HomeMy WebLinkAboutSEOPW-CRA-R-03-0062•
ITEM S-5
JUL 15 2003
RESOLUTION NO. SEOPW/CRA R- fi ` 6 2
A RESOLUTION OF THE BOARD OF DIRECTORS
OF THE SOUTHEAST OVERTOWN/PARK WEST
COMMUNITY REDEVELOPMENT AGENCY
AUTHORIZING THE EXECUTIVE DIRECTOR TO
ISSUE A WORK ORDER, UNDER THE EXISTING
CONSTRUCTION MANAGER -AT -RISK CONTRACT
WITH MAGNUM CONSTRUCTION MANAGEMENT
CORP., D/B/A MCM CORP., FOR THE GRAND
PROMENADE INTERIM RENOVATION PROJECT IN
AN AMOUNT NOT TO EXCEED $500,000.00;
FUNDS TO BE ALLOCATED FROM ACCOUNT CODE
799126.452502.6.930.
WHEREAS, the Southeast Overtown/Park West Community
Redevelopment Agency ("CRA") is responsible for carrying
out community redevelopment activities and projects within
the Southeast Overtown/Park West redevelopment area in
accordance with the approved Redevelopment Plan; and
WHEREAS, by Resolution No. SEOPW/CRA 01-51, passed and
adopted on May 21, 2001, the CRA authorized the Executive
Director to execute a contract with Dover Kohl & Partners
for the design and planning of a Grand Promenade along the
old FEC right-of-way in the Park West entertainment
district; and
Page 1 of 3 SE®PW/CRA
03- 62
0 • ITEM S-5
JUL 15 2003
WHEREAS, while the conceptual design is finalized,
interim renovations are necessary to upgrade service,
maintain access, and ensure the safety of the public and
businesses utilizing the area; and
WHEREAS, on October 1, 2002, the CRA entered into a
contract for Construction Manager -at -Risk services with
Magnum Construction Management Corp., D/B/A MCM Corp.; and
WHEREAS, the CRA desires to award construction of the
interim renovations under its existing contract for
Construction Manager -at -Risk services as Community
Development funding currently available for the interim
renovations will be withdrawn before the final design and
formal bid process can be completed.
NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF
DIRECTORS OF SOUTHEAST OVERTOWN/PARK WEST COMMUNITY
REDEVELOPMENT AGENCY OF THE CITY OF MIAMI, FLORIDA:
Section 1. The recitals and findings contained in
the Preamble to this Resolution are adopted by reference
and incorporated herein as if fully set forth in this
Section.
Section 2. The Executive Director is authorized to
issue a Work Order to Magnum Construction Management Corp.,
D/B/A MCM Corp. under its existing Construction Manager -at -
Page 2 of 3 SEOPW/CRA
63- 62
ITEM
S-5
•
JUL
15 2003
Risk contract with the CRA for construction of the Grand
Promenade Interim Renovations in an amount not to exceed
$500,000.00.
Section 3. Funds are to be allocated from Account
Code No. 799126.452502.6.930.
Section 4. This Resolution shall become effective
immediately upon its adoption.
PASSED AND ADOPTED this //Jo day of July, 2003.
ART �R—E. TEELE. J R . , C RMAN
ATTEST:
6AAM- "I'l, &-. - ALW��
PRISCILLA A. THOMPSON
CLERK OF THE BOARD
APPROVED AS
er' VILARELLO
COUNSEL
FKR/JHV
CORRECTNESS:
Page 3 of 3
- SE®PW/CRtA
03- 62
ITEM S-5
SOUTHEAST OVERTOWN/PARK WEST JUL 15 2003AND OMNI
COMMUNITY REDEVELOPMENT AGENCIES
INTER -OFFICE MEMORANDUM .
To: Chairman Arthur E. Teele, Jr. and Date: July 07, 2003 File:
Members of the CRA Board
Subject: C M-at- Risk Work Order.
for the Grand Promenade
Interim Renovation Project
From: Frank K. Rollason References:
Executive Director
Enclosures:Resolution, Attachments
RECOMMENDATION:
It is recommended that the Board of Directors for the Southeast
Overtown/Park West CPA .approve the attached Resolution authorizing the
Executive Director to execute a Work Order under the existing
Construction Manager -at -Risk contract with Magnum Construction
Management Corporation, D/B/A/ MCM Corp., for the Grand Promenade
Interim Renovation project in an amount not to exceed $500,000.00.
JUSTIFICATION:
At the May 19, 2003, CRA Board of Director's meeting, Resolution No.
SEOPW/CRA R-03-55 (copy attached) was passed authorizing H.J. Ross
Associates to provide professional engineering services for the
preparation of construction documents and construction phase services
for an interim renovation project for the Grand Promenade. The next
phase of this project is to bring a contractor on board to perform the
actual work. The Administration is recommending the selection of MCM
Corp., from the already approved C M-at-Risk contracts approved by the
CRA Board of Directors, with a cap limit of $10,,000,000.00.
At the present time, the cost estimate for the entire construction phase
of the project is estimated at $472,000 by H.J. Ross Associates (see
attached June 5th e-mail with breakouts for each phase). The ultimate
scope of work will be finalized between H.J. Ross Associates. and
MCM Corp. prior to the actual Work Order being issued. It is necessary
to fast track this project because it is being funded by CD
dollars which are in jeopardy of being returned unless the project is
completed within the next few months.
