$ 490,00
0116
Temporary Utilities
$ 682.00
0117
Field Toilets
$ 280.00
0118
Trash Hauling (Miscellaneous)
$ 1,740.00
0119
Insurance Liability (Lump Sum)
$ 1,080.00
0120
Barricades
$ 368.00
0121
Final Cleaning and Continius Cleaning
$ 1,950.00
0123
Miscellaneous
$ 900.00
0124
Photography/Signs (Lump Sum)
$ 150.00
0125
Punch List
$ 2,200.00
0126
General Labor
$ 2,400.00
0127
Guarantee
$ 1,560.00
0129
Truck/ Transportation
$ 450.00
SUBTOTAL
$ 24,960.00
3/25/2019CAUsers\elugones\AppData\Loca1\Microsoft\Windows\INetCache\Content.Outlook\SMTAVU96\21uiIdi
ng 3
DIV. 2 SITE WORK
02050
Demelition Clearing
02082
Asbestos/ Lead Abatement
02200
Earthwork
$ 4.500.00
02280
Soil Treatment
$ 650.00
02500
Re -Paving
$ -
02520
Concrete Walks & Ramps
$ 4,270.00
02580
Pavement Marking/Bumpers
$ -
02660
Water Distribution
$ -
02700
Sewage Distribution
$ -
02720
Storn Drainage
$ -
02784
Site Lighting (Allowance)
$ -
02830
Fences and Gates (Allowance)
$ -
02900
Landscaping
$ 6,000.00
02901
Miscellaneous
$ 600.00
SUBTOTAL
$ 16,030.00
DIV.3 CONCRETE
03010
Concrete Materials
$ 44,100.00
03100
Concrete Formwork
$ 16,800.00
03110
Concrete Formwork/Labor
$ 42,000.00
03200
Concrete Reinforcement/ Material
$ 16,000.00
03210
Reinforcement Labor
$ 15,200.00
03250
Concrete Accessories
$ 6,000,00
03251
Concrete Rental
$ 8,000.00
03350
Concrete Finishes
$ 9,180.00
03700
Concrete Restoration
03251
Concrete Rental
03251
Concrete Rental
039DO
Concrete Demolition (Slab)
SUBTOTAL
$ 157,280.00
DIVA MASONRY
04220
Concrete Unit Masonry/ Material
$ 14,000.00
04222
Concrete Unit Masonry/ Labor
$ 13,200.00
04223
Misc. Scaffolds/Security
$ 4,000.00
SUBTOTAL
$ 31,200.00
3/25/2019CAUsers\elugones\AppData\local\Microsoft\Windows\INetCache\Content. 0ut1ook\SMTAVU96\Buildi
ng 3
DIV.5 METALS
05010
MISC. Metal Materilas
$ 880.00
05720
Railings and Handrails (Allowace)
$ 1,740.00
SUBTOTAL
$ 2,620.00
DIV.6 WOOD AND PLASTICS
06005
General Labor
$ 6,820.00
06010
Lumber (Allowance)
$ 2,500.00
06060
Rough Hardware (Allowance)
$ 1,800.00
06124
Decking (Allowance)
$ 4,111.00
06190
Pre-fab Wood Trusses
$ 15,787.00
06200
Finish Carpentry
$ 5,000.00
06220
Millwork
$ 3.600.00
06430
Wood Stairs and Handrails
$ 6,000.00
SUBTOTAL
$ 45,618.00
DIV.7 THERMAL & MOISTURE PROTECTION
07200
Insulation
$ 6.000.00
07270
Fire Stopping
$ 1,320.00
07610
Metal Roofing
$ 26,312.00
07620
Sheet Metal Trim
$ 1,600.00
07920
Sealants, Caulking and Seals
$ 1,100.00
SUBTOTAL
$ 36,332.00
❑IV. 8 DOORS AND WINDOWS
08100
Exterior Metal Doors and Frames
$ 2,800.00
08200
Wood Doors and Frames
$ 8,000.00
08275
Door Louvers
$ 6,340.00
08520
Aluminum Windows
$ 7,200.00
08710
Finish Hardware (Allowance)
$ 4,88000
08520
Window Repairs (Allowance)
$ -
SUBTOTAL
$ 26,420.00
3/25/2019CAUsers\elugones\AppData\Loca1\Microsoft\Windows\INetCache\Content.0ut1ook\SMTAVU96\Buildi
ng 3
DIV. 9 FINISHES
09200
Lath & Plaster
$ 14,000,00
09206
Metal Furring & Accessories
$ 15,840.00
09250
Gypsum Board
$ 38,720.00
09300
Window Sills
$ 1,760.00
09310
Ceramic Tile _
$ 7,040.00
09650
Resilient Flooring
$ 19,114.00
09900
Painting (Interior & Exterior)
$ 25,960.00
SUBTOTAL
$ 122,434.00
ITEM
10420
10550
10670
10830
10830
DIV. 10 SPECIALTIES
Letters and Plaques
$
528.00
Postal Speialties
$
1,540.00
torage Shelving
$
3.520.00
Bathroom Mirrors
$
1,804.00
Bathroom Accessories
$
3,080,00
SUBTOTAL
$
10,472.00
DIV. 11 EQUIPMENT
11452
Residential Appliances (Allow.)
