HomeMy WebLinkAboutSEOPW-CRA-R-03-0044ITEM 15
RESOLUTION NO. SEOPW/CRA R- 0 44
A RESOLUTION OF THE BOARD OF DIRECTORS OF
THE SOUTHEAST OVERTOWN/PARK WEST COMMUNITY
REDEVELOPMENT AGENCY (THE "CPA") AUTHORIZING
THE EXECUTIVE DIRECTOR TO ISSUE A WORK ORDER
UNDER THE CRA'S CONTRACT WITH METRIC
ENGINEERING, INC. FOR CONSTRUCTION PHASE
SERVICES, AS DESCRIBED IN THE ATTACHED
EXHIBIT "A", IN CONNECTION WITH THE
CONSTRUCTION OF THE 9th STREET PEDESTRIAN
MALL BETWEEN N.W. 2ID AND N.W. 3R1 AVENUES, IN
AN AMOUNT NOT TO EXCEED $43,0515.00 FROM
ACCOUNT NUMBER 799126.452502.6.930, CDBG
CAPITAL IMPROVEMENTS.
WHEREAS, the design and construction of the 9th Street
Pedestrian Mall is a part of the Southeast Overtown/Park West
redevelopment project; and
WHEREAS, the Board of Directors has accepted the bid .of
Community Asphalt Corporation for construction of the 9th Street
Pedestrian Mall between N.W. 2nd and N.W. 3rd avenues in
accordance with the plans prepared by Metric Engineering, Inc.;
and,
Page 1 of 3 $Eopw/CR.A
03- 44
WHEREAS the 'Southeast Overtown/Park WEST Community
Redevelopment Agency (the "CRA") desires to retain the engineer
of record, Metric Engineering, Inc., perform construction phase
services in connection with the construction.
NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF DIRECTORS OF
THE SOUTHEAST OVERTOWN/PARK WEST COMMUNITY REDEVELOPMENT AGENCY
OF THE CITY OF MIAMI, FLORIDA:
Section 1. The recitals and findings contained in the
Preamble to this Resolution are adopted and incorporated herein
as if fully set forth in this Section.
Section 2. The Board of Directors hereby authorize the
Executive Director to issue a Work Order under the CRA's
contract with Metric Engineering, Inc. for construction phase
services as described in the attached Exhibit "A", in -connection
with the construction of the 9th Street Pedestrian Mall between
N.W. 2nd and N.W. 3rd avenues, in an amount not to exceed
$43,055.00 from Account Number 799126.452502.6.930, CDBG Capital
Improvements.
Section 3. This Resolution shall be effective upon its
adoption.
Page 2 of 3 SEOPW/CRA
3- 44
0
E
PASSED AND ADOPTED this 2 thK-f
April,
2003.
ART
UR
E.
TEELE,
JR.,. CHAI MAN
ATTEST:
PRISCILLA A. THOMPSON,
CLERK OF THE BOARD
APPROVErW.T6 FORM AND CORRECTNESS:
ANDRO VILARELLO
RAL COUNSEL
FKR:EM
Page 3 of 3 SE®PW/CIA
03- 44
CITY OF MIAMI, FLORIDA
INTER -OFFICE MEMORANDUM
ITEM 15
0D: Honorable Arthur E. Teele, Jr., Chairman DATE:
& Members of the CRA Board
SUBJECT
FROM: REFERENCES:
Frank K. Rollason
Executive Director ENCLOSURES:
Community Redevelopment Agency
RECOMMENDATION:
April 16, 2003 FILE:
Approving Issuance of Work Order
Metric Engineering/91' Street Mall
4/28/03 CRA Board Agenda
It is recommended that the Board of Directors approve the attached Resolution
authorizing the Executive Director to issue a work order to Metric Engineering in an
amount not to exceed $43,055.00 for overseeing the design portion of the construction
phase of the 9th Street Pedestrian Mall Project between NW 2nd and 3rd Avenues;
services to include preparation of record drawings and coordination of design
installations.
JUSTIFICATION:
In that Metric Engineering prepared the design drawings and plans in conjunction with
WRT and in that the project requires oversight on the design portion of the installation,
we are recommending that Metric Engineering be authorized to continue with the project
until its completion. Metric Engineering will work hand -in -hand with our Engineering
Consultant, H. J. Ross, in seeing this phase of the 9th Street Pedestrian Mall to a
successful conclusion.
FUNDING SOURCE: CDBG Capital Improvement
ACCOUNT NUMBER: 799126.452502.6.930
FKR: sg
SECT I CRA
03-° 44,
®
'EXHIBIT
"A"
ITEM
15
File: Proposal
April 16, 2003
CITY OF MIAMI
Community Redevelopment Agency
300 Biscayne Blvd. Way, Suite 430
Miami, Florida 33131
Attention: Mr. Frank Rollason
Executive Director
Reference: Proposal for Additional Services
"NW 9t" Street Pedestrian Mall "
Dear Mr. Rollason:
We thank you for the opportunity to participate in the proposed improvements for the
referenced project. Enclosed for your review and approval is a copy of the proposed
Scope of Services and associated fees for this project. We will commence with our
assignment after your final review and acceptance of this proposal and upon receipt of a
written Notice to Proceed from your office.