FUNDING SOURCE: 9th Street Pedestrian Mall Expansion Project - CD funded
ACCOUNT CODE: 799126.452502.6.930
FKR/EM
SEOPW / CRA
3- 62
•
City of Miami Community Redevelopment Agency
Project Budget Status and Funding Summary
As of: 5/19/2003
PROJECT: Grand Promenade Interim Renovation Project - Design & Enaineerina
Status: Pending CRA Board Action at %uly 15 2003 Special Board Megtina
Original
Budget
Date:
Amended
Budget:
Date:
Funding
source(s):
Amount:
Legislation:
Date:
Expended
to:
Date:
Remaining
Balance:
Estimate:
$ 76,210.00
05/19/03
N/A
N/A
CDBG Capital
$ 7b,210.00
ISEOPW/CRA
05/19/03
$ -
$76,210.00
Improvement
03-55
$ 576,210.00
7/15/2003
CDBG Capital
$ 500,000.00
Pending $Improvement
Board ActioT7/15/2003
C J
=tr
CZCn
� be
G
•
•
•
CRY OF MIAMI
COMMUNITY REDEVELOPMENT AGENCY
SEOPW CRA
CRA Board Meeting Date:
ITEM S-5
AGENDA I1M JUL 15 2003
FINANCIAL INFORMATION FORM
AL 1 r-j 2ow
CRA Section: EnjzineerinL,
Brief description of CRA Agenda Item:
Execution of Work Order to Magnum Construction Manaqement
Corporation (MCM) for the Grand Promenade Interim Improvement
prof ect .
Project Number (if applicable): 799126
YES, there are sufficient funds in Line Item:
Index Code: 452502 Minor: 930 Amount: $500,000.00
NO (Complete the following source of funds information):
Amount budgeted in the line item: $
Balance in the line item: $
Amount needed in the line item:
Sufficient funds will be transferred from the following line items:
ACTION
I ACCOUNT NUMBER
TOTAL
Project No./Index/Minor Object
From
$
To
$
From
$
To
$
Comments:
Approved by: Date: 7 9 0 3
CRA Executive Director/Designee
APPROVALS ,y
Verified'by/
CRA Accounting Section
Date:v/
CRA Finance Section
Date: -71,�"�
0 3 r
Cl
62
Cdftpy
05/04/03
03 5 5
RESOLUTION SEOPW/CRA R-
A RESOLUTION OF THE BOARD OF. DIRECTORS
OF THE SOUTHEAST OVERTOWN/PARK WEST..
(SEOPW) COMMUNITY REDEVELOPMENT AGENCY ..
(CRA), AUTHORIZING THE EXECUTIVE .
DIRECTOR TO ENTER INTO AN AGREEMENT, .ON
AN EMERGENCY BASIS, WITH T.Y. LIN
INTERNATIONAL/H.J'. ROSS, IN A FORM
ACCEPTABLE TO GENERAL COUNSEL, TO
PROVIDE PROFESSIONAL ENGINEERING
SERVICES FOR THE PREPARATION OF
CONSTRUCTION DOCUMENTS AND CONSTRUCTION
PHASE SERVICES FOR THE PROJECT
ENTITLED: "GRAND PROMENADE INTERIM
IMPROVEMENT," AT A COST NOT TO EXCEED
$76,210.00, TO BE FUNDED FROM COMMUNITY
DEVELOPMENT BLOCK GRANT CAPITAL
IMPROVEMENT ACCOUNT CODE NO.
799126.452502.6.930.
WHEREAS, the SEOPW CRA is charged with removing slum
and blight within the Southeast Overtown/Park West
Community Redevelopment Area; and
WHEREAS, the creation of the Park West Entertainment
District has spawned major redevelopment in the Park West
area including several 24-hour night clubs along NW llth
Street; and
WHEREAS, the Grand Promenade occupies the former
railroad right-of-way located mid -block between loth and llth
streets from Biscayne Boulevard to Northwest l5t Avenue
Page 1 of 4 SEOpW/
03- 62
•
directly behind several of these 24-hour night clubs and is
currently functioning as an alleyway where garbage pick up
for these clubs takes place as well -as daytime parking; and
WHEREAS, club patrons actively use the Grand Promenade
at night as a "drop off" zone and as a place to socialize
in the fresh air; and
WHEREAS, the current run-down condition of the Grand
Promenade is not conducive and is dangerous to health,
welfare, and safety of the club patrons and the general
public; and
WHEREAS, the final update of the SEOPW Plan is still
underway and an interim improvement of the Grand Promenade
is now necessary to provide a safe and usable corridor for
the public and patrons of the entertainment establishments
presently in operation and those anticipated to be
completed shortly;
NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF
DIRECTORS OF THE SEOPW COMMUNITY REDEVELOPMENT AGENCY OF
THE CITY OF MIAMI; FLORIDA:
Section 1. The recitals and findings
contained in the Preamble to this Resolution are hereby
Page 2 of 4 SE®PW I CIK
63- 62
y
C 0 py
adopted b reference thereto and incorporated herein as if
P Y
fully set forth in this Section.
Section 2. The Board, of Directors.. of. the
Southeast Overtown/Park West. Community Redevelopment
Agency, hereby, authorizes the Executive Director to enter
into an agreement, on an emergency basis, with T.Y. Lin
International/H.J. Ross, in a form acceptable to General
Counsel, to provide professional engineering services for
the preparation of construction documents and construction
phase services for the "Grand Promenade. Interim
Improvement" Project.
Section 3. Initial to the Grand
remedial .improvements
Promenade will take place from NE 2nd Avenue to NW 1st Avenue
in order to provide a safe and usable corridor for the
public and patrons of the entertainment establishments
presently in operation and those anticipated to be
completed shortly.