$ 9.680.00
SUBTOTAL
$ 9,680.00
DIV. 12 FURNISHINGS
12000
Kitchen and Bath Cabinets
$ 26,000.00
12500
Window Treatment
$ 2,400.00
V
SUBTOTAL
$ 28,400.00
DIV.15 MECHANICAL.
15320
Fire protection Sprinkler
N.I.C.
15400
Plumbing
$ 40,612.00
15500
Heating, Ventilating & A/C
$ 36.300.00
SUBTOTAL
$ 76,912.00
3/25/2019CAUsers\el ugones\AppData\Local\M icrosoft\Windows\I NetCache\Content.0utlook\SMTAVU96\Buildi
ng 3
DIV. 16 ELECTRICAL
16400
Electrical Service & Distribution
$ 44,572.00
16501
Lighting
$ 5,280.00
SUBTOTAL
$ 49,852.00
TOTAL
$
638,210.00
OVERHEAD
$
25.528.40
SUBTOTAL
$
663,738.40
PROFIT
$
53,099.07
SUBTOTAL
$
716,837.47
GRAND TOTAL
$
716,837.47
Building 3- 3 bedroom townhouse 4 units 4,210 S.F.
179,209
0
0
0 0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
O
O
d
C
LL
y
M
Q
N
N
M
N
N
N
M
M
(°
M
M
Q
a0
0
0
0
0
ifl
W
M
47
O
W
O
N
y
W
r
p�
U
--
0
0
0 0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
o
O
N
Of
G
=3
m
L_
Y1 N LL
V%
O
0
t0
0
O
0 0
0
O
0
O
0
O
0
O
0
O
0
O
0
O
0
O
0
O
0
O
0
O
0
O
0
O
0
O
0
O
0
N
0
O
0
�D
0
0
0
0
0
0
0
0
0
0
0
OJ
0
O
0
O
0
W
0
O
0
N
0
O
0
O
0
tD
0
O
0
p
0
0
Q
O
N
N
W
d
(D
O
N
Q
N
Q
W
O
cD
N
�O
OJ
OD
O
O
O
O
O
O
O
O
Q
O_
N
O
Q
r
M
e
p
0
0
�
u
a`
d
0
q
0
N
0
N
0
OW
d
0
(O
0
O
0
0
Q
0
N
0
Q
0
W
0
O
0
�D
0
0
0
cp
0
0
W
0
OD
0
0
0
0
0
0
0
0
0
O
0
O
0
O
0
O
0
Q
0
o
0
0
0
ID
0
Q
r
o
M
P
o
e
0o
0
c
0
O
N
M
W
O
N
O
M
O�
M
Oi
Q
Of
0
0
0
0
O
t°
N
N
Q
•-
O
fD
In
M
c
O
O
O
E
m
N
0
O
O
O
LL.
LL
O
a
N
W W
-�
o
0
0 0
0
0
0
oW
0
o
0
0
o
0
0
0
0
o
0
0
0
0
0
0
0
0
o
0
0
o
0
0
0
0
0
o
0
io
0
00
0
0
0
0
0
0
0
o
0
W
0
o
0
o
0
0
o
0
0
0
0
0
0
0
o
0
o
0
00
0
0
O
N
d
IDd
Q
W
O
tp
N
cD
o0
W
O
O
O
O
O
O
O
Q
O
N
t0
d
M
O
O
0
0
0
O
16
6
N
N
O
[D
O
M
O
p
J
r
Q
�
c
�
u
_
o
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
oW
o
0
0
0
0
0
0
0
0
C
co
O
0
o
N
W
o
Q
0
�D
0
O
0
0
Q
0
N
0
Q
0
W
0
O
0
c0
0
N
0
0
tD
0
N
o
W
m
Op
o
o
0
0
0
0
0
O
O
0
O
0
O
o
N
o
o
co
o`
o
?
Q
Of
.1
O
M
O�
W
M
H
900
O
O
O
O
Ci°'1
O
O
p
O O
� m
N
b
C 3
A
O O
r
ED
d
�O
N
r
d
N
N
fp
r
N
tD
t�
W
M
r
O
u7
O
o
O
b
O
t•!
eh
M
o U
-
��i
z u
uw
(!1
�L
M O
d
d
00
Of
NP
O
d
d
t0
OD
t
dl`
m
tMD
p�D
�
Iff
Q
to
O
r
OJ
W
N
Q
O
W
iD
A
d
�
N
C
a
d
d
Iq
d
LL
N
o
0
0
0
O
0
O
0
cm!
O
OS
Mi
O
O.
