ITEM 15
i
RESOLUTION SEOPW/CRA R- 0 3 25
A RESOLUTION OF THE BOARD DIRECTORS OF THE SOUTHEAST
OVERTOWN/PARK WEST COMMUNITY REDEVELOPMENT AGENCY (THE
SEOPW "CRA") AUTHORIZING THE EXECUTIVE DIRECTOR TO EXECUTE
A CHANGE ORDER IN THE AMOUNT OF $17,427.00 FOR ADDITIONAL
WORK REQUIRED ON THE FENCE AT FREDERICK DOUGLASS
ELEMENTARY SCHOOL; FURTHER AUTHORIZING THE EXECUTIVE
DIRECTOR TO EXECUTE.,.A TWO-PARTY CHECK TO EFFECTIVE
IRONWORKS, INC. AND TLMC ENTERPRISES, INC. PROVIDED THAT THE
CRA RECEIVE A FINAL RELEASE FROM EFFECTIVE IRONWORKS.
WHEREAS, the CRA entered into an agreement with general contractor TLMC Enterprises, Inc.
for the construction of parking lot P-2; and
WHEREAS, the CRA by resolutions SEOPW/CRA R-01-52 and R-01-87 expanded the scope of
work to include construction of a fence at Frederick Douglass Elementary; and
WHEREAS, construction of the fence has required performance of additional work by the
fencing subcontractor, Effective Ironworks, Inc., who has applied for a change order for the increased
cost of its performance; and
WHEREAS, H.J. Ross, the CRA's consulting engineer, has reviewed the request and approved
$17,427.00 of the requested changes; and
WHEREAS, the CRA and the general contractor are in not in agreement as to the amount owed
the general contactor under the original contract but agree the subcontractor is entitled to this change
order and have agreed to payment by two-party check.
NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE
SOUTHEAST OVERTOWN/PARK WEST COMMUNITY REDEVELOPMENT AGENCY OF
THE CITY OF MIAMI, FLORIDA:
Section 1. The recitals and findings contained in the Preamble to this Resolution are
incorporated herein as if fully set forth in this Section.
Section 2. That Board of Directors of the CRA hereby authorize the Executive Director to
execute a change order in the amount of $17,427.00 for additional work on the fence at Frederick
Douglass Elementary and to execute a two party check to Effective Ironworks, Inc. and TLMC
Enterprises, Inc., provided that the CRA receive a final release from Effective Ironworks.
SEOPW/CRA
03- 25
Section 3. This Resolution shall be effective upon its adoption.
PASSED AND ADOPTED this 3 1 " day of March, 2003.
ARTItJR E. TEELE, JR., CHAI AN
M
CLERK OF THE BOARD
NOTE: Expenditure authorized by this resolution is funded by CRA SEOPW TIF -
Account Code No. 689001.550108.6.860 — Construction in Progress.
(See Attached Financial Information Form)
Frank K. Rollason, Executive Director
Community Redevelopment Agency
SEOPW/CR.A
03- 25
AGENDAI&
FINANCIAL INFORMATION FORM
CITY OF MIAMI
COMMUNITY REDEVELOPMENT AGENCY
EOPW C or OMNI CRA (if applicable)
CRA Board Meeting Date: March 31, 2003
CRA Section: Finance & Administration
Brief description of CRA Agenda Item:
Change Order in the amount of $17,427.00 for additional work at Frederick Douglass
Elementary School — Fence. (Item 15 on 3/31/03 Agenda).
