HomeMy WebLinkAboutCRA-R-22-0002 BackupHistoric Mt. Zion Church - 40 year Improvements
Expendentures Breakdown
Original 2015 Grant Amount $280,000
Expendeted Amount for Completed Work $149,853
Remaining Available Funds $130,147
Cost for Remaining/New 40 year Improvements $285,300
Cost for New Tile Roof $172,200
Total Cost for Remaining & New Work $457,500
Remaining Available Funds $130,147
Additional Funds Required $327,353
Contingency $22,647
Total Recommended Grant Amount $350,000
Legend
BOFAM CONSTRUCTION COMPANY, INC
_General Contractors, Estimators & Roofing Contractors_
CGC 062660 & CCC 1329221
(Certified DBE, CSBE, SECTION 3)
TEL: (754) 245-0102
FAX: (305) 675-9269
AUSTIN@BOFAMINC.COM
Date: December 10, 2021
Proposal: # B21-006-02
To: Ms. Linda Rogers
Historic Mt. Zion Miss. Church
Chairman, Trustee Board
301 NW 9` Street
Miami, FL 33136
305-613-2750 (Cell)
305-000-0000 (Fax)
E-mail: Lrogers747kbellsouth.net
Attention: Ms. Rogers,
1600 N.W 3RD AVENUE,
BLDG. D4
MIAMI, FL 33136
Mr. Brian Zeltsman
Community Redevelopment Agency
Director of Architectural & Dev
819 NW 2nd Avenue
Miami, FL 33136
305-679-6827 (Tel)
305-679-6835 (Fax)
E-mail: BZeltsmankmiamigov.com
We appreciate the opportunity to submit a proposal on your firm's project.
If you have any questions, please do not hesitate to contact me at (754) 245 — 0102
Respectfully, Austin Akinrin
Project: Mt. Zion Missionary Baptist Church Concrete Tile Re -roofing
Location: 301 NW 9th Street, Miami, FL 33136
Quotation:
CONCRETE ROOF TILE
Remove existing tile roof cover, including vent stacks, flashings, and edge drip. Replace any damaged sheathing
per specifications below. Install one layer of 304 felt base sheet nailed per code, Supply and install tile
underlayment per FBC. Install wood battens (If required). Install new concrete/clay roof tile carrying UL label
on package and approved by MDC product control division. Replace new vent stacks, flashings, and edge drip
(Color selection by Owner).
Base Price
Flat Cement Concrete Tile Re -roof $172,200
Payment: As agreed Specific Exclusions: TBD
This proposal may be withdrawn and/or revised in 15 days if not accepted the undersigned owner accepts the
above job at the price quoted and agrees to pay for said work as per agreed payment schedule specified herein.
Sincerely,
Austin Akinrin,
President
Page 1 of 2
BOFAM CONSTRUCTION COMPANY, INC
_General Contractors, Estimators & Roofing Contractors_
CGC 062660 & CCC 1329221
(Certified DBE, CSBE, SECTION 3)
TEL: (754) 245-0102
FAX: (305) 675-9269
AUSTIN@BOFAMINC.COM
Scone of Work:
1600 N.W 3RD AVENUE,
BLDG. D4
MIAMI, FL 33136
We propose to supply labor, material, equipment and accessories within the building footprint during normal working hours, 40 hour
workweek, to complete the below components per Florida Building Code Edition 2010 for the above sum as follows:
ROOFING:
1. One (1) layer of 30# felt base sheet
2. One (1) layer of 90# felt Underlayment
3. Provide and Install new Flat concrete rile
4. Replace damage sheathing (maximum 8 sheets)
5. Minor fascia board repair / replacement if needed
TERMS & CONDITIONS:
1. Bofam Construction Company, Inc. is not responsible for the repair of uneven roof sheathing or rafters, electrical,
plumbing, plastering, painting, air-conditioning, A/C supports, A/C pitch pans or solar heaters unless stated above.
2. Upon acceptance, this proposal shall become a contract binding upon both the owner/contractor and BCC, Inc. and
shall be construed according to the laws of the state of Florida and enforced in Miami -Dade County.
3. BCC, Inc. shall not be responsible for damages or delay either before commencement of or during the said work
described herein on account of transportation difficulties, priorities, strikes, accident, war, acts of God (fire, sudden
rains, storms, windstorms, and hurricane), other casualty or theft or other causes beyond BCC Inc. control.
4. It is mutually agreed that should the work be interrupted or delayed on account of factors beyond BCC. Inc. control
for a period of thirty days, BCC Inc. at its option, may bill the owner/contractor with the cost of all materials in
place, the total of all labor used in application work and/or estimating the work, and/or procuring the work, plus
35% of the sum of above items to cover overhead and profit.
5. New construction and re -roofing contract will have a Five-year guarantee, or as may be provided specifically in this
proposal. In no events shall such a guarantee imposed upon BCC. Inc. any liability for damages cost by fire,
tornado, hail, hurricane, or other extraordinary causes beyond BCC. Inc. control, nor for damages to the building
upon or/in which such work is done.