Section 4. The fee for these professional
engineering services shall not exceed $76,210.00, to be
funded from Community Development Block Grant Capital
Improvement Account Code No. 799126.452502.6.930.
Section 5. This Resolution shall become effective
immediately upon its adoption.
Page 3 of 4 SE®PW/CRA
62
03-
i 5 copy.
PASSED AND ADOPTED this daY of 2003.
ARTH R E. TEELE, JR., HAIRMAN
ATTEST:
PRI6tILLA A. THOMPSON
CLERK OF THE BOARD
APPROVED A 0 ND CORRECTNESS:
f bRO VILARELLO
RAL COUNSEL
FKR:SG
•
Page 4 of 4 SEOPW/c .
3 G2
•
0
•
k U9% Ift Y
H. J. Ross Associates, Inc. WO
Engineers • Planners • Scientists ea&Vq SWU 250
GwW Ga6rei. FL 33134-3163 .
.?MVh me. (305) 367--IBU
Facibnat: (305) 567•)77J
April 25, 2003
Frank K Rollason, Executive Director
City of Miami Community Redevelopment Agency
300 Biscayne Boulevard Way, Suite 430
Miami, FL 33131
RE: . Promenade Engineering Fee Proposal
Dear Frank:
T.Y. Lin International / H.J. Ross appreciates the opportunity to submit this proposal to
provide professional engineering services for the preparation of construction documents
and construction phase services for the referenced project. Tire Scope of Services is
described in the attached Exhibit 'W'. We propose to accomplish this work for an
estimated fee of $76,210. A breakdown of the fees is shown in the attached Exhibit `B".
We look forward to working with you on this project and thank you for the opportunity.
Please call me if you haveany questions..
Sincerely,
T.Y. UN INTERNATIONAL / H. I ROBS
Charles K. Deeb, P.E.
Vice President
C." Oooxnenwsoon" fft pro.eoc SEOPW/CRC
�3 - 6 2 `�
COPYH.
J. Ross Associates, Inc. ;
0
Frank Ronasan
April 25, 2003
Page 2
EXMIT "A"
"SCOPE OF WORK"
1. PROJECT DESCRIPTION
The City of Miami Community Redevelopment Agency (CRA) proposes to reconstruct
the alleyway into a promenade between NW 901 Street and NW 10" Street from NW 1"
Avenue to NE V Avenue. T.Y. Lin International / H.J. Ross (TYL14M) will provide
design and construction documents for the improvements.
The construction will be accomplished by one _ of the.. Construction Managers under. .
contract with the CRA.
2. SCOPE OF WORK TO BE PERFORMED BY H. J. BOSS
The project will provide resurfacing of the existing.#ingle lane through the alley, curbs on
both sides of the lane, street/pedestrian lightning, and landscaping. Drainage will be
.accomplished by directing runoff into adjacent swales. The, specific work scope items
are:
2.1 Prepare construction documents limited to:
Cover Sbeet with Site Map.
• Demolition Plan (includes tree -removal).
• Paving and Grading Plan.
• Utility Adjustment Plan (minor adjustments to clear structures).
Maintenance of Traffic Thasing Plan.
• Landscape /'Hardscape Plan.
• Irrigation Plan: a
2.2 Coordination with utility companies.
2.3 Quantity calculations and a statadent of probable construction cost.
2.4 Technical Specifications will be provided on the plans.
Sp OpW/CRA
CAMy Voavww ee\Pmmena* tee padoc 0 3 -- 62
•
A
-H.. J. Ross Associates, Inc.. C 0 P. Y
Frank Rollason
April 25, 2003
Pap 3
2.5 Meetings with Owner, Jurisdictional Agencies,. and -the Buildink Department as
necessary.
2.6 Obtain plans approval from the City of Miami, Miami -Dade Department Of
Environmental Resource Management (DERM), and other jurisdictional agencies.
Provide responses and applicable revisions to comments from the agencies'.
review.
2.7 TYLLWR will review the bids provided by the CM and make recommendations
to the CRA.
2.8 Construction Management Services are based on a 12-week'construction period
plus 4 weeks of startup and closeout work. Services -are limited to:
* Conduct a preconstruction meeting.
* Plans interpretation and clarification.
* Respond to contractor's Requests.for Information OtM.
9 Review Shop Drawings.
* Perform weekly site visits (up to 12 each) during construction.
• Site observations.
• Prepare record drawings based on contractor's surveyed as -built plans..
3. ITEMS NOT INCLUDED
11 Environmental investigation for contamination or other environmental concerns
3.2 Materials testing (to be done by geotechnical film; TYLAIIJR.Will coordinate).
3.3 Permitting (by contractor).
3.4 Construction Phase Services other than those described" in Article 2 above.
4. INFORMATION TO BE PROVIDED TO TM "JR
4.1- Record drawings of any existing facilitie's.
4.2 Topographical survey.
S. ADDITIONAL SERVICES
Additional services not specifically described under "Scope of Work' will be
performed upon written approval and will be billed at the hourly rates per the
agreement.
C," VoamvmW5W2M Pwmen9ftVtoxwo& fee POAbC
SEOPW/CRK
03— 62
•
l COPY
H. J. Ross Associates, Inc.
Frank Rollason
Apr l.25, 2003
Page 4
6. SCHEDULE OF SERVICES
The work will commence upon receiving a signed agreement' and the necessary
information requested. We estimate that the design and preparation of .
constiuction documents will require 3 weeks to complete, excluding owner review
time.
