HomeMy WebLinkAboutSEOPW-CRA-R-03-00250 .0 ITEM 15 i RESOLUTION SEOPW/CRA R- 0 3 25 A RESOLUTION OF THE BOARD DIRECTORS OF THE SOUTHEAST OVERTOWN/PARK WEST COMMUNITY REDEVELOPMENT AGENCY (THE SEOPW "CRA") AUTHORIZING THE EXECUTIVE DIRECTOR TO EXECUTE A CHANGE ORDER IN THE AMOUNT OF $17,427.00 FOR ADDITIONAL WORK REQUIRED ON THE FENCE AT FREDERICK DOUGLASS ELEMENTARY SCHOOL; FURTHER AUTHORIZING THE EXECUTIVE DIRECTOR TO EXECUTE.,.A TWO-PARTY CHECK TO EFFECTIVE IRONWORKS, INC. AND TLMC ENTERPRISES, INC. PROVIDED THAT THE CRA RECEIVE A FINAL RELEASE FROM EFFECTIVE IRONWORKS. WHEREAS, the CRA entered into an agreement with general contractor TLMC Enterprises, Inc. for the construction of parking lot P-2; and WHEREAS, the CRA by resolutions SEOPW/CRA R-01-52 and R-01-87 expanded the scope of work to include construction of a fence at Frederick Douglass Elementary; and WHEREAS, construction of the fence has required performance of additional work by the fencing subcontractor, Effective Ironworks, Inc., who has applied for a change order for the increased cost of its performance; and WHEREAS, H.J. Ross, the CRA's consulting engineer, has reviewed the request and approved $17,427.00 of the requested changes; and WHEREAS, the CRA and the general contractor are in not in agreement as to the amount owed the general contactor under the original contract but agree the subcontractor is entitled to this change order and have agreed to payment by two-party check. NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE SOUTHEAST OVERTOWN/PARK WEST COMMUNITY REDEVELOPMENT AGENCY OF THE CITY OF MIAMI, FLORIDA: Section 1. The recitals and findings contained in the Preamble to this Resolution are incorporated herein as if fully set forth in this Section. Section 2. That Board of Directors of the CRA hereby authorize the Executive Director to execute a change order in the amount of $17,427.00 for additional work on the fence at Frederick Douglass Elementary and to execute a two party check to Effective Ironworks, Inc. and TLMC Enterprises, Inc., provided that the CRA receive a final release from Effective Ironworks. SEOPW/CRA 03- 25 Section 3. This Resolution shall be effective upon its adoption. PASSED AND ADOPTED this 3 1 " day of March, 2003. ARTItJR E. TEELE, JR., CHAI AN M CLERK OF THE BOARD NOTE: Expenditure authorized by this resolution is funded by CRA SEOPW TIF - Account Code No. 689001.550108.6.860 — Construction in Progress. (See Attached Financial Information Form) Frank K. Rollason, Executive Director Community Redevelopment Agency SEOPW/CR.A 03- 25 AGENDAI& FINANCIAL INFORMATION FORM CITY OF MIAMI COMMUNITY REDEVELOPMENT AGENCY EOPW C or OMNI CRA (if applicable) CRA Board Meeting Date: March 31, 2003 CRA Section: Finance & Administration Brief description of CRA Agenda Item: Change Order in the amount of $17,427.00 for additional work at Frederick Douglass Elementary School — Fence. (Item 15 on 3/31/03 Agenda). Project Number: 689001 YES, there are sufficient funds in Line Item: Index Code: 550108 Minor: 860 Amount: $17,427 ❑ NO (Complete the following source of funds information): Amount budgeted in the line item: $ Balance in the line item: $ Amount needed in the line item: $ Sufficient funds will be transferred from the following line items: ACTION I ACCOUNT NUMBER TOTAL Project No./Index/Minor Object From $ To $ From $ To $ Comments: Approved by: Date: VFZO-3 CRA Executive Director/Designee .n����ivv�.M,�v�n �nr`�:;`M'�iv�,view✓vv�'�v�M��"�tiv�i.�✓�tii�v�M�v�nn�Mi�ti�Mw� w�vv�n� .� ��n� APPROVALS CRA Accounting Section Date: �-�;Ixev Verified b CITA Finance Section Date: Y/7/CO-OPW/CRA ITEM 15 • CITY OF MIAMI, FLORIDA INTER -OFFICE MEMORANDUM To: Chairman Arthur E. Teele, Jr. and Date: March 13, 2003 File: Members of the CRA Board Subject: Change Order - Frederick Douglass Fencing f From: Frank`'. Rollason References: CRA Executive Director Enclosures: Resolution/Support Documentation RECOMMENDATION: It is respectfully recommended that the CRA Board of Directors adopt the attached resolution authorizing a change order in the amount of $17,427.00 for additional work performed by the fencing subcontractor at Frederick Douglass Elementary School; further, authorizing the Executive Director to execute a two-party check to Effective Ironworks, Inc. and TLMC Enterprises, Inc., provided that the CRA receive a final release from Effective Ironworks, Inc. • JUSTIFICATION: • The CRA entered into an agreement with general contractor TLMC Enterprises, Inc. for the construction of parking lot P-2. By Resolutions SEOPW/CRA R-01-52 and R-01-87 the CRA expanded the scope of work to include construction of a fence at Frederick Douglass Elementary School. Construction of the fence has required performance of additional work by the fencing subcontractor, Effective Ironworks, Inc., who has applied for