Project Number: 689001
YES, there are sufficient funds in Line Item:
Index Code: 550108 Minor: 860 Amount: $17,427
❑ NO (Complete the following source of funds
information):
Amount budgeted in the line item: $
Balance in the line item: $
Amount needed in the line item: $
Sufficient funds will be transferred from the following line items:
ACTION
I ACCOUNT NUMBER
TOTAL
Project No./Index/Minor Object
From
$
To
$
From
$
To
$
Comments:
Approved by: Date: VFZO-3
CRA Executive Director/Designee
.n����ivv�.M,�v�n �nr`�:;`M'�iv�,view✓vv�'�v�M��"�tiv�i.�✓�tii�v�M�v�nn�Mi�ti�Mw� w�vv�n� .� ��n�
APPROVALS
CRA Accounting Section
Date: �-�;Ixev
Verified b
CITA Finance Section
Date: Y/7/CO-OPW/CRA
ITEM 15
• CITY OF MIAMI, FLORIDA
INTER -OFFICE MEMORANDUM
To: Chairman Arthur E. Teele, Jr. and Date: March 13, 2003 File:
Members of the CRA Board
Subject: Change Order - Frederick
Douglass Fencing
f
From: Frank`'. Rollason References:
CRA Executive Director
Enclosures: Resolution/Support
Documentation
RECOMMENDATION:
It is respectfully recommended that the CRA Board of Directors adopt the attached resolution
authorizing a change order in the amount of $17,427.00 for additional work performed by the fencing
subcontractor at Frederick Douglass Elementary School; further, authorizing the Executive Director to
execute a two-party check to Effective Ironworks, Inc. and TLMC Enterprises, Inc., provided that the
CRA receive a final release from Effective Ironworks, Inc.
• JUSTIFICATION:
•
The CRA entered into an agreement with general contractor TLMC Enterprises, Inc. for the construction
of parking lot P-2. By Resolutions SEOPW/CRA R-01-52 and R-01-87 the CRA expanded the scope of
work to include construction of a fence at Frederick Douglass Elementary School. Construction of the
fence has required performance of additional work by the fencing subcontractor, Effective Ironworks,
Inc., who has applied for a change order for the increased cost of its performance. H.J. Ross, the CRA's
consulting engineer, has reviewed the request and approved $17,427.00 of the requested changes. The
CRA and the general contractor are in not in agreement as to the amount owed the general contactor
under the original contract but agree the subcontractor is entitled to this change order and have agreed to
payment by two-party check.
FKR/em
SEOPW/CRA
03- 25
•
e
i0
H. J. Ross Associates, Inc.
Engineers • Planners • Scientists
February 28, 2003
Frank K. Rollason, Executive Director
City of Miami Community Redevelopment Agency
300 Biscayne Boulevard Way
Suite 430
Miami, FL 33131
RE: Frederick Douglas Elementary School — Change Order Req
Dear Frank:
800 Douglas Entrance
Annex Building, Suite 250
Coral Gables, FL 33134-3163
Telephone: (305) 567-1888
Facsimile: (305) 567-1771
We reviewed the change order request from the contractor, TLMC Enterprises, Inc., and
its subcontractor Effective Iron Works, Inc., and offer the following iinformation and
recommendations:
Preamble
H.J. Ross Associates had no involvement in the design or construction administration of
this project; therefore, our summation and interpretation of the events is based solely on
information provided by Mr. David Hernandez (construction manager for CRA at the
time of construction), construction drawings (C-1 to C-3, undated), and the contractor's
Proposed Change Order #1 & #2 (dated May 16, 2002). The following items address the
contractor's requests and include requests from the fence subcontractor.
Request from the General Contractor (TLMC Enterprises, Inc.)
1) Footings in Path of Fence Posts: This was additional work from an unforeseen
condition; however, our estimation is that the work should have required only one
day to complete which should be about half of the amount requested.
Recommendation: Pay $1, 032.00 (half of the corrected amount)
2) Removal and Grading of Berm: The fence was to be installed approximately at
the back of the existing sidewalk along the school property line. The fence should
have followed the sidewalk slope, which would not require removal of any
substantial amount of embankment from the school property. In addition, a site
investigation prior to bidding would have provided the contractor any information
to determine how the fence would be installed and if any minor grading would
SEOPW/CRA
03- 25
www.hjross.com
H. J. Ross Assoc, Inc.
0
•
•
Frank Rollason
2/28/2003
Page 2 of 2
have been needed. This should have been included in the bid as an incidental part
of the fence work.
Recommendation: No additional compensation for this work.
3) Grading to Facilitate Sod Installation: As noted in Item 2 above, the fence was to
be installed approximately at the back of the existing sidewalk along the school
property line. No grading on the school site was shown on the plans, apparently
because no grading was needed. Any grading along the fence should have been at
the contractor's option to facilitate the work. In addition, a site investigation prior
to bidding would have provided the contractor any information to determine how
the fence should have been installed and if any minor grading would have been
required. This should have been included in the bid as an incidental part of the
fence work or site restoration.
