Loading...
HomeMy WebLinkAboutSEOPW-CRA-R-03-0087Item 13 09/29/03 RESOLUTION NO. SEOPW/CRA R- 0 1 =. 8 7 A RESOLUTION OF THE BOARD OF DIRECTORS OF THE SOUTHEAST OVERTOWN/PARK WEST COMMUNITY REDEVELOPMENT AGENCY ("CRA") AUTHORIZING THE EXECUTIVE DIRECTOR TO EXECUTE AMENDMENT #1, IN A FORM ACCEPTABLE TO CRA GENERAL COUNSEL, TO THE GRANT AGREEMENT DATED DECEMBER 27, 2002 BETWEEN THE CRA AND ARENA SQUARE NORTH & SOUTH, LTD. PROVIDING REIMBURSEMENT FUNDING IN THE AMOUNT OF $/,800.00 FOR THE INSTALLATION OF ELEVATORS AT THE NEW ARENA SQUARE APARTMENT COMPLEX IN OVERTOWN AT 268 N.W. 11TH STREET AND 275 N.W. 10TH STREET, MIAMI, FLORIDA; CONTINGENT UPON THE SATISFACTORY REVIEW AND AUDIT OF THE RECORDS OF THE GRANTEE AS PROVIDED • IN ARTICLE II, SECTION 2.4 OF THE GRANT AGREEMENT; FUNDS TO BE ALLOCATED FROM SEOPW TIF FUND, ACCOUNT CODE NO. 689001.550108.6.860. WHEREAS, the Southeast Overtown/Park West Community Redevelopment Agency ("CRA") is responsible for supporting and carrying out community redevelopment activities and projects within its redevelopment area; and WHEREAS, New Arena Square North & South, LTD. has undertaken the renovation of the 122 unit New Arena Square apartment complex located at 268 N.W. 11th Street and 275 SE®PW/CRA 03- 87 Page 1 of 4 • N.W. loth Street in Overtown to provide housing to elderly and low to moderate income residents; and WHEREAS, in support of this project, the CPA provided a grant in the amount of $420,000.00 for fagade improvements; and WHEREAS, the builder encountered additional expenses in meeting the requirements of the Americans with Disabilities Act and is requesting further support in the amount of $344,425.00 for costs associated with the installation of elevators to provide increased access to elderly and handicapped residents; and is WHEREAS, the CRA's consulting engineer, T.Y. Lin/H.J. Ross has reviewed the additional costs incurred and found $337,800.00 to be a reasonable estimate of the cost of this work. NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE SOUTHEAST OVERTOWN/PARK WEST COMMUNITY REDEVELOPMENT AGENCY OF THE CITY OF MIAMI, FLORIDA: Section 1. The recitals and findings contained in h the Preamble to this Resolution are adopted by reference and incorporated herein as if fully set forth in this Section. • SEOPW/CRA ®3- 87 Page 2 of 4 • • 0 Section 2. The Executive Director is authorized to execute Amendment #1 to the Grant Agreement, dated December 27, 2002, between the CRA and New Arena Square North & South, LTD., in a form acceptable to the CRA General Counsel, to provide reimbursement funding in the amount of $3;7,800.00 for the installation of elevators at the New Arena Square Apartment complex located in Overtown at 268 N.W. 11th Street and 275 N.W. loth Street, Miami, Florida; contingent upon the satisfactory review and audit of the records of the Grantee as provided in Article II, Section 2.4 of the Grant Agreement. Section 3. Funds are to be allocated from SEOPW TIF Fund, "Construction In Progress," Account Code No. 689001.550108.6.860 Section 4. This Resolution shall become effective immediately upon its adoption. PASSED AND ADOPTED this 29th day of September, 2003. r' ARTHUR E. TEELE, JR., CHAIRMAN SEOPW/CRA 03- 87 Page 3 of 4 • • • ATTEST: PRISCILLA A. T OMPSON CLERK OF THE BOARD APPROVED TO FORM AND CORRECTNESS: J LARELL0 GEN RAL COUNSEL j by SE®PW/ CRA 03— '7 Page 4 of 4 SOUTHEAST OVERTOWN/PARK WEO & OMNI COMMUNITY REDEVELOPMENT AGENCIES ITEM 13 SEP 2 9 2003 Im INTER -OFFICE To:::• Chairman Arthur E. Teele, Jr. and Members of the CRA Board From:Frank K. Rollason Executive Director MEMORANDUM ��Date: SEP 29 2003File: %Subject: Elevator Reimbursement Recommendation Arena Square North and South Ltd. ..Enclosures: Resolution, Support Documentation Reimbursement of Elevator Installation Cost It is recommended that the Board of Directors of the Southeast Overtown/Park West Community Redevelopment Agency adopt the attached resolution authorizing the Executive Director to execute Amendment #1 of the Grant Agreement dated December 27, 2002, between the SEOPW/CRA and Arena Square North and South Ltd., to provide reimbursement funding in the amount of $337,800 with funds being allocated from funding source account code no. 6890001.550108.6.860 for the installation of elevators at the Arena Square Apartment Complex located in Overtown at 268 NW llth Street and 275 NW