Loading...
HomeMy WebLinkAboutCRA-R-20-0021 Back-upL.r=� PALM CONSTRUCTION AND DESIGN GROUP, INC. CONSTRUCTION PROPOSAL/CONTRACT Between the Owner: ST. AGNES EPISCOPAL CHURCH P.O. BOX 2943 Miami, FL 33101 And the Contractor: Palm Construction and Design Group, Inc. 12491 SW 134 Court, Ste. 20 Miami, FL 33186 786-251-9289 For the Project located: 1750 NW 3"' Avenue Miami, FL 33136 July 15, 2020 ST. AGNES EPISCOPAL CHURCH P.O. Box 2943 Miami, FI 33101 RE: Re -roofing, and Bathroom Addition to the Sanctuary Building Dear Owner: We are pleased to submit this proposal for construction services on the above referenced project located in Miami, Florida. Palm Construction and Design Group, Inc. will perform the work outlined below: MECHANICAL - Furnish and install new HVAC system as shown on the Mechanical Plans by Hyde Park Architects - Furnish and install new refrigerant lines and covers, drain lines, exhaust fans, duct work, and A/C stands as necessary - Furnish and install new metal cage for condenser unit on ground floor - No other mechanical work included in this proposal ELECTRICAL - Furnish and install new Electrical system as shown on the Mechanical Plans by Hyde Park Architects (including all new wiring, electric boxes, plugs, breakers, conduits, disconnect boxes, etc. to service new restroom addition) - No other electrical work is included in this proposal PLUMBING Furnish and install new Plumbing system as shown on the Plumbing Plans by Hyde Park Architects - Furnish and install five (5) new toilets, five (5) new wall hung lavatories, two (2) new urinals, five (5) new faucets, new water heaters, and ancillary piping - No other plumbing work is included in this proposal BATHROOM ADDITION - Furnish and install all items needed to construct the new bathroom addition as shown on the Architectural Plans by Hyde Park Architects - No other work is included in this proposal ROOF - Remove existing roof covering to expose existing sheathing - Replace existing sheathing as necessary - Install new roof covering (i.e. — asphaltic shingles, etc.) - No other roof work is included in this proposal METALS - Install new metal stair railings as shown on the Architectural Plans by Hyde Park Architects - No other metal work is included in this proposal A. Exclusions - Environmental services (i.e. — mold, lead, asbestos abatement, or remediation) - Security or police services - Permit fees - No other construction services not specified herein ST. AGNES EPISCOPAL CHURCH shall pay Palm Construction and Design Group, Inc. for the performance of completed work, as authorized and outlined by this agreement. The base bid is Four Hundred Thousand Dollars, ($400,000.00). Notes: 1. Palm Construction and Design Group, Inc. will furnish all the labor and material necessary to complete the alterations and improvements described in herein. 2. Match existing textures and colors as close as possible. 3. This proposal is based upon the observation of conditions. Conditions which could not be known by a reasonable inspection, such as termite damage, hidden water damage, hidden code violations, or other concealed conditions, may require extra labor or materials. Date: Signature: Owner �� Date: 7/15/20 Signature: ' � _ — Palm Construction and Design Group, Inc. cc: File