Recommendation: No additional compensation for this work.
4) Sod Installation: Refer to Item 3 above. This should have been included in the
bid as an incidental part of the fence work or site restoration.
Recommendation: No additional compensation for this work.
Request from the subcontractor (Effective Iron Works, Inc.)
1) Increased Length of Rolling Gates and Concrete Footing: The gates had to be
made wider than shown on the plans due to setbacks needed to provide clearance
when the gates are fully retracted.
Recommendation: Pay full amount of $2,940.00
2) Remove and Reinstall North and East Fencing: The typical fence detail shown on
Sheet C-3 indicates a fairly level situation at the base of the fence. The
subcontractor apparently followed the back of sidewalk slope when installing the
fence and produced an uneven line at the top of the fence, which was not the
intent of the drawings. This required reinstallation of a portion of the fence.
C:\My Documents\55023.91 CRA Misc\CRA Frank FDE fence Itr.doc SE®PW/CRA
03- 25
H. J. Ross Assocs., Inc. 0
Frank Rollason
• 2/28/2003
Page 3 of 3
•
Recommendation: Pay full amount of $10, 700.00.
3) Spacing of 2" x 2" Posts: The post spacing had to be reduced to stiffen the fence.
This required additional posts to be installed.
Recommendation: Pay full amount of $2, 700.00
4) Increased Size of Cross Rails: Based on the conditions noted in Item 3 above, the
cross rail needed to be increased for the reasons stated in the subcontractor's
letter.
Recommendation: Pay full amount of $1,087.00
If you have any questions concerning the above information, please call me.
Sincerely,
H.J. ROSS ASSOCIATES, INC.
Charles K. Deeb, P.E.
Vice President
C:\My Documents\55023.91 CRA Misc\CRA Frank FDE fence Itr.doc SEOpW/CRA
03- 25
p. n
• EFFECTIVE IRON WORKS, INC
6899 NW 7' Avenue
Miami, FL 33150
Phone 786-251-3277
PROPOSED CHANGE ORDER ## 1
To: TLMC Enterprises, Inc_
3800 NW 22" Avenue
Miami, Fl 33142 Date: 01-14-2002
305-948-9271
305-948-1131
Project: Frederick Douglas Elementary
Project #: 1045-01
Please consider the following changes made to satisfy Miami -Dade Public School Standards as
well as increasing serviceability and maintenance.
S 2,940.,00 Item # I ... Increased length of rolling gates and concrete footing:
Please be advised that the length of several gates needed to be
increased due to field directives stating to match the length of existing openings.
The openings affected and related cost are:
$ 500.00 One 14' gate on NW 12`t' Street to 16' = 2 ` x $ 250.00 each
$ 500.00 One 20' gate on NW 12' Street to 22' = 2 ` x $ 250.00 each
$ 500.00 One 20' gate on NW 12'' Street to 22' = 2 ` x $ 250.00 each
$ 500.00 One 20' gate on Nv-W 1 lm Street to 22' = 2 ` x $ 250.00 each
$1,440.00 8' additional concrete footing and metal track x $180.00
$2,940.00 Total cost of Item # 1
$ 10,700.00 Item# 2...Re'move and re -install North and East fencing.
Please be advised, that due to grading and elevation considerations not shown on
the plans, we had to remove and then re -install the metal fencing in these areas.
The raising of the fencing, to accommodate the existing grades, pushed the top of
the fence connections into the concrete cap making the project less attractive.
$ 10,700.00 Rernove and re -install 625 lineal foot x $ 17.12 per foot
•
SE®PW/CIS
3= 25
• $ 2,700.00 Item# 3—Spacing of 2" x 2" posts:
Please be aware that the plans call for 8' spacing between posts. Upon fabrication,
-u,e noticed bowing and wealmess due to the 8' spans specified. We do not
guarantee that the 8' spans would meet Miami -Dade Public School Standards.
Thus the change to 6' spacings of the posts. Due to life safety and Miami -Dade
Public Schools requirements we would like for you to consider the following
upgrades in the structural components for our fence fabrication and installation.