1 F-
h
0
0
0
0
0
0
0
0
0
0
0
0
0
0
O
C
Op
<
Q
A
0D
q
W
V
�
ONi
W
W
O
ONi
h
O
_
0�
W
ONi
C
W
_
m
O
o
3
3
m
E
o
0
W
W
d
d
O
t0
C!
pp
O
W
N N
. LL
M
O
M
Cf
d
O
T
N
O
N
O
O
R
d
Q
N
O
q
O.
O
tP
O
O
O
❑
M
u!
t0
C
tp
Yf
�D
l0
O�
IO
tl+
N
b
t0
tD
tO
a
e7
O
o
V
N
Ni M
m
O
O
0
0
0
0�
0
0
0
0
d
O
OW
P
OW
O
2
(J
C
�
N
N
N
N
ID
O
N
O
N
n
O
OJ
�p h
00 EO
�
O
al
a
w
m
OO
a
i2
m
'E
s
x
Q N
❑
N
Ile r1
N
NdNO
N
C
.�.
o
__
V
y
LLO
K
J
N D
V
N
N
O
U
O
D J
W
N
7
LE
70
WUjo
tFo
o
03
co
JF
m
m m
m
m
m
m
m
m
m
m
E
EoMo
_
m
o
P') Z
>
co
N
J3
~
EXHIBIT C
Kelsey, Percilla
From: Kelsey, Percilla on behalf of Shiver, Cornelius
Sent: Thursday, April 25, 2019 4:47 PM
To: 'Armando Cazo' (armando@cazogroup.com); Anna -Bo Emmanuel
(aemmanuel@legalservicesmiami.org); semami (semami@legalservicesmiami.org)
Cc: Shiver, Cornelius; Zeltsman, Brian; Jefferson, Chanel; Kelsey, Percilla
Subject: Town Park Village
Importance: High
Cazo Construction:
Please be informed that the CRA has made the decision to terminate negotiations with Cazo
Construction Corp for the Town Park Village No. 1 renovation and rehabilitation project. The
directive to the CRA to negotiate with Cazo Construction Corp, pursuant to CRA Resolution
CRA 16-0051, was premised on a good faith effort to provide quality housing at a fair and
reasonable cost. The decision by the CRA to terminate negotiations with Cazo was made for
the following reasons:
The project costs provided by Cazo are excessive. More alarming, Cazo has not
provided the CRA with a concise summary for all of the project costs, notwithstanding
the CRA's request to Cazo for said summary. This failure by Cazo exposes the CRA to
financial uncertainty and other risks that the CRA is not willing to accept. There is a high
probability that project costs provided by Cazo will ultimately be higher than the
submitted costs, and as such, it is in the best interest of the CRA not to play this game
and to seek other options.
The numbers that the CRA have received from Cazo were missing important
components like permit costs, and some insurance costs which were listed in the RFQ
as requirements. While we have received some preliminary site work plans, they are still
in progress. As a result, we have not yet received any pricing for this component, which
is anticipated to be a substantial project cost. In addition, the numbers we did receive
had several "allowances" in the construction which could end up with higher project
costs at the end of the project.
For whatever reason, Cazo provided the project cost numbers to the CRA in a
piecemeal fashion. A simple totaling of the numbers received so far, along with some
assumptions for what is missing, indicates that the total project cost for Town Park
Village rehabilitation project will exceed $21 million. This is far higher than what the
CRA was expecting for this project and far higher than what the CRA is spending at
an adjacent and similarly situated renovation and rehabilitation at Town Park South,
which this RFQ was modeled after. This is a significant factor because the Town Park
Village development was a better managed site than Town Park South and for project
costs to far exceed that rehabilitation project is problematic.
Below is a simple comparison of costs for this project compared to Town Park Plaza
South:
• At Town Park Village, the cost per unit (all in) for the full rehab of 147 units
and relocation is at least $142,000.
• At Town Park Plaza South, the cost per unit (all in) for the full rehab of all
units and relocation is at about $116,000.
For the foregoing reasons, mainly where the numbers provided by Cazo far exceed the
reasonable cost threshold, the CRA believes it will be futile to attempt at negotiating a
reduction in scope or to attempt to negotiate with Cazo any further. To that end, I am hereby
putting all concerned parties on notice that the CRA is terminating all negotiations with Cazo
as it pertains to the Town Park Village rehabilitation project.
Cornelius Shiver ) Executive Director
SEOPW CRA Community Redevelopment Agency
819 NW 2"d Ave., 3`d floor, Miami, FL 33136
Phone: (305) 679-6811 1 Fax: (305) 679-6835
�-7
1ORDIGUSO
President
MANUEL DOBRINSKY
i" Vice President
SHATWON SPRY
2nd Vice President
JULIE AZUAIE
Treasurer
BARNABY MIN
Secretary
JEFF CROCKETT
Immediate Past President April 26, 2019
MARCIA K. CYPEN
Executive Director Emeritus
MONICA VIGUES-PITAN
Executive Director
Mr. Armando Cazo
President
Cazo Group Inc.