6. This agreement may be cancelled either before or after commencement of the work by mutual agreement of both
parties hereto and in such an event, the owner/contractor shall settle with BCC, Inc. as provided in paragraph
number seven (4).
7. Any alteration or deviation from the above specifications involving extra costs will be executed only upon written
order and will become an extra charge over and above the estimate.
This bid maybe withdrawn and/or revised in 30 days if not accepted the undersigned owner accepts the above job at the
price quoted and agrees to pay for said work as it progresses or as per agreed payment schedule specified herein.
In the event of legal dispute, If any sums due are collected by suit or demand of an attorney or collection agency then the
defaulting parry shall pay all costs, including reasonable attorney's fees.
Authorized Signature: Roofing Materials are commodity
based and priced at time of delivery; proposal price may increase due to material costs.
ACCEPTANCE OF PROPOSAL: The above prices, specifications and conditions are satisfactory and accepted. You are
authorized to do the work as specified and payments will be made as described above.
Date of Acceptance;
2021
Signature: X
Page 2 of 2
BOFAM CONSTRUCTION COMPANY, INC
_General Contractors, Estimators & Roofing Contractors_
CGC 062660 & CCC 1329221
(Certified DBE, CSBE, SECTION 3)
TEL: (754) 245-0102
FAX: (305) 675-9269
AUSTIN@BOFAMINC.COM
Date: January 18, 2022
Proposal: 9 B21-006-03
To: Ms. Linda Rogers
Historic Mt. Zion Miss. Church
Chairman, Trustee Board
301 NW 91' Street
Miami, FL 33136
305-613-2750 (Cell)
305-000-0000 (Fax)
E-mail: Lrogers747(a,bellsouth.net
Attention: Ms. Rogers,
1600 N.W 3RD AVENUE,
BLDG. D4
MIAMI, FL 33136
Mr. Brian Zeltsman
Community Redevelopment Agency
Director of Architectural & Dev
819 NW 2nd Avenue
Miami, FL 33136
305-679-6827 (Tel)
305-679-6835 (Fax)
E-mail: BZeltsmankmiamigov.com
We appreciate the opportunity to submit a proposal on your firm's project.
If you have any questions, please do not hesitate to contact me at (754) 245 — 0102
Respectfully, Austin Akinrm
Project: Mt. Zion Missionary Baptist Church 40-Year Recertification Repair & Improvements
Location: 301 NW 9th Street, Miami, FL 33136
Quotation:
Scope of work: Furnish all permits, labor, materials, equipment and services for the renovation, repair, and
improvement to include but not limited to complete the works per plans, 40-Year recertification, & code compliance.
Works work per Florida building codes and regulations.
Base Price
40-Year Structural & Electrical Recertification Repair S285,300
Payment: As agreed Specific Exclusions: TBD
This proposal may be withdrawn and/or revised in 15 days if not accepted the undersigned owner accepts the above
job at the price quoted and agrees to pay for said work as per agreed payment schedule specified herein.
Sincerely,
Austin Akmrin,
President.
ACCEPTANCE OF PROPOSAL: The above prices, specifications and conditions are satisfactory and accepted. You
are authorized to do the work as Specified and payments will be made as described above.
Date of Acceptance; / 2022 Signature:
Page 1 of 2
BOFAM CONSTRUCTION COMPANY, INC
_General Contractors, Estimators & Roofing Contractors_
CGC 062660 & CCC 1329221
TEL: (754) 245-0102
FAX: (305) 675-9269
AUSTIN@BOFAMINC.COM
(Certified DBE, CSBE, SECTION 3)
1600 N.W 3RD AVENUE,
BLDG. D4
MIAMI, FL 33136
Scope of Work
40 Year Certification
Mt. Zion Missionary Baptist Church
301 NW 9th St. Miami FL 33136
STRUCTURAL — 40 YR. RECERTIFICATION
- Provide new engineer 40-year report if required for permitting
- Evaluate and repair structural columns per engineer recommendations
- Repair East concrete stair deck soffit per engineer recommendations
- Waterproof North basement wall
- Shore and support east stair landing and repair concrete
- Form & pour concrete beam and soffit around the stairs east & south stairs
- Repair/ replaced damaged steps tiles on east & south stairs
- Repair and caulk main auditorium windows
- Apply paint finish to match as required.
- Furnish and repair per building structural recertification report
- Structural and safety shoring of columns and ceiling deck
- Remove existing auditorium ceiling and repair upon completion
ELECTRICAL — 40 YR. RECERTIFICATION
- Provide new engineer 40-year report if required for permitting
- Provide engineered photometric with lighting package
- Supply and install additional site lighting
- Repair all existing electrical system per NEC codes
- Excavate and install lighting poles (Using existing poles)
- Inspect and install all electrical upgrades, grounding, and safety signs
- Furnish and repair per building electrical recertification report.