Should you have any questions, comments or require additional information, please let
us know at your earliest convenience.
Sincerely,
METRIC ENGINEERING, INC.
JULIO M. MENACHE
Project Manager
JM/jm
Fax Copy: Chuck Deeb, P.E. (H. J. Ross)
Copy: Benny Gonzalez, P.E.
Manuel Sauleda, P.E.
SEOPW/CRA
0 3 - 44
•
•
CITY OF MIAMI
Community Redevelopment Agency
PROPOSAL
for
Additional Services - "NW 9th Street Pedestrian Mall
April 16, 2003
':• :. ta gpol►
The City of Miami Community Redevelopment Agency (Client) is proposing to procure
additional engineering services during the Construction Phase of the "NW 9th Street Pedestrian
Mall" that extends from NW 2"d Avenue to NW 3rd Avenue. Metric Engineering, Inc. (Engineer)
will participate in the project in accordance with the following Scope of Services:
SCOPE OF SERVICES
TASK 01: CONSTRUCTION SERVICES
The Engineer will provide assistance to the Client during the Construction Phase of the project,
based on a FOUR MONTH construction period.
a. Attend pre -construction conference with the Client and selected contractor.
b. Review shop drawings for the proposed improvements.
c. Respond to Requests for Information submitted by the Contractor and issue clarification of
the construction documents, if needed:
d. Attend up to sixteen (16) scheduled construction progress meetings.
e. Perform periodic construction observations (limited to a maximum of two (2) site visits per
week) coordinated with the Contractor's schedule, to observe the general status and
progress of the work. Write and distribute construction observation report after each site
visit.
f. Perform a Substantial Completion site visit and prepare; in conjunction with the Client's
Project Manager, a Punch List of any discrepancies.
g. Perform a Final Construction Observation to ensure satisfactory completion of all items in
the Punch List.
h. Prepare and submit one set of reproducible Record Drawings to the Client, based on signed
and sealed as -built information provided by a Florida registered land surveyor retained by
the Contractor.
2 SEOPW/CRA
CADocuments and SettingsWrollason\Local Settingffemporary Intemet Files\OLK226\proposal constmction 4 16 03 doc
Compensation will be on a "Not to Exceed Fee" basis as stipulated in Section 10-B of the
Professional Services Agreement between The City of Miami and Metric Engineering, Inc. dated
May 13th, 2002, (Resolution No. 02-144). The projected Engineer's budget for the proposed
scope of work is shown in the attached Engineering Fee Estimate. The Engineer will submit
monthly invoices to the Client for services rendered and costs incurred.
a) Construction Observations by the Engineer are limited. to observing the work and materials
that are to become part of a completed project in conformance with the approved
construction documents. Construction Contract Management and Safety Engineering is to
be performed by others and is not part of the Scope of Services. The Engineer will not be
held responsible for construction means, methods, techniques, sequences, procedures, or
for safety precautions and safety programs connected with the work, since these are the
Contractor's responsibilities.
- END -
SEOPW/CRC
CADocurnents and SettingsWrollason\Local Settings\Temporary Internet Files\OLK226\proposal construction 4 16 03.doe
03- 44
R
ENGINEERING FEE ESTIMATE
CITY OF MIAMI COMMUNITY REDEVELOPMENT AGENCY
Metric Engineering, Inc.
13940 S.W. 136th Street, Suite 200
NW 9th STREET PEDESTRIAN MALL (ADDITIONAL SERVICES)
Miami, Florida 33186
CONSTRUCTION SERVICES
(305)235-5098
NW 9TH STREET PEDESTRIAN MALL ( From NW 2ND AVENUE TO NW 3RD AVENUE) .
Project
Project
Cost
NO. / ACTIVITY
Manager
Engineer
Technician
Clerical
Hours
For
Activity
$120.00
$86.00
$60.00
$40.00
TASK 1: CONSTRUCTION SERVICES
23.00
211.00
44.00
18
296
$24,055.00
0
$0.00
0
$0.00
TOTAL MANHOURS
23
211
44
18
296
$24,055.00
TOTAL SALARY COSTS
OS S
2 760.00
$17,935.00
$2,640.00
720. 0
0
TOTAL CONTRACT FEE
COMPUTATION
(Check Appropriate Box)
Other Costs:
[ X] Estimate (4/16/03)
Total Activity Salary Costc
$24,055.00
a) Subconsultant Services (Wallace, Roberts, Todd, LLC.)
Task 1:
$19,000.00
Other Costs, a). Subconsultant Services (WRT)
$19,000.00
If revised estimate, give reason
for revisions:
Total
$43,055.00
TOTAL:
$19,000.00
TOTAL
$43,055.00
a�
bTOTAL
C�
ESTIMATED BUDGE
$43��rjrj,Q0
Revised by:
Prepared By: JULIO MENACHE
Date: 04/16/03