3461 SW 81' Street,
Miami, FL 33135
LEGRL SERVICES
Of GREATER MIAMI, INC.
NOTICE OF TERMINATION OF PREDEVELOPMENT AGREEMENT BETWEEN TOWN
PARK VILLAGE NO 1, INC. AND CAZO CONSTRUCTION CORP.
Pursuant to Article 5, Section 5.1 ("Section 5.1") of the Predevelopment Agreement Between
Town Park Village No 1, Inc. and Cazo Construction Group executed on January 10, 2018, (the
"Agreement"), you are hereby notified that Town Park Village No 1, Inc. ("Owner") is terminating
the Agreement with Cazo Construction Group (the "Contractor") as mutually acceptable terms
cannot be reached for a Contractor's Agreement. Section 5.1 specifically states that this termination
shall be automatic.
The parties entered the Agreement for the predevelopment services associated with the
rehabilitation of the housing units, (the "Project"), located 1680 NW 4a' Avenue, Miami, FL 33131,
(the "Property"). Under the Agreement, the Southeast OvertownlPark West Community
Redevelopment Agency (the "CRA") is responsible for providing all capital funding for the Project
as well as all of the predevelopment funding.
On April 25, 2019, the CRA notified the Contractor that it was terminating negotiations with the
Contractor regarding the Project. Based on this termination, the Owner is unable to reach any
acceptable terms for a Contractor's Agreement and is exercising its right under Section 5.1.
Sincerely,
Is/Anna-Bo Emmanuel
Anna -Bo Emmanuel, Esq.
Attorney -at -Law
PASSIONATELY COMMITTED TO EQUAL JUSTICE
4343 West Flagler Street - Suite 100 -Miami, FL 33134 =JILT (�%
Direct (305) 438 2441• Fax (305) 438 - 2441• TDD (305) 573 1578 LV\[�./
Email: aemmanuel@legalserwesmiami oig • Website www legalservu esrniami nrg
EXHIBIT D
U.S. Department of Housing and Urban Development
Washington, DC 20410-0100
09/11 /2018
REAL ESTATE ASSESSMENT CENTER
627748/ 800004516
TOWN PARK VILLAGE 1
1680 NW 4th AVE
MIAMI, FL 33136 -1527
Dear Owner:
This letter transmits by electronic file the most recent physical inspection summary report for your property.
This inspection was performed by an inspector certified by HUD in the use of the inspection protocol and was
performed pursuant to HUD regulations at 24 CFR Part 5 and Part 200. These regulations may be viewed on the
REAC website at http://www.hud.gov/offices/reac. This site provides information about REAC and the physical
inspection process and allows you to download a free copy of the inspection software and view deficiency
definitions. Also enclosed is a short description of the elements of the report to assist you in interpretation.
If the inspector noted any exigent health and safety (EH&S) deficiencies at the time of the inspection, you or
your representative received a report listing those deficiencies. You are required to correct all EH&S deficiencies
at your property, not only those deficiencies noted by the inspector. You must repair or mitigate all EH&S items
immediately, and you must file a written report with the local field office using your letterhead, certifying to the
repairs or mitigation of the EH&S items within three (3) business days of the date of the inspection. The attached
certification language must be included in your statement of completion. If your property is assigned to a
Performance -Based Contract Administrator (PB-CA), your certification should be sent to the PB-CA and not to
the local HUD office. If the loan is under the 232 program, your certification should be sent to the Account
Executive with the Office of Healthcare Programs (OHP). Do not send your report to REAC.
Because your property received a score of less than 31, the inspection has been referred to the Departmental
Enforcement Center for enforcement action. HUD may suspend the administrative procedure described in 24
CFR 200 Subpart P when HUD determines it necessary to protect HUD's financial interests and to protect the
residents as provided by 24 CFR 200.857(i)(4). Properties scoring below 31 have physical deficiencies that do
not meet the contractual obligations to HUD. Residents of such properties are not receiving the quality of housing
to which they are entitled. Accordingly, HUD is making a determination that it may proceed to enforcement action
as authorized by existing statutes, regulations, contracts or other documents.
You will be contacted by the Enforcement Center to set up a meeting or discussion on the compliance needs
of your property. However, you should not delay the commencement of repairs to your property pending such a
meeting. You should complete a survey of the physical needs of your entire property. While the REAC inspection
may provide baseline information, be advised that all property repair needs must be corrected. This survey
should be provided to the Departmental Enforcement Center upon your prompt completion.
If you fail to correct the physical deficiencies, fail to correct the EH&S violations, or, fail to provide HUD with
the required certification within the required timeframes, or falsely certify to repairs made, these noncompliance
issues may adversely affect your eligibility for participation in HUD programs. Under HUD's Previous
Participation Review and Clearance Procedure, these noncompliance issues constitute a standard for
disapproval pursuant to 24 CFR Section 200.230(c)(3) and HUD Handbook 4065.1 REV-1, paragraph
2-1(D)(1)(b). Under these circumstances, a flag (disqualifying entry) will be placed in the Active Partner
Performance Systems (APPS) in accordance with the textual "NOTE" at the conclusion of paragraph 2-1(D)(1) of
the above referenced handbook. This letter is the only notice that you will receive of the placing of a flag in the
APPS for noncompliance.