SEOPW / CRA
c."0oasn&*s%ssooz39, a ► 4ade (w WoAK 03 .62
- ----- ------ - --------
-------- - ----
Pa PROPOSAL
Tdd
Hags
TOM
Cad
TAM1C8
NIL
air.
Mow
T .
Rate
Mews 112SAD
Rate
Hmm slosAms
Rate
Moo
Rats
"Owe P.00
Rats
if" AO
0
"_'1S
'a_
_._ ,
M
�
_...»431"o
. 3mm
...r.r.... �
.N1en._ ».......».
�i
_1e' _
:....»._.._.»...._.0
......_
�'� i3_
_ .fir
___ so_ _ ..gym
440
--so
».�.
_.....r
..._S'l
sK.hM«ia_I�rre�+�.!!al......._........_.
_...»._........_.._.£o.
so
_......
_.....�.._..?to.
4
.......
-_...»._.__.__ �
_ _ 3.
cm
......»»_.r.u.r]�.�.
_. so
_ _ w17
� MOR.......»_...»•»..
..
_» .... rti.
.r.r�.1•r
..•..... �.....u... J
_w..rr.rr�
».........-1. �......rS�..�..
r.._._.r_.r.r.�
.........r�r.»......�
.r..».._ ��
._. .r..._r..r..r.�r
lew Damn
1s
4t
2e SMe0
M2 mm272
! 40
ON
LrellflAes�ra
...
_......._....
.._.....
w..l
..
_. _
_ _�
... _.
_
_
-
_ _.
7Q.`'_ills
_._ �a ._^�
a
_ ..
.�. ._.
tleP,�k�__,_....,......_._.._....
a _. lm
��.._.._�.�
_� � . 3�
_
_ _
._ �igto
ela4 tal�nedlen
10
0
ea
32 7eo
!! an
low
TOTAL
1S
92 $11 P
28 7"
US S o
304 $I Tie
1 12
7381
e
SIM
� 10 twe sloe
SUVWTAL: sl,neo
A In x $71.00 s0
R 20 ' Ae 4* x 20 a 40 Me x s47 00 sle.eoo
R 0
SLINVOTAL• $1e,e00
ewe.�w.o�eeesrw ���M ORAfID TOTAL:
$1.40
steeee
±%d.2/0....
40
1 J
nawws wow
EXHIBIT "B"
•
SEOPW/CRA ITE'�'a
SEOPW/CRA
RESOLUTION NO. Q 1 - 51
A RESOLUTION OF THE BOARD OF DIRECTORS OF
THE SOUTHEAST OVERTOWN/PARK WEST COMMUNITY
REDEVELOPMENT AGENCY ("CRA") AUTHORIZING THE
EXECUTIVE DIRECTOR TO EXECUTE AN AGREEMENT,
IN A FORM ACCEPTABLE TO THE CITY ATTORNEY,
WITH DOVER, KOHL & PARTNERS, FOR AN AMOUNT
NOT TO EXCEED $50,000, FOR SERVICES TO:
PREPARE A COMPREHENSIVE MASTER PLAN FOR THE
OVERTOWN REDEVELOPMENT AREA ,("MASTER PLAN");
INTEGRATE INTO THE MASTER PLAN THE OFFICE OF
HOLLAND & KNIGHT WHICH CURRENTLY HAS ON
STAFF EXPERTS ON COMMUNITY REDEVELOPMENT
AGENCIES; INTEGRATE WRT INTO THE MASTER PLAN
FOR ADJUSTMENT OF THE BOUNDARIES, IF ANY, OF
THE REDEVELOPMENT AREA AND UPDATING OF THE
REDEVELOPMENT PLAN; PLAN AND DESIGN THE
GRAND PROMENADE; INTEGRATE PRIVATELY -OWNED
PROPERTIES ALONG BISCAYNE BOULEVARD, BETWEEN
I-395 AND NORTH EAST 6TH STREET, INTO THE
BICENTENNIAL MASTER PLAN; AND, FURTHER,
COORDINATE THE ON -GOING BICENTENNIAL
TRANSPORTATION PROJECT WITH THE DOWNTOWN
DEVELOPMENT AUTHORITY AND METROPOLITAN
PLANNING ORGANIZATION.
WHEREAS, the City of Miami approved and adopted the
Southeast Overtown/Park West Community Redevelopment Plan
pursuant to Resolutions No. 82-755 and 85-1247 (the
"Redevelopment Plan"); and
SEOPW / CRA
03- 62
WHEREAS, the CRA is
responsible for carrying
out community
redevelopment activities
and projects in the CRA
Redevelopment
Area established pursuant
to the Redevelopment Plan;
and
WHEREAS, the Board of Directors authorized the Executive
Director to utilize professional consultants for the conceptual
planning and design for .the Grand Promenade; and
WHEREAS, the CRA desires to enter into an agreement with
Dover, Kohl & Partners, a planning .firm, for an amount not. to
exceed $50,000.00 for the planning and design of the Grand
Promenade, as well as planning assistance to integrate' the
privately -owned properties along Biscayne Boulevard, between I-
395 and North East Gth Street, into the Bicentennial master plan
• and, 'further, to coordinate the on -going Bicentennial
g 9
Transportation Project with the Downtown Development Authority
(DDA) and Metropolitan Planning Organization (MPO)
NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF DIRECT09S OF
THE SOUTHEAST OVERTOWN/PARK WEST COMMUNITY REDEVELOPMENT AGENCY
OF THE CITY OF MIAMI, FLORIDA:
Section 1. The recitals and findings contained in the
Preamble to this Resolution are incorporated herein as if fully
set forth in this Section.
