Loading...
HomeMy WebLinkAboutExhibit ACitp of fRiamt, July 16, 2021 EXHIBIT "A" David Jeffrey Holtzman 695 NE 59 St Miami, FL 33137 david.'rWacraxorn ARTHUR NORIEGA, V. City N/lanager MORNING ROSE SUBDIVISION - TENTATIVE PLAT #1982-A (FIRST RESUBMITTAL) LOCATED AT THE NORTHWEST CORNER OF NE 59 STREET AND NORTH BAYSHORE DRIVE Ladies and Gentlemen: The City of Miami Plat and Street Committee, at its meeting of July 2, 2021, APPROVED the above tentative plat subject to the following revisions being made to the tentative plat, additional information being provided and/or variances being granted. Please be advised that the processing of your tentative plat cannot proceed until these conditions and/or comments have been satisfied. Resilience and Public Works 1. Specify type of valve located within the reservation/easement area. 2. Notes for underground stormwater drainage a. Stormwater drainage underground information must be field verified. Delete or modify notes of no attempt to locate underground utilities. b. Delete or modify notes for (stormwater drainage) underground shown based on as -built only. 3. Provide corrections to underground stormwater drainage information. 4. Corner radius ad ' justment — written recommendations will be provided. 5. Provide compliance to the requirements of Resilience and Public Works Bulletin 51. Planning/Zoning 6. Provide verification from Zoning Department if any Unity of Title or other type of covenant in Planning and Zoning records is affecting the subject property. Contact Alicia Menardy of Zoning. 7. Remaining portion of existing structure is to comply with total aggregate side set -back requirements of 20% of the lot width. It is to be shown on the updated tentative plat prior to final plat. Updated tentative plat is to be reviewed by committee members. 8. Provide notes for the set -back requirement or its adjustment. 9. Provide updated Certificate of Appropriateness (COA). 10. Any demolition or new constructions is subject to COA that is to be reviewed and approved by Historic and Environmental Preservation Board (HEPB). Standard Comments for Street and/or Easement Vacation 11. A letter from the Miami -Dade Water and Sewer Department is required to determine if any adjustments to their facilities or easements are required. Standard Comments 12. Contact RPW Survey section for additional minor comments. DEPARTMENTOF RESILIENCE & PUBLIC WORKS 444 SW 2­1 Avonue, 811, Floor 'diami, FL 33130 / (305) 416-1200 / Fax: (305) 416-1278 flailing Address: P.O. Box 330708 Nliami, FL. 33233-0708 MORNING ROSE SUBDIVISION - TENTATIVE PLAT # 1982-A July 16, 2021 Page 2 of 3 11 Provide updated tentative plat prior to final plat submittal to be reviewed by Committee members for compliance to applicable City Codes. 14. Execution of Covenant for Postponement of Subdivision Improvements is required in cases where the required subdivision improvements are not completed. 15. Any covenants applicable to the subject property, as required for the Building permit application and/or as captured in the Opinion of Title submitted prior to Final Plat submittal, will need to be annotated in the Final Plat. 16. A letter from Comcast is required to determine if any adjustments to their facilities or easements are required. 17. Verify with Miami -Dade County that the proposed plat name is acceptable. 18. All encroachments across proposed tract and/or lot lines, including any underground encroachments, must be removed or resolved Linder all applicable codes prior to final plat submittal. 19. An Opinion of Title, in the City of Miami Opinion of Title form, must be provided at the time of final plat submittal. 20. Current backup documentation will be required for all who execute the final plat. A resolution for authority to execute documents and a Certificate of Good Standing from the Secretary of State are required, if applicable. 21. Tentative plat application must be made with Miami -Dade County after receiving approval from the City of Miami Plat and Street Committee. Provide a copy of the notice of action to Resilience and Public Works. 22. Be advised that an incomplete final plat package will not be accepted by the City of Miami, It is the owner's responsibility to work with his/her surveyor and attorney to assure that everything is in order before submitting the final plat package. 23. Be advised that if all requirements for scheduling the final plat for City Commission action are not in order, the final plat will not be scheduled for a City Commission meeting. 24. A letter of concurrency from Miami -Dade County School Board is required prior to the final plat approval (see contact sheet). The tentative plat name and tentative plat number must be included on the application form, 25. A letter from Miami -Dade Water and Sewer Department is required to release the final plat in connection with water and sewer service agreements. 26. Provide two 8 1/2" x I I" sketches of the division of the land; one sketch of the existing divisions before the plat is recorded and one sketch of the divisions after the plat is recorded. In addition to the above requirements, you should be aware of the following: I. State and local laws require the installation of various physical improvements in the public rights - of -way when property is platted. These subdivision improvements include paving, drainage, landscaping, sidewalks, etc. In some cases, this could represent a substantial investment on your part. REQUIRED: The submission of an electronic file of the tentative plat, in an AutoCAD, to the City ofMiami Resilience and Public Works Department, Development and Roadway Plans Section will EXPEDITE the preparation and enhance the ACCURACY of the subdivision improvement letter required for the final plat approval. 2. The alteration, relocation or installation of utilities such as storm and sanitary sewers, electric, telephone, water, etc., caused by this plat will be at the property owner's expense. Also, utility easements may be required on the property being platted. 3. A building permit will not be issued on the property being platted until the final plat is recorded or as authorized by the City of Miami Code Section 55-10(i). Also, the Temporary Certificate Occupancy and/or Certificate of Occupancy for any building construction will be issued only after all the required subdivision improvements have been completed. 4. Approval for fire flow requirements must be obtained from the Fire -Rescue Department prior to the issuance of a building permit. MORNING ROSE SUBDIVISION - TENTATIVE PLAT #1982-A July 16, 2021 Page 3 of 3 5. In order to mitigate problems associated with access and construction activities throughout the neighborhood, the contractor/developer is encouraged to notify the affected neighborhood residents, in writing, of the project starting and completion dates at the time of issuance of permits. The contractor/developer may coordinate the notification of residents with the local City of Miami NET Service Center. 6. Additional items must be provided to the City of Miami Department of Resilience and Public Works before the final plat is submitted to the City Commission for approval. You will be notified in writing as to what these items are. It is required that the applicant contacts the City of Miami Resilience and Public Works Survey Section to verify that all final plat submittal documents are complete prior to final plat submittal. 7. Tentative plat approval is only valid for 1(one) year and 6(six) months from the date of the Plat and Street Committee meeting at which time it was approved. If you have any questions concerning these requirements, please refer to the attached Sheet for the appropriate person to contact. Sincerely, SantanaDigitally signed by Santana, , Juvenal Juvenal Date: 2021.07.19 11:33:12 -04'00' Juvenal Santana, P.E., CFM Supervisor of Plats - Plat and Street Committee Director - Public Works Department of Resilience and Public Works AD/JS/AB/ab Enclosure: Contact Sheet Biscayne Engineering Attn.: Javier Morejon 529 W Flagler St Miami, FL 33 130 �d Plat and Street Committee Members Nzeribe Ihekwaba, Ph.D., P.E., Deputy City Manager Survey Development and Roadway Plans Central