If the mortgage of the property is insured by HUD/FHA, please provide copies of all correspondence
regarding this inspection to your mortgagee.
Thank you for your cooperation.
Sincerely,
SAMUEL TUFFOUR
PROGRAM MANAGER, PHYSICAL ASSESSMENT
SUBSYSTEM
Real Estate Assessment Center
Enclosures
,.caro.
z
U.S. DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT
Richard Russell Federal Building, Box 22
Room 1070
75 Ted Turner Drive, S.W.
Atlanta, Georgia 30303-3318
�f 404-331-5001
OFFICE OF OE:ERAL COUNSEL
DIElOCT L 2 2018
DEPARTTAL EN'FORCEENIE`I` CENTER
Certified Mail — Return Receipt Requested 7018 0040 0000 0958 1483
Lillian Slater, President
Town Park Village No. 1, Inc.
P.O. Box 12405
Miami, FL 33101
SUBJECT: Notice of Default and Demand for Corrective Action
Project Name: Town Park Village I
Project Location: Miami, FL
Owner: Town Park Village No. 1, Inc.
HAP Contract Number: FL29M000187
iREMS Number: 800004516
Dear Ms. Slater:
This letter constitutes formal notice by the U.S. Department of Housing and Urban
Development ("HUD" or the "Department") that Town Park Village No. 1, Inc. (the "Owner"),
owner of Town Park Village I (the "Subject Project"), is in default of the Housing Assistance
Payments ("HAP") Contract effective March 17, 1985.1 Pursuant to Section 14(a) of the HAP
Contract, Owner has contracted to maintain the Subject Project in good and substantial repair and
condition. This standard is set forth in HUD regulation 24 C.F.R. § 5.703.
On or about September 11, 2018 the HUD Real Estate Assessment Center ("REAC")
inspected the Subject Project. As a result of the REAC Inspection, the Subject Project received a
score of 26, c*. The REAC Inspection Report identified serious physical deficiencies that
demonstrate that Owner is in default of the HAP Contract. Some of the deficiencies cited in the
REAC Inspection Report include, but are not limited to the following:
Roofs — Damaged Soffits/Fascia
Doors — Damaged Surface (Multiple)
Bathroom Items Unit - Plumbing Leaking Faucet/Pipes
Water Heater Unit — Inoperable Unit/Components
Kitchen Items Unit — Range/Stove-Missing/Damaged/Inoperable (Multiple)
Kitchen Item Unit — Cabinets — Missing Damaged
Foundations — Spalling/Exposed Rebar (Multiple)
1 The HAP Contract has been subsequently renewed with the most recent HAP Basic Contract
Multi -Year Term Renewal having an effective date of May 5, 2017.
Walls — Missing Pieces!Holes'Spalling
Doors — Deteriorated/Missing Seals Entry Door
Grounds Site — Erosion/Rutting Areas
HVAC System Unit — Inoperable (Multiple)
Ceiling Unit — Mold/Mildew/Water — Stains./Water Damage
Accordingly, Owner shall take the following corrective action within 60 days of the date
of receipt of this Notice of Regulatory Agreement Violation:
1. Provide a copy of this Notice to each of the Subject Project's residents;
2. Conduct a survey of the entire Subject Project, identifying all physical deficiencies;
3. Correct all physical deficiencies identified at the Subject Project from Owner's survey
and the REAC inspection report;
4. Execute the enclosed certification stating that: all deficiencies identified at the Subject
Project have been corrected; the Subject Project meets HUD's physical condition
standards of 24 CFR 5.703 and state and local codes; and Owner has provided this
Notice to the Subject Project's tenants as required;
5. Submit the completed survey and certification to HUD's Enforcement Analyst at the
following address:
Bridgette Zellous-Preston - Enforcement Analyst
U. S. Department of Housing and Urban Development
Office of General Counsel, Departmental Enforcement Center
Richard B. Russell Federal Building, Box 22
75 Ted Turner Drive, SW, Suite 1070
Atlanta, GA 30303
Should any repairs require more than the 60 days provided in this Notice, Owner may
request a reasonable extension in writing to the Enforcement Analyst listed above. Such a
request must be received by HUD prior to the expiration of the 60 days provided in this Notice.
The request must include:
• Owner's completed survey;
• The current status of each deficiency from Owner's survey and the REAC inspection
report and, if corrected, the date of correction;
• A plan to repair/correct each of the deficiencies yet to be corrected, including a timeline
for each to be corrected; and
• The cost of correcting the deficiencies and source(s) of funding.
Any HUD approved extension to the 60-day deadline will be provided in writing. HUD
will work with the owner to determine if the Owner's request is reasonable and adequately
protects the tenants' and HUD's interests.