Section 2. The Board of Directors authorizes the
Executive Director to execute an agreement, in a form acceptable
to the City Attorney, with Dover, Kohl & Partners, for an amount
Page 2 of 3
not to exceed $50,000, for services to: prepare a comprehensive
master plan for the Overtown Redevelopment Area ("Master Plan");
integrate into the Master Plan the office of Holland & Knight
which currently has on staff experts on Community Redevelopment
Agencies; integrate WRT into the Master Plan for adjustment of
the boundaries of the Redevelopment Area and updating of the
Redevelopment Plan; plan and design the Grand Promenade, -
integrate privately -owned properties along Biscayne Boulevard,
between I-395 and North East 6th Street, into the Bicentennial
Master Plan and, further, coordinate the on -going Bicentennial
Transportation Project with the Downtown Development. Authority
and Metropolitan Planning -Organization.
Section 3. The Resolution shall be effective upon its
adoption.
PASSED AND ADOPTED on this. 216t day of May, 2001.
ARTHUR E. TEELE, JR., CHAIRMAN
ATTEST:
WALTER J-. FOEMAN
CITY CLERK
APPROVED WTO ,P,0RM- fiM CORRECTNESS:
AL VILARELLO
CI TORNEY
Page 3 of 3 SE®PWXRA-
03- 62
• CITY OF MIAMI, FLORIDA
TO: Chairman Teele and
Members of the CRA Board
FROM: Dipak M. Pare
Executive Director
RECOMMENDATION
INTER -OFFICE MEMORANDUM - REVISED SEOPW/CRA
DATE: May 21, 2001
FILE:
SUBJECT: Recommendation for a contract
agreement between CRA and Dover
Kohl & Partners, Planning Firm
REFERENCES:
ENCLOSURES:
Resolution
It is recommended that the CRA Board of Directors authorize the Executive Director to enter into a
contract agreement with Dover Kohl & Partners, a Planning Firm, for services to be provided in
connection with the planning and design of the Grand Promenade, as well as planning assistance to
integrate the private properties along Biscayne Boulevard between I-395 and NE 6`h Street into the
Bicentennial master plan and further to coordinate the ongoing Bicentennial Transportation project
with the Downtown Development Authority (DDA) and Metropolitan Planning Organization
(WO).
BACKGROUND
On December 18, 2000, the CRA Board authorized the Executive Director to utilize professional
consultants for the conceptional planning and design for a "Grand Promenade" from Biscayne Blvd
to Miami Avenue in the alley between 10" Street and II" Street pursuant to CRA resolution
SEOPW/CRA�-00-132.
The attached resolution grants the CRA Executive Director the authority to enter into a contract
with Dover Kohl & Partners for professional services to be provided in connection with "Grand
Promenade" as well as other ongoing Bicentennial Transportation Activities.
Funding Source: CD/ General Fund
Account Number: _
•
SEOPW AND OMNUCRA
CITY CLERK' S REPORT
MEETING DATE: May 21, 2001
ITEM 15 A RESOLUTION OF THE SOUTHEAST
OVERTOWN/PARK WEST COMMUNITY
REDEVELOPMENT AGENCY (THE "CRA')
AUTHORIZING THE • CRA TO ENTER INTO A
CONTRACT AGREEMENT WITH DOVER KOHL &
PARTNERS, A PLANNING FIRM,
("CONTRACTOR'), FOR AN AMOUNT NOT TO
EXCEED $50,000.00, FOR SERVICES TO BE
PROVIDED IN CONNECTION WITH THE
PLANNING AND DESIGN OF THE GRAND
PROMENADE, AS WELL AS PLANNING
ASSISTANCE TO INTEGRATE THE PRIVATE
PROPERTIES ALONG BISCAYNE BOULEVARD
0, BETWEEN I-395 AND N.E. 6TH STREET INTO THE
BICENTENNIAL MASTER PLAN, AND FURTHER
TO COORDINATE THE ONGOING BICENTENNIAL
TRANSPORTATION PROJECT WITH THE
DOWNTOWN DEVELOPMENT AUTHORITY
("DDA') AND THE METROPOLITAN PLANNING.
ORGANIZATION ("MPO').
MODIFY: SCOPE OF SERVICES TO INCLUDE
COMPREHENSIVE MASTER PLAN FOR THE.
OVERTOWN REDEVELOPMENT AREA;
FURTHER INTEGRATING HOLLAND &
EMGHT FIRM (NOT LOCAL OFFICE, BUT
OFFICE WHICH HAS EXPERTS ON CRAs) AND
WRT BE INTEGRATED. INTO THIS PLAN SO
THAT IT IS ONE BASIC SCOPE UNDER DOVER
AS IT RELATES TO THE ADJUSTMENT OF THE
BOUNDARIES, IF ANY, AND THE UPDATING OF
THE PLAN.
Page No. 23
SEOPW/CRA R-01-51
OMNUCRA R-01-11
MOVED: WINTON.