Page 2 of 2
3130 NW 171" Street
Lauderhill, Florida 33311
East Coast Rigging & Scaffolding of Florida
8221 Main Street
Laurel, MD. 20724
Office 301-362-8801
Date: 01.13.22
Customer: Bofam Construction Co. Inc.
Attn: Austin Gbolahan Akinrin
1600 NW 31d Ave. Bldg. D4
Miami, FL 33136
Office:
Mobile: 754.245.0102
Email: Austin(&bofaminc.com
3130 NW 17"' Street
Lauderhill, FL 33311
FL Office 772-209-0541
Proposal No: HS2022-0113
Jobsite: The Historic Mt. Zion Church
301 NW 9d' Street
Miami, FL 33136
Proposed by: Heather Stewart
Mobile: 786.510.7113
Email: HStewart(a ecrscaffold.com
The following proposal provides prices, terms, and conditions on both sides hereof East Coast Rigging & ScaffoldiM of
Florida., (E.C.R.S. - FLA.) agrees to provide cost proposal to Bo/am Construction Co. Inc.. (Customer) to furnish equipment &
materials and installation/dismantle and inspection labor for the above referenced job as stated below.
• Shoring and required load capacities (Per OSHA and ANSI Standards) require a Professional Engineer
licensed in the state ofFlorida to provide stamped drawings that will note all compliance requirements of
the state of Florida and city of Miami Building Codes.
• Install specified wall bracing system as determined by P.E.— and is subject to insurance that concrete slab at
foundation level is on grade and supported on stable soil — by others.
• Provide ADD/ALTERNATE — for additional interior re -shoring to support structural columns during
surgical demolition of the structure being removed.
• All Wall Bracing will meet or exceed minimal standards associated with P.E. Stamped Drawings
• Duration of rental of equipment/materials for this project is anticipated to be One (1) year.
• Any permits/fees required — to be provided by others.
• No shoring is to be altered, relocated, or removed without the approval of the P.E. and the direct
supervision of field personnel from ECRS.
• Rental Rates for all equipment are based on a 28-calendar day cycle and begin once equipment is delivered.
• Rental cycle ends when the equipment is dismantled and removed.
• Any applicable sales/usage taxes required by the local jurisdiction ARE NOT included in this proposal.
• Pricing in this proposal is subject to field assessment and as -built drawings review by a structural engineer
and approved by Engineer of Record.
Scone of Work:
East Coast Rigging & Scaffolding of Florida proposes to Supply, Erect, & Dismantle — Per P.E. Stamped
Drawings — Shoring to support existing Pre -cast Beams for Column & Beam Repair Work as per Customer
Supplied Repair Work Drawing ff 21321 (S-1 & S-2) as well as Shoring needed under the stairs for Scope of work —
Pricing is Preliminary Until Engineer Drawings are produced. Shoring will also include inside the sanctuary to
reach up under the High RoofArea approx.. 27'H at a slope. Pricing is based off using side door for mobilization
into Sanctuary.
3130 NW 171h Street
Lauderhill, Florida 33311
Ref. Engineer Drawing: TBD
P.E. Stamped Drawings:
$
4,500.00 (Licensed in Florida)
Engineer Site Inspection:
$
500.00 (1 Site Inspection)
Equipment Rental:
$
2,294.00 (Per 28 Calendar Days)
Erection:
$
10,200.00 (Straight -time labor- top out)
Dismantle:
$
8,840.00 (Straight -time labor)
Freight Roundtrip:
$
500.00 (Round-trip)
Consumables:
$
348.89
Taxes:
$
2,223.96
Base Bid Net Costs Over Three (3) Months — $33,673.69 (Including applicable Taxes)
Scope of Work:
East Coast Rigging & Scaffolding of Florida proposes to Supply, Erect, & Dismantle — Systems Scaffold to
Reach the Underside of the Ceiling providing a Dance Floor area of approx. 875 Square Feet of area. Approx. 20 ft
High on a slope in the Sanctuary. Pricing is based off using side door for mobilization into Sanctuary.
Equipment Rental:
$
800.00 (Per 28 Calendar Days)
Mobilization:
$
880.00 (Straight- time labor)
Erection:
$
3,300.00 (Straight -time labor)
Dismantle:
$
3,300.00 (Straight -time labor)
Demobilization:
$
880.00 (Straight- time Labor)
Freight Roundtrip:
$
500.00 (Round-trip)
Consumables:
$
180.15
Taxes:
$
744.81
Base Bid Net Costs Over One (1) Months — $11,384.96 (Including applicable Taxes)
Proposal is Preliminary until Engineer Drawings are completed and subject to change based off Design and Calculations.
Customer Responsibility:
Customer must provide clear access into and out of the building. Customer to remove Pews in way of Shoring.
Customer to open up ceilings in area in which shoring will be located.
��
` �N�' � `� ^«�~'~'-
_
== _-_�'.___-
`, �,= '
_-- ~-~^__^_� -_ - -�
�yi a
tk ^
_. I
-fa
C'l .t ,
5� k-C,
I
2
.1",
t
r IW994
4N,