Project records reveal that one or more of the Project's buildings was constructed prior to
1978. HUD is responsible for monitoring the Project's compliance with federal lead -based paint
(LBP) rules at 24 C.F.R. 35. Consistently, within thirty (30) days of the Owner's receipt of this
Notice, please provide to HUD the information and documentation listed on the enclosed Lead -
Based Paint (LPB)Compliance Documentation Instructions directly to HUD's Office of Lead
Hazard Control and Healthy Homes (OLHCHH) at the following mailing address or email
address:
U.S. Department of Housing and Urban Development
Office of Lead Hazard Control and Healthy Homes
ATTN: Bruce P. Haber
451 7th Street, S.W., Room 8236
Washington, DC 20410
Bruce.P.HaberQhudZov
Additional information regarding HUD's LBP rules may be found on HUD's intemet web
site at www.hud.gov, or by contacting Mr. Haber at 202-402-7698. After HUD's review of the
Owner's information, the Owner may be contacted by HUD for further documents or information
regarding LBP compliance.
HUD will re -inspect the Subject Project to confirm that Owner is compliant with the terms
of the HAP Contract. If Owner fails to take the necessary corrective action required herein, then
the assistance provided under the HAP Contract may be reduced, suspended, abated, or
terminated. Further, HUD may pursue any other remedies provided under the HAP Contract or as
otherwise provided by law.
For the reasons described in this Notice, HUD may flag Owner and others responsible for
the operation of the Project in HUD's Active Partners Performance System. This flag may
adversely affect eligibility for participation in HUD programs, under HUD's Previous
Participation Certification procedure, by constituting a standard for disapproval.
HUD may continue its review of any other contractual agreements between Owner and
HUD beyond the matters identified in this Notice. If HUD determines that there are additional
contractual violations or defaults, HUD's subsequent declaration of any such violations or defaults
will not affect the requirements set out in this notice.
If there are any questions concerning this matter, please contact Bridgette Zellous-Preston,
Enforcement Analyst, at (678) 732-2502 or via email at Bridgette.b.zellous@hud.gov. Other
concerns and issues should be referred to the Subject Project's project manager in the HUD
Multifamily Housing Program Office which continues to have jurisdiction over the Subject Project
during this process.
Sincerely,
Donald A. Billingsley
Director
Atlanta Satellite Office
Departmental Enforcement Center
Enclosure
E NT Off,
110
°c III�III"a
9AZ osvE`°
February 6, 2019
Dana Milson, President
Town Park Village No. 1, Inc.
P.O. Box 12405
Miami, FL 33101
Dear Ms. Milson:
U. S. Department of Housing and Urban Development
Jacksonville Field Office
Charles Bennett Federal Building
400 West Bay Street
Suite 1015
Jacksonville, Florida 32202-4439
SUBJECT: Notification of Failure to Comply with Notice of Default and APPS Flag
Town Park Village I
HAP Contract: FL29M000187
Miami, FL
On September 20, 2018, the HUD Real Estate Assessment Center (REAL) released the results
of the September 11, 2018, physical inspection, issuing a score of 26c indicating the property is not
in compliance with HUD's physical condition standards. A Notice of Default (NOD) was issued on
October 22, 2018, by HUD's Departmental Enforcement Center, outlining specific actions required
by the Owner, within 60 days of the date of the Notice, specifically the Owner was required to:
1. Provide each tenant with a copy of the Notice of Default
2. Conduct a survey of the entire Project, identifying the physical deficiencies
3. Correct all the physical deficiencies identified at the Project from the survey, and the REAC
inspection report;
4. Execute the enclosed certification that the Owner is in compliance with HUD's physical
condition standards of 24 CFR 5.703 and state and local codes and that the Owner has
provided the tenants with this Notice to the Project's tenants as required;
5. Submit the completed survey and certification to HUD's Enforcement Analyst.
The NOD instructed that should any repairs require more than the 60 days provided in the
Notice, the Owner may request a reasonable extension in writing to the Account Executive. Such a
request must be received by HUD prior to the 60-day expiration and include the follow items:
• The Owner's completed survey;
• The Status of each deficiency form the Owner's survey and the REAC inspection report and,
if corrected the date of correction;
• A plan to repair/correct each of the deficiencies yet to be correct, including a timeline for each
to be corrected; and
• The cost of correcting the deficiencies and source(s) of funding.
HUD's mission is to create strong, sustainable, inclusive communities and
quality, affordable homes for all.
www.bud.gov espanol.hud.gov
2
The Owner failed to respond to the NOD, as required.
Therefore, pursuant to HUD Handbook 4065.1 REV-1, Previous Participation Handbook,
the Owner Entity and its principals and the Management Agent and its principals, as listed on the
most current Previous Participation Certification and/or Florida Department of Corporations, whose
participation and performance fall under cited criteria for withholding approval or disapproval of
future participation, have been flagged in the Active Partners Performance System (APPS).