SECONDED: SANCHEZ
UNANIMOUS
SEOPW/CRA - ---
03- 62
;ITEM S-5
JUL 15 2003
Grant, Neko
From: Chuck Deeb [CDeeb@tylin-hjross.com]
Sent: Thursday, June 05, 2003 9:53 AM
To: Grant, Neko
Cc: Aollason, Frank; Villacorta, James H
Subject: Promenade Cost
Attached are detailed preliminary construction cost estimates for the three phases of the Grand
Promenade Interim Improvements. The cost summary is as follows:
Phase 1 $127,400 BLOCK ONE
20% Cont. $25,500
Total $152,900
Phase 2 $130,500 BLOCK TWO-
20% Cont. $26300
Total $156,600
Phase 3 $135,400 BLOCK THREE
20% Cont. $27,100
Total $162,500
Grand Total = $472,000
Chuck Deeb, P. E.
Vice President
T. Y. LIN International / H. J. ROSS
201 Alhambra Circle, Suite 900
Coral Gables, FL 33134
(305) 567-1888 Ext. 229 - Phone
(305) 567-1771 - Fax
SEOPW/CRA
6/12/2003
City of Miami CRA Date: 06/12/03
Grand Promenade Interim Improvements - Phase 1. TYLVHJR No. 550023.xx
North Miami Ave. to NE 1st Ave.
Item
Description
Unit
. Unit Price
Quantity
Amount
_____ 1_
Maintenance of Traffic
DAY
- $100.00
-----------22
--------$3
-----2
---------------------
Cle----- --- Grubbin
-- AC--
-----$2,000.00
------------ 2
--------$4,000.00
----- 3-
--------------------------------------------------------------------------------
----------
- --------------------
---------------
$0.00
-------------- --------
4
--------
Tree Relocation
--- - ---- -- -- --------------------------------------------------------------
-EA
---------
---------------------
---------------
- ------------- $0.00
5
--------
Tree Removal
--- - - - - - ---------------------------------------------------------------
EA
----------
$200.00
---------------------
- 5
_ _ $1,000.00
6
--------
Earthwork
-------------------------------------------------------------------------------
LS
----- -
_ $3,500.00
1
---------------
--------$3,500.00
---------
Type_ --- Stabilization_-LBR 40)(12"Thick------------------
-- SY--
-------------- ------
---------------
-
- $0.00
-----------------------
______8_
Limerock Base_L8")(Primed)
- - - - - - - ---------------------------------------
SY
----------
---------------------
---------------
$0.00
----------------- ------
__ 9_
Type S_III Asphaltic_ Concrete (1.1/2" Thick
SY
_ $5.00
_ 750
--------------
------- $3,750.00
----- 10_
Concrete Class I __ ------------------------------------------
CY
----------
---------------------
---------------
-
- _ - $0.00
11
Concrete Pavement (6" Thick)(dumpster_pads)----------
SY
$35.00
65
$2 275.00
12_
Catch Basin, Type D-------------------------------------------------
-- EA--
-----$.2,000.00
----------- -4
------- $8,000.00
13
Pipe Culvert L24"� -----------------------------------------------------
- LF
---------
- --------$35.00
----------60
-------$2,100.00
_ 14
Exfiltration Trench_(24")_In2ludes Ballast Rock _
------------------------- -
LF
_$85 00
_________100
-
$8,500.00
15
Concrete Curb & Gutter_LType"F")_____________________________
___LF
$14.00
975
$13 650.00
16
Concrete
- - - - --S-id-e-w-alk_(6" Thick)_ -' ---------------------------------
SY
-----$-2-8-.-0-0-
------95
---------
0
$2-'-6-6--0--.-0--
-----------
- -17
Fenci!lg ---------------------------------------------------------------------
---LF- -
---------$18.00
-----------80
--------$1,440.00
18
Sodding SPensacola Bahia)(Includin�_Waterin �
SY
$3.00
1,300
$3,900.00
19_
Adjust and/or Relocate Existing Fire Hydrant
-------------------------------
EA
- --- -
-------- ------
$0.00
----------------------
____20
Dumpster Enclosure
EA
$3 000.00
---------
6
---------------
18,000.00
------------------------
21
--- -
Sign Roadside i n_________
------dside S---------------------------------------- --- -
EA
$250.00
- - - - -
2
---------------
-------$500.00
---- 22_
Reflective Pavement Marker
- - - -------------------------------------------------------------------
EA
----------
$4.00
---------------------
20
---------------
------------- --
$80.00
------------------------
---23_
Pavement Markings--------------------------------------------------
--------------------------
---SF- -
---------------------
---------------
$0.00
------------------------
___ _24
Solid Traffic Stripe 6" (Pai-- -- -nted) ---------------------------------
-------
-- LF
_ - $1.00
-
980
---------------
$980.00
------------------------
25
Solid Traffic Stripe 8" (Painted)_
LF
$0.00
-26_
Solid Traffic Stripe 12"_(Painted) -------------------------------
LF
----- -
-----------------------
27
Solid Traffic Stripe 18"_(Painted_ -------------------------------
LF
----------
---------------------
_ _ ____-
$0.00
- --------------------
28_
Solid Traffic Stripe 24"_(Painted)................................
LF___
________ $3_.00
12
$36.00
- 29-
------------------------------------------------------
--------------------------
----------
---------------------
---------------
-------------- $0.00
30
Conduit L2" P.-V.C. Schedule 40)
--- --------------------------------
LF
----- -
_ - $5 00
500
---------------
$2,500.00
------------------------
31_
Service Load Center ( Secondary Voltage) _
------------------- - -
LS ---
$1,500.00
-------------------
1
---------------
$1 500 00
-- -- '-- =-
32
Pull_Box S Sidewalk)
EA _
_ _ $300.00
10
----- --
$3 000.00
-33
Light Pole Complete--------------------------------------------------
-- EA
_ _- $4,000.00
_ 8
$32,000.00
---34
Landscape--------------------------------------- -------------------------
LS --
--------
-----$8,000.00
------------1--
-------$8,000.00
_ 35
Irripation_ __ __ __ __
_LS
$3,000.00
1
$3 000 00
Sub Total $127,371.00
Contingency 20% $25,474.20
Total $152,845.20
ITEM S-5
JUL 15 2003
C:\DOCUME-1\ngrant\LOCALS-1\Temp\Grand Promenade Items.xls]Promenade
SE®PW/CRA
03 62
City of Miami CRA
Grand Promenade Interim Improvements -Phase 2
&E 1st Ave. to NE 2nd Ave.