$ 2,700.00 60 additional posts @ $ 45.00 each
- $ 1,087.00 Item# 4... Increased size of cross rails:
Please understand, that in addition to Item # 3 mentioned above, additional
considerations needed to be addressed as the specified 1" x 1" cross rails could not
- carry the weight of the column to post spans. In addition, the usage of the 1 " x 2"
cross rails stabilized the fencing system to meet Miami -Dade Public School
Standards. Furthermore, the 1 " x 2" cross rails will add years of life and durability
as well as being more ethically pleasing architecturally.
$ 1,087.00 4,350 lineal feet x $ .25 per lineal foot
$ 17,427.00 Total Proposed Change Order 4 1
0
Please process this Change Order as soon as possible.
Yours truly.
a
r
_,,---Latlian White, President
•
SE®PW/CRA
03- 25
0
U
:v=' •,;: si' ..ors t
/'I�'IJaml-�3ade� �o�n�y��'�bllc Schools
Principal
Cathleen A. McGinnis
Assistant Principal
Rene Baly
h
July 22, 2002
Commissioner Arthur Teele
City of Miami
3500 Pan American Drive
Miami, FL 33133
Dear`•Commissioner Teele,
THANK YOU! THANK YOU! THANK YOU!
r. .
I . ;trr students'
Miami -Dade County School Board
Pena tabares Hantman, Chair
Dr. Michael M. Krop, Vice Chair
Frank J. BOIanOS
Frank J. Cobo
Dr. Robert B. Ingram
Betsy H. Kaplan
Manty Sabat6s Morse
Dr. Marta Perez
Dr. Solomon C. Stinson
Superintendent of Schools
Merrett R. Slierheim
Your generosity and concern toward our school and our children is very much appreciated.
Being an inner city school, the faculty and the administration are constantly looking for ways to
help our children develop positive character/self-esteem and a feeling of safety as they come to
school each day. You have helped this become a reality for over 700 students this school year.
The installation of our beautiful new fence that surrounds the bui;ding, has not only given our
campus a wonderful facelift, it has given all of us a greater sense of security during the school
day. It has also added charm to our school, and is a great source of protection to all of us.
Again, your community spirit is outstanding and much appreciated. We thank you.
Sincerely,
Cathleen A. McGinnis
Principal
CAM/mv
FREDE ICK DO! GLASS ELEN;IENTARY SCHOOL
314 Id. V✓. 12 Street , Miami, FL 33136 - 305-371-4687 • Fax .305-3Njj9 /CRA
03- 25
CITY OF MIAMI, FLORIDA
INTER -OFFICE MEMORANDUM
TO : Depak M. Parekh DATE : May 17"', 2001 F,LE
Executive Director
City of Miami Community SUBJECT : Proposed Fence/Columns Project for
Redevelopment Agency Frederick Douglas Elementary School
FROM: ector �ima REFERENCES
Director
Building Department ENCLOSURES :
Per your request, the City of Miami Building Department personnel performed a courtesy review
of the plans for the structural components of the proposed fence/columns project for Frederick
Douglas Elementary School. The plans meet the present South Florida Building Code
requirements, however, they have not been signed and sealed by the Architect/P.E. As routinely
done, they have been perforated for identification purposes.
Please note that, as stated above, the review of these plans was performed as a courtesy to you.
The Building Department does not have jurisdiction to issue permits, conduct inspections, and/or
review plans when it comes to the Dade County Public School System.
If you have any additional questions or concerns, please do not hesitate to call me at
305.416.1105.
C: Jose Ferras, Building Official
C,
SEOPW/CRA
03- 25
RESOLUTION NO. 0 1 -- 8 '
A RESOLUTION OF THE BOARD OF DIRECTORS OF THE
SOUTHEAST .OVERTOWN/PARK WEST COMMUNITY
REDEVELOPMENT AGENCY ("CRA") AMENDING SEOPW
RESOLUTION NO. R-01-52 APPROVED ON MAY 21, 2001 TO
AUTHORIZE THE CRA TO RETAIN TLMC ENTERPRISES
("TLMC") TO CONSTRUCT NEW FENCING AROUND
FREDRICK DOUGLASS ELEMENTARY SCHOOL
PURSUANT TO ITS EXISTING CONTRACT WITH THE CRA
WHICH INCLUDES THE CONSTRUCTION OF FENCING IN
LIEU OF SEEKING COMPETITIVE BIDS, AND
AUTHORIZING THE EXECUTIVE DIRECTOR OF THE CRA
TO EXECUTE A CHANGE ORDER TO THE CONTRACT
WITH TLMC TO ADD THE CONSTRUCTION OF THE FENCE
TO THE SCOPE OF SERVICES IN THE AMOUNT NOT TO
EXCEED $200,000.00.