The effect of entering a principal's name into the APPS system is not a determination that
the principal will be denied HUD-2530 approval, nor does it mean the principal is suspended or
debarred. It means that any principal whose name is entered and who files a HUD-2530 for
clearance must be referred to HUD Headquarters for an approval decision.
You are notified that neither placement nor removal of a flag in HUD's APPS precludes
further action or sanctions by HUD, including but not limited to Limited Denial of Participation
and/or Debarment.
As a result of the Owner's failure to respond to the Notice of Default, a second inspection was
conducted on December 20, 2018. The property failed again with a score of 37c demonstrating a
continued failure to meet HUD's Physical Condition Standards. HUD is now considering additional
enforcement actions, including civil money penalties, a required change in management, and/or the
termination of the rental assistance contract.
If there are any questions, please contact Ms. Debra Varley, Asset Resolution Specialist
at (904) 208-6056 or by email at Debra.L.Varley(&HUD.eov.
Sincerely,
SAADIA_
FIGUEROA
Saadia Figueroa -Smallwood
Chief, Asset Resolution Branch
Jacksonville Satellite Office
cc: Stephanie Berman
President
Crossroads Management, LLC
1398 SW 1st Street, 12`h Floor
Miami, FL 33135
EXHIBIT E
CGC 010703 - CUC 056875 - AA 26001486
H.A. Contracting Corp.
pr."mi.g q.•11,y °n•tl-I...... J •
9500 N.W. 12th Street, Suite 1, Miami, FI, 33172
Phone: (305) 591-9212
Fax: (305) 591-9630
Project:
Town Park Plaza VILLAGE
Architect: CAZO ARCHITECTURE
5/13/2019
BuildingSquare Footage --------- —------------- —---------------------------- —----- —------ —--- ----- --------------------------------------- ------------- 135,000
CSl #
IDescription
$ amount
$ per SF
I % of total
00000
GENERAL CONDITIONS
$754,912.50
$5.59
01000
GENERAL REQUIRMENTS
$752,606.25
$5.57
02000
SITEWORK AND DEMOLITION
$561,556.00
$4.16
03000
CONCRETE
$199,562.50
$1.48
04000
MASONRY
$0.00
$0.00
05000
METALS
$105.018.80
$0.78
06000
WOODS & PLASTICS
$876,684.50
$6.49
07000
THERMAL & MOISTURE PROTECTION
$1,1571.693.74
$8.58
09000
DOORS & WINDOWS
$378,525.00
$2.80
09000
FINISHES
$5,053,692.87
$37.43
10000
SPECIALTIES
$195,663.95
$1.45
11000
EQUIPMENT
$492,082.50
$3.65
12000
FURNISHINGS
$0.00
$0.00
13000
SPECIAL CONSTRUCTION
$48,513.00
$0.36
14000
CONVEYING SYSTEMS
$0.00
$0.00
15000
MECHANICAL
$3,179,610.00
$23.55
16000
ELECTRICAL
$1,180,998.00
$8.75
DIRECT CONSTRUCTION COST ---------------- -----__-__----- $14,937,119.61
$110.65
Tenant Relocation Allowance
$1,375,000.00
Insurance
$136,755.00
Overhead 2.5%
$373,427.99
$2.77
Subtotal ---------- --------------------- —----------------------------------
--- $16,822,302.60
$124.61
Profit 7%
$1,177,561.18
$8.72
Subtotal
$17,999,863.78
$133.33
Total Budget --- _______-_____
$17,999,863.78
$133.33
9500 NW 12th Street, Bay 1, Miami, FL 33172 Phone (305) 591-9212 Fax (305) 591-9630
H.A. Contracting Corp.
p-.:a;-e q.-UlY .--.t... n-- ....I...
CGC 010703 - CUC 056875 - AA 26001486
9500 N.W. 12th Street, Suite 1, Miami, FL 33172
Phone: (305) 591-9212
Fax: (305) 591-9630
Project: Town Park Plaza VILLAGE
Architect: CAZO ARCHITECTURE 5l13l2019
Deductive Allowance Potential VE Savings
I Removal of Stucco Scope - Patch and Repair Only
2 Reduce Drywall Scope of Work - Identify Salavagable Areas
Total with deductive Allowances
Add Alternates
1 Site Work and Site Lighting Allowance
2 Performance and Payment Bond
3 Permit Allowance
($300,000.00)
($200,000.00)
$ l 7,499,863.78
$175,000.00
$134,434.08
$200,000.00
9500 NW 12th Street, Bay 1, Miami, FL 33172 Phone (305) 591-9212 Fax (305) 591-9630
H.A. Contracting Corp_._
pro%iding qunlit, construction services
Town Park Villaue
Assumptions and Qualifications
ASSUMPTIONS:
CGC: 010703
AA: 26001486
• Pricing is based on the plans and specifications dated December 21, 2018
• Pricing does not include Building 3. Plans where not received for Building 16, we were advised by the
CRA that it is constructed similarly to Building 6.
• The on -site water lines are serviceable.
• The on -site sanitary lines are serviceable.