loth Street; subject to satisfactory review and audit of the records of the Grantee as provided for in Article II, Section 2.4 of the subject Grant Agreement. Justification: New Arena Square Apartments is a newly renovated 122 unit housing complex consisting of 100% affordable housing for elderly and low to moderate income residents. The Builder encountered additional expenses during the renovation when he was required to comply with the Americans with Disabilities Act which mandated the provision of elevator access for handicapped and elderly residents. Total project cost for the renovation of the 122 units was approximately $8 million. The CRA previously provided funds in the amount of $420,'000 for fagade improvements pursuant to a Grant Agreement executed December 27, 2002. If approved, this amendment increasing the grant by $337,800 would raise the CRA's total contribution to this project to 9.5% of the total project cost. The benefits to the community include access to quality, affordable housing for low income and elderly residents, prevention of dislocation of residents outside of Overtown, removal of slum and blight, the rejuvenation of the historic D.A. Dorsey Way Business Corridor`°through the renovation of the ground floor commercial space fronting NW 3rd Avenue, provisions of economic opportunity to minorities through the leasing of a substantial portion of the commercial space to minority business owners. The Developer submitted a request for funding in the amount SE®Pw/CRA F 1 L-J • of $344,425. Costs associated with the elevator installation were reviewed by the CRA's consulting engineer, TY Lin/HJ Ross which concluded that the construction cost estimate should not exceed $3347,800.00. Therefore, the CRA is ...,recommending reimbursement to :Arena__Square North and South LTD, in the amount of $337,800.00. FKR:CMAD: JV .Budgetary Impact: Funds were budgeted on May 19, 2003 to SEOPW TIF account code no: 689001.550108.6.860 Page 2 of 2 SEOPW/CRA 2 03® 8 AGENDA ITEO FINANCIAL INFORMATION FORM ITEM -13 E • CITY OF MIAMI COMMUNRY REDEVELOPMENT AGENCY SEOPW CRA CRA Board Meeting Date: SEF 290 .:;JJj CRA .Section: Construction/Building SEP 29 % L3 Brief description of CRA Agenda Item: Execute amendment #1 of the Grant Agreement dated December 27, 2002, between the SEOPW/CRA and Arena Square North and South Ltd to provide reimbursement funding in the amount of 8337.800. Project Number (if applicable): - SEOPW - Construction in Progress YES, there.are sufficient funds in Line Item: 689001 Index Code: 550108 Minor: 860 Amount: $337,800.00 NO (Complete the following source of funds information): Amount budgeted in the line item: $ Balance in the line item-: $ Amount needed in the line item: $ Sufficient funds will be transferred from the following line items: ACTION ACCOUNT NUMBER TOTAL Project No./Index/Minor Object From $ To $ From $ To $ ts: --" , Approved by: s�G Date: q a? CRA xecutive Director/Designee /\ti'V.`..\/.\:V.'\'\/.1'N�\h".\/'.ti'\.:'\.�`\i�\.�\N\V�\.\�:\^%�^'�\.^\'�\�/^W/:\nl\N':'\�/.'\V:ti~✓\i\V.'\%�.N\.til. \/�,��-\\\/\Vn: \'"�nl \' APPROVALS CRA Accounting Section CRA Finance Section Ver' ed b Verified by: Date: Date: O' R. 03 - Cti �4 � PROJECT BUDGET STATUS & FUNDING SUMMARY Project Name Arena Square Apartments Project Status Approved Construction Completed Date of Report 9/29/03 unginal— tsuaget Appropriation Estimated Revision Funding_ Funding Ordinance/Reso. Expenditure- Remaining Budget and Date Source Amount No. and Date to -Date Fund Balance $425,000.00 12/27/2002 SEOPW TIF $425,000.00 SEOPW #R-02-39 $410,000.00 $14,999.80 12/27/2002 $762,800.00 SEOPW TIF $337,800.00 Pending Board Approval 0.00 $352,799.80 9/29/2003 on 9/29/03 11 Ll Ll 22 03 12:19p H. J. Ross Associates Inc 30 671771 p.2 ,.'T • -LININTERNATIONAL/ H-J-ROSS • July 22, 2003 Frank K. Rollason, Executive Director City of Miami Community Redevelopment Agency 300 Biscayne Boulevard Way, Suite 430 Miami, FL 33131 RE: New Arena Square Apartments Elevators Dear Frank: We met with the owner and his contractor to review the work scope and pricing of the elevators. After confirming the actual work that was done, we have finalized our statement of probable construction cost to be $337,800. This supersedes all previous estimates and is our final statement for the elevator work. A -.copy of the estimate is attached for your information. Sincerely, C2�_ /'�� Charles K. Deeb, P.E. Vice President i G:\5S002391 CRA Misc\New Arena Square\Elevator Itr 07-22-03.docv- 201 Alhambra Circle, Suite 900 • Coral Gables, FL 33134 • Telephone: (305) 567-1888 • Facsimile:(305) 567-1771 SE®PW/CRA - • V r a r r a . i r New Arena Square Elevators Statement of Probable Construction Cost Date: 07/21 /03 -Item ,. - = Description Unit Unit Price Quantity Amount Elevator Unit_(3story) -------------------. EA ---------- $100,000 ------------ --- ------------- __2 __ _$200.000 - ----____1_ = 2 -------------- Exterior Glazing -__LS __ --------$10,000 2 ----------------- $20,000 ------------------ ----------- 3 ---------------------------------------------------- Elevator Pit --_EA __ __---___ $10,000 --------------- 2 ----------- _ $20;000 ----------------- ----------- 4 ---------------------------------------------------- Machine Room LS ----------- $8,000 =------------------ 1 ----------------- $8,000 ------------------ ----------- - 5 ---------------------------------------------------- Demolition & Restoration LS ----------- :: $15,000 -.------------------ ------------- __1--- -_- $15,000 ----- ----------- ---------------------------------------------------- General Conditions & Misc. __LS -- -- $26,300 -------------------- 1 ------------- --- $26,300 ------ -- ----- ----____6_ -------------------------------------------------- Walls -and Hallways_(Modification) _ LS_- ,_ _- _:$9,500 - - - _______________1 ---------- $9,500 _--_____7_ 8 Formwork, Concrete and Steel LS ----------- _. _=�_ ____$23,000 - - - - __ ____ _ 1 --- $23,000 ------------------ ----------- 9 ---------------------------------------------------- Roof ----- ---------------- ----LS--- -----------$5,000 ---------------1- -------$5,000 - - ----------- 10_ ----------------------------- Power Supply----------- ---------------------- -- _LS--- -=--------$6,500 - ---------------1- ---- $6,500 -- - ------- 11 _ - Plumbin�_�Drains� ___ _ -------------- ___ LS _ _ $4,500 ------------------ 1 ------------------ _ -_-_ $42500 TOTAL WJ (,UUU GA55002391 CRA Misc\Margaret Pace Park\[Consolidated Punch List 7-21-03 update.xis]Consolidated Punch List J • F, SI3OpW/C&6 2921 N.W. 6th Ave. Miami, FL 33127 Tel. (305) 571.8353 Fax (305) 571-8357 23-Apr-02 New Arena Square Apts. Re: 268 N.W. 11th St. 275 N.W. IOth St. Miami, FL 33136 Construction Cost Re: Change order for: Courtyard, elevators and sidewalk. Dear Salomon: As per your request. herewith please find a cost breakdown of what we have paid out for the above mention change order. Demolition of all the electrical rooms and storage areas located on the back walls of buildings 268 & 275 as well as the required demoliton in each building to accommodate the new hallways that serve the elevators in each building. In order to build the elevators and new hallways, we had to erect new CBS wal}s where the old partitions. The existing wood frame floor was also removed and a new reinforced concrete floor slab was constructed. . The elevator shafts were constructed as per building plans and permits, our cost for this item as well as the previously mention is as follows: Demolition & clean up during & after construction: Foundations for all the new construction: a. Excavation: b.. Form: 3 floors plus the roof on both sides (268 & 275) c. Pour: 3 floors plus the roof on both sides (268 & 275) d. Form removal: r �17,500.00 6,000.00 16,000.00 14,000.00 2,600.00 Elevators: New reinforced CBS walls and hallways: (three floors each building 268/275) 8,500.00 Beams & Columns: Elevators tower structure: a. Form, place steel, pour, form removal: 20,000.0.0 Roofing system modified membrane: 4,500.00 Elevators - hydraulic 2,500 lb load limit automatic 2.car group, intercom, glass cab, texture rubber floor, emergency power switching, position indicators: 135.1000.00 Elevator tower (2) glass and metal structure: 42,000.00 Power supply to elevators & machine rooms: 6,000.00 Construction of machine rooms (2) 3,500 each 2 = 7,000.00 Metal doors and frames: _ 1,600.00 Plumbing drains elevator towers and machine rooms: 4,000.00 First floor concrete slabs: Hallways form & pour includes stamped concrete and sidewalk from 1 Oth to 1 lth st. along 3rd ave: Exterior paint: Sub Total: P & O 15%: Total: Thank you for giving us the opportunity to bid your property. Braulio Gutierrez, Pres. 380000 299,500.00. 44,925.00 344,425.00 i