a change order for the increased cost of its performance. H.J. Ross, the CRA's consulting engineer, has reviewed the request and approved $17,427.00 of the requested changes. The CRA and the general contractor are in not in agreement as to the amount owed the general contactor under the original contract but agree the subcontractor is entitled to this change order and have agreed to payment by two-party check. FKR/em SEOPW/CRA 03- 25 • e i0 H. J. Ross Associates, Inc. Engineers • Planners • Scientists February 28, 2003 Frank K. Rollason, Executive Director City of Miami Community Redevelopment Agency 300 Biscayne Boulevard Way Suite 430 Miami, FL 33131 RE: Frederick Douglas Elementary School — Change Order Req Dear Frank: 800 Douglas Entrance Annex Building, Suite 250 Coral Gables, FL 33134-3163 Telephone: (305) 567-1888 Facsimile: (305) 567-1771 We reviewed the change order request from the contractor, TLMC Enterprises, Inc., and its subcontractor Effective Iron Works, Inc., and offer the following iinformation and recommendations: Preamble H.J. Ross Associates had no involvement in the design or construction administration of this project; therefore, our summation and interpretation of the events is based solely on information provided by Mr. David Hernandez (construction manager for CRA at the time of construction), construction drawings (C-1 to C-3, undated), and the contractor's Proposed Change Order #1 & #2 (dated May 16, 2002). The following items address the contractor's requests and include requests from the fence subcontractor. Request from the General Contractor (TLMC Enterprises, Inc.) 1) Footings in Path of Fence Posts: This was additional work from an unforeseen condition; however, our estimation is that the work should have required only one day to complete which should be about half of the amount requested. Recommendation: Pay $1, 032.00 (half of the corrected amount) 2) Removal and Grading of Berm: The fence was to be installed approximately at the back of the existing sidewalk along the school property line. The fence should have followed the sidewalk slope, which would not require removal of any substantial amount of embankment from the school property. In addition, a site investigation prior to bidding would have provided the contractor any information to determine how the fence would be installed and if any minor grading would SEOPW/CRA 03- 25 www.hjross.com H. J. Ross Assoc, Inc. 0 • • Frank Rollason 2/28/2003 Page 2 of 2 have been needed. This should have been included in the bid as an incidental part of the fence work. Recommendation: No additional compensation for this work. 3) Grading to Facilitate Sod Installation: As noted in Item 2 above, the fence was to be installed approximately at the back of the existing sidewalk along the school property line. No grading on the school site was shown on the plans, apparently because no grading was needed. Any grading along the fence should have been at the contractor's option to facilitate the work. In addition, a site investigation prior to bidding would have provided the contractor any information to determine how the fence should have been installed and if any minor grading would have been required. This should have been included in the bid as an incidental part of the fence work or site restoration. Recommendation: No additional compensation for this work. 4) Sod Installation: Refer to Item 3 above. This should have been included in the bid as an incidental part of the fence work or site restoration. Recommendation: No additional compensation for this work. Request from the subcontractor (Effective Iron Works, Inc.) 1) Increased Length of Rolling Gates and Concrete Footing: The gates had to be made wider than shown on the plans due to setbacks needed to provide clearance when the gates are fully retracted. Recommendation: Pay full amount of $2,940.00 2) Remove and Reinstall North and East Fencing: The typical fence detail shown on Sheet C-3 indicates a fairly level situation at the base of the fence. The subcontractor apparently followed the back of sidewalk slope when installing the fence and produced an uneven line at the top of the fence, which was not the intent of the drawings. This required reinstallation of a portion of the fence. C:\My Documents\55023.91 CRA Misc\CRA Frank FDE fence Itr.doc SE®PW/CRA 03- 25 H. J. Ross Assocs., Inc. 0 Frank Rollason • 2/28/2003 Page 3 of 3 • Recommendation: Pay full amount of $10, 700.00. 3) Spacing of 2" x 2" Posts: The post spacing had to be reduced to stiffen the fence. This required additional posts to be installed. Recommendation: Pay full amount of $2, 700.00 4) Increased Size of Cross Rails: Based on the conditions noted in Item 3 above, the cross rail needed to be increased for the reasons stated in the subcontractor's letter. Recommendation: Pay full amount of