• On Site Drainage Lines are serviceable
EXCLUSIONS AND QUALIFICATIONS:
1. Unforeseen subsurface conditions is excluded
2. HACC has excluded any asbestos remediation
3. All Public Right of way work is excluded
4. Relocation or upgrade of existing public utilities is excluded
5. LEED certification effort is excluded
6. Davis Bacon Wage Act is excluded
7. Liquidated Damages are excluded
8. New water laterals from meters to units is excluded
9. Relocation of unit Electric meter boxes is excluded
10. HACC excludes and upgrades to main FPL Meter Room
11. Remediation of Hazard soil conditions is excluded
12. Raising of finish floor elevation to comply with FEMA is excluded
13. Fire and Flood Insurance is not included is excluded
14. Off -loading, uncrating, storage, moving, handling and/or protection of Owner furnished items is not
included.
15. Any additional requirements imposed by Federal, State or Local governing agencies not specifically
addressed on the contracted documents are not included
16. Subcontractor overtime/premium time fees due to accelerated construction scheduling is not included in
this cost
17. New Traffic Lights or signal/s (if required) have not been included in this cost
18. Delays incurred by utilities suppliers such as but not limited to FPL, Bell South, water & sewer, gas co.
is not included.
19. Delays due to unexpected or uncontrollable events or Force Majeure such as: natural disasters
(earthquakes, hurricanes, floods and or excessively poor weather conditions), riots, or other upheaval,
unions etc.), server failures, software glitches, disputes over copyright owners etc. has not been included
in this cost analysis.
Miami Office: 9500 NW 12th Street, Bay I • Miami, FL 33172 • Phone (305) 591-9212 Fax (305) 591-9630
Broward Office: 1910 SW 100 Terrace, Unit G• Miramar, FL 33025 • Phone (954) 433-9311 Fax (954) 433-9312
Palm Beach Office: 941 S. Military Trail, F#4 *West Palm Beach, FL 33415 *Phone (561) 242-9484 Fax (561) 242-9485
www.haeontracting.com
H.A. Contracting Corp.
prodding qualit, construction services
CGC: 010703
AA: 26001486
20. Delays due to the discovery of historical or archaeological artifacts on the site is not included.
21. Development of indemnity clauses hold harmless clauses etc. for right-of-way paths, sidewalks,
roadways etc. are excluded.
22. HACC excludes delays due to tenants failing to relocate timely and as per the schedule provide to them
23. Salvage or relocation of existing items to be demolished (other than what is specifically called out on
plan) for others future use is not included unless otherwise stated on documents and or in the contracts is
excluded.
24. Fire Sprinkling of buildings is not included.
25. Tree Mitigation Cost as defined the City of Miami, is not Included in this proposal
26. Camera and Security Systems is not Included in this proposal
27. Phone/Data/Internet is not included in this proposal.
28. Any additional work that may be required by the City of Miami BLDG Dept., Miami Dade County
Building Dept., Miami Dade Water and Sewer, DERM, or FDEP that may arise during the permit
process or inspection process is excluded from this proposal.
29, H.A. Contracting Corp. has not included any additional Architectural/Engineering Fees
30. H.A Contracting Corp has not included in its proposal any site drainage, site lighting, and parking lot
work.
31, H.A. Contracting Corp. has not included the replacement of any exterior doors
32. H.A. Contracting Corp. has not included the replacement of the existing impact windows
33. H.A. Contracting Corp has not included any work to building 3
34. H.A. Contracting Corp has included and allowance for the Tennant Relocation
35. H.A. Contracting Corp has included a performance and payment bond
36. H.A. Contracting Corp. has included an allowance for permit cost.
37. H.A. Contracting Corp has not included any Fire Walls and/or Fire Proofing of Units
38. H.A. Contracting Corp. has not included any perimeter fencing work
39. H.A. Contracting Corp has not included a construction contingency
40, H.A. Contracting Corp. reserves the right to Value Engineer the project
Miami Office: 9500 NW 12th Street, Bay I • Miami, FL 33172 • Phone (305) 591-9212 Fax (305) 591-9630
Broward Office: 1910 SW 100 Terrace, Unit Go Miramar, FL 33025 • Phone (954) 433-9311 Fax (954) 433-9312
Pahn Beach Office: 941 S. Military Trail, F#4 *West Palm Beach, FL 33415 *Phone (561) 242-9484 Fax (561) 242-9485
www ,hacontracting.com
H.A. Contracting Cor
pros iding yua lit construction sen ices
CGC: 010703
AA: 26001486
Miami Office: 9500 NW 12th Street, Bay 1 • Miami, FL 33172 • Phone (305) 591-9212 Fax (305) 591-9630
Broward Office 1910 SW 100 Terrace, Unit G• Miramar, FL 33025 • Phone (954) 433-9311 Fax (954) 433-9312
Palm Beach Office: 941 S. Military Trail, F#4 oWest Palm Beach, FL 33415 *Phone (561) 242-9484 Fax (561) 242-9485
www hacontracting,com