® Date:
06/12/03
ITEM
S - 5
TYLVHJR No.
550023.xx
JUL .
1 5 2003
Item
Description
Unit
Unit Price
Quantity
FAmount
___ 1_
Maintenance of Traffic
DAY ----------$100.00
___________30
________$3,000.00
____2_
Clearin _and Grubbing_______________________________ _____________
AC
$2,000.00.
2
. $4 000.00
----- 3-
-------------------------------------------------------------------------------
----------
- -----
---------------
-------------- $0.00
4
--------
Tree Relocation
--------------------------------------------------------------------------------
EA
----------
---------------------
---------------
$0.00
------------------------
_ 5
Tree Removal _ _ __
- - -----------------------------------
_ EA
_ $200.00
5
--------------
$1,000.00
------------------------
____6-Earthwork
___________________
- - - - ----------------------------------------------
LS
----------
$3,500.00
---------------------
1
---------------
$3,500.00
------------------------
_ 7_
Type "B" Stabilization (LBR 40)(12"Thick________- ---------
SY .
----------
---------------------
_
_ $0.00
_ 8
Limerock Base i8")(Primed)
----------------------- --- --------------------------------------------------
SY
----------
---------------------
---------------
$0.00
-----------------------
____9
Type S _III Asphaltic Concrete i1 _i/2" Thickl _ ____
SY
$5.00
--------------------
750
---------------
$3,750.00
------------------------
_ _ 10 -
Concrete Class I
-- - -------------------------------------------------------------------------
CY
--- ------
---------------------
---------------
$0.00
------------------------
11
Concrete Pavement (6" ThickJ(dumipster pads)
-SY
$35.00
--------------------
65
---------------
$2 275.00
------------=-----------
12
Catch Basin, Type_D____________________
EA
$2,000.00
4
$8,00b.00
_ 13_
Pipe Culvert (24")-------------------------------------------- ---------
LF___
----- -
----------$35.00
60
-
2,100.00
----------- - -
_ 14_
_
Exfiltration Trench (24") Includes Ballast. Rock
- - - - ----------------------------------- -------------
LF
----------
$85.00
---------------------
100
--------------
$8 500.00
------------=------ --
15_
Concrete Curb & Gutter LType"F")_____________________________
LF
$14.00
980
$13,720.00
16_
Concrete_ Sidewalk i6" Thick
- - - - - - - - --------------------------------------------------
-SY
$28.00
-- -----------------
95
---------------
$2 660.00
-------- ------- --- ----
17_
Fencing______________________
LF
$18.00
250
$4,500.00
18
Sodding (Pensacola Bahia)(Includinip Watering)
SY
- ---
$3.00
---------------------
1,300
--------------
$3,900.00
------------------------
19
Adjust and/or Relocate Existing Fire Hydrant
EA
--------------------
---------------
---- $0.00
20
Dumipster Enclosure
- ---------------------------------
EA
----------
$3,000.00
---------------------
---------6
$18,000.00
21
Roadside Sign------- ------ ------ --------------------- --------------
---EA--
$250.00
2
$500,00
22_
Reflective Pavement Marker _
- - - - ---------------
EA
----- -
$4 00
20
_ $80.00
-23
Pavement Markings---------------------------------------------
- - - - - -----
SF
---- ---
---------------------
---------------
- -------- - -- $0.00
24_
Solid Traffic Stripe 6" (Painted)
-----------------------------------------------
LF_
----- -
_ _ $1 00
980
- - -
$980.00
------------------------
25
Solid Traffic Stripe 8" (Painted)
LF
$0.00
26_
Solid Traffic Stripe 12" (Painted)
-------------------------------------------------------------
LF
----------
---------------------
= --------------
$0.00
--------------------- --
27
--------
Solid Traffic Stripe 18"_(Painted)_ ------------------------------
-LF
--------------------
- ______________
_ $0.00
28_
Solid Traffic Stripe 24"_(Painted)
---------------------------------------
-_ LF _
_ __ ___ $3 00
_ 12
$36.00
29
$0:00
30
--------
_40�
Conduit--- - "- L2P.V.C_ Schedule --------------------
-- - - - -- -- - --- --- --- --- ---------------
LF
----- -
_ $5.00
500
$2,500.00
_ _ 31
Service Load Center (Secondary Voltage)_________________
_ _LS_
$1,500.00
1
$1 500.00
32
Pull Box S Sidewalk)
- --------------------------------------- -----------
- _ EA
_ $300.00
- - - - -
10
$3,000.00
_33
Light Pole Complete_____________________________________ ---
EA --
- -----------------
-----$4,000.00
___ 8_
$32,000.00
---34
Landscape----------------------------------------------------------- --
--
---LS---
- $8,000.00
--------------------
1
---------------
------------------ .00
$8,------
35_
--- t
Irrigation -----------------------------------------
LS
----------
-------------$3,000.00
-------
1
---------------
$3,000.00
------------------------
Sub Total
Contingency 20%
Total
C:\OOCUME-1\ngrant\LOCALS-1\TempIGrand Promenade Items.xis]Promenade
$130,501.00
$26,100.20
$156,601.20
SEOPW/CRA
3- 62
City of Miami CRA Date: 06/12/03
ITEM S-5
Grand Promenade Interim Improvements - Phase 3 TYLI/HJR No. 550023.xx
JUL i 5 %CC3
NW 1st Ave. to North Miami Ave.