WHEREAS, the CRA is responsible for carrying out redevelopment activities and
projects in the Southeast Overtown/Park West Community Redevelopment Area established
pursuant to the CRA Redevelopment Plan; and
WHEREAS, pursuant to SEOPW Resolution No. R-01-52, the Board of Directors -of the
CRA has authorized the CRA to enter into a Use Agreement with the School Board of Miami -
Dade County with respect to the construction of new fencing around Frederick Douglass
Elementary School (the "Fencing"), and authorize the CRA to retain the contractor through
competitive bidding; and
WHEREAS, CRA desires to expedite construction of the Fencing so that the Fencing is
completed during the summer break; and
WHEREAS, the CRA would like to retain TLMC to construct the Fencing pursuant to its
existing contract with the CRA which was authorized by SEOPW/CRA Resolution No. 00-106
and SEOPW/CRA Resolution No. 00-107 and authorize Executive Director of the CRA to
execute a change order in an amount not to exceed $200,000.00 to the existing contract to
include the Fencing in lieu of seeking competitive bidding for the construction of the Fencing.
NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE
SOUTHEAST OVERTOWN PARKWEST COMMUNITY REDEVELOPMENT AGENCY OF
THE CITY OF MIAMI, FLORIDA:
Section 1. The recitals and findings contained in the Preamble to this Resolution are
incorporated herein as if fully set forth in this Section.
SEOPW/CRA 01- 87
SEOPW/CRA
03- 25
E
•
•
Section 2. The Board of Direciors of the CRA hereby amends SEOPW Resolution
No. R-01-52 approved on May 21, 2001 to authorize the Executive Director to issue a change
order to its existing contract with TLMC to include the construction of the Fencing at cost not to
exceed $200,000.00, in lieu of seeking competitive bids for the construction of the Fencing.
Section 3. This resolution shall be effective upon its adoption.
PASSED AND ADOPTED this 10t' day of July, 2001.
Wshe
City Clerk
APPROVED AS TO FORM
AND CORRECTNESS:
Holland & Knight LLP
CRA Legal Counsel
Now
Arthur E. Teele, Jr., Chairman
2
M0rW/C9C-' - 0 1 - 8 r
SEOPW/CRA
03- 25
MEETING DATE: May 21, 2001
E
SEOPW AND OIVINI/CRA
CITY CLERK'S REPORT
Page No. 24
ITEM 16-a A RESOLUTION I) AUTHORIZING THE SEOPW/CRA R-01-52
COMMUNITY REDEVELOPMENT AGENCY MOVED: SANCHEZ
("CRA") TO ENTER INTO A USE AND SECONDED: WINTON
TEMPORARY CONSTRUCTION AGREEMENT ABSENT: REGALADO
WITH SCHOOL BOARD OF MIAMI-DADE
COUNTY, FLORIDA SUBSTANTIALLY IN THE
FORM OF EXHIBIT "A" ATTACHED AND MADE A
PART HEREOF (THE "AGREEMENT"), II)
AUTHORIZING THE CRA TO EXPEND AN
AMOUNT NOT TO EXCEED TWO HUNDRED
• THOUSAND AND 00/100 DOLLARS ($200,000.00)
IN CONNECTION WITH THE CONSTRUCTION OF
NEW ARCHITECTURAL FENCING PURSUANT TO
THE AGREEMENT (THE "FENCING"), UTILIZING
TAX INCREMENT FUNDS ("TIF" ), AND III
AUTHORIZING THE CRA TO SEEK BIDS FOR A
CONTRACTOR TO CONSTRUCT THE FENCING
AND TO SELECT THE LOWEST QUALIFIED
BIDDER FROM AMONG SUCH CONTRACTORS
SUBMITTING QUALIFYING BIDS.
•
SEOPW / CRA
03- 25