Item
I Description
Unit
Unit Price
Quantity
Amount
1_
Maintenance of Traffic
--------- ---------------------------------------------------
DAY
---- - -
- _ _$100.00
- - - -
30
_ $3,000.00
------2_
---e----- -and Grubbing----------------------------------------------
--AC--
-----$2,000.00'
--------------
--------$4,000.00
____3_
Railroad_Track Demolition (Rail Cutting) ____________________
- -
_ LF
- ---
$10.00
---------------------
-_ 800
____ $8,000.00
_ 4_
Tree Relocation
- ---------------------------------------------------------
EA
----------
---------------------
---------------
- _ _ $0.00
5
---------
Tree Removal
--- - - - - -----------------------------------------------------------------
EA
----- -
___ $200.00
_ _ 5
_ $1,000.00
-----6_
Earthwork---------------------------------------------------------- ------
LS
----------
--_$3,500.
--00
1
---------------
50000
-------$3,.
- ---
7_
Type "B" Stabilization (LBR 402"Thic---------
--SY
---------
---------------
$0.00
------------------------
8
---------
Limerock Base_f8")(Primed)
--- - ---------- -- - --- - ---- - ------------------------------------------
SY
----------
---------------------
---------------
$0.00
------ 9
Thick) _______________
SY
$5.00
550
--------------
$2,750.00
------------------------
10 -
Concrete Class I
-- - - ----------- -----------------------------------------------------------
CY
----------
---------------------
---------------
$0.00
----- 11
Concrete Pavement (6" ThicMdumpster_pads)
SY
$35.00
65
$2 275.00
12
Catch Basin, Type D----------------------------------------------------EA__
$2,000.00
4
$8,000.00
13
Pipe Culver t (24")
-- -----------------------------------------------------
-LF
$35.00
--------------------
60
---------------
$2,100W
------------------------
14
Exfiltration Trench_(24")_Includes Ballast Rock
LF
_$85 00
100
$8,500.00
15_
Concrete Curb & Gutter_�Type"F"1_____________________________
------------
___LF__
$14.00
--------------------
-_980
_ _$13,720.00
16
Concrete Sidewalk-(6" Thick)_____________________________________
_ SY__
__________$28 00
_ _95
________$----- 00
- 17
Fencing--------------------------------------------------------------------
---LF -
- $18.00
150
$2,700.00
_- 18
Sodding_SPensacola Bahia)�Includinip Watering)______
SY ---
$3.00
---------------------
- 1,200
$3,600.00
-----------------------
19
Adjust and/or Relocate Existing Fire Hydrant
EA
--------------------
---------------
--$0.00
---- 20
Dumpster Enclosure ____________________ --------------------
EA
----------
------ $_$18
- -________ 6
_____,000.00-----------
21
Roadside S'
Roadside Sign__________________________________________________________
___EA
- ---
$250.00
---------------------
2
---------------
$500.00
------------------ .00
___22
Reflective Pavement Marker______________________________________
___EA
_ _ -$4.00
20_
___________ _$80.00
--- 23
Pavement Markings...............................................SF
- ----
----------
---------------------
---------------
------------- $0.00
_-__24_
Solid Traffic Stripe 6" (Painted)_ ---------------------------------
-LF
_ __ $1 00
980
--------------
$980.00
------------------------
25_
Solid Traffic Stripe 8" (Painted)_________________ - ____ ---------
LF
----------
---------------------
---------------
----------- $0.00
26_
Solid Traffic Stripe 12"_(Painted)------------------ --------------
LF
---------
---------------------
---------------
$0.00
-------------------- --
27
Solid Traffic Strpe 18"_(Paintedj_ -------------------------------
LF
----------
---------------------
---------------
$0.00
------------------------
28
Solid Traffic Stripe 24" (Paintegl ..................
_- LF
_ _ $3_ .0.0
_ _ 12
$36.00
---- 2--9 -
- --------------------------------------------------
----------
---------------------
---------------
$0.00
------------------------
30
Conduit 2" P.V.C. Schedule_40 ___________________ _
LF_
$5.00
500
$2 500.00 .
31
Service Load Center (Secondary Voltage) _
_ LS _
_ $1,500.00
-
1
---------------
$1 500.00
------------------ -- --
32
-
Pull Box-( Sidewalk)
- - - ---------------------------------------------------
-EA _
$300.00
--------------------
-_ _10
$3,000.00
33_
Light Pole Complete___ ______________________ __ _
EA
- ---
$4,000.00
---------------------
_8
- -
$32,000.00
------------------------
34
Landscape_________________________________________ -----------------------
LS___
----- -
_____$8,000.00
1
--------------
$8,000.00
------------------------
- -35
Irriation-----------------------------------------------------------------
- --LS---
- $3,000.00
--------------------
------------1--
- $3,000.00
-----------------------
Sub Total
Contingency 20%
Total
C:\DOCUME-1Mgtant\LOCALS-1\TempIGrand Promenade Items.xis)Promenade
$135,401.00
$27,080.20
$162,481.20
SE®PW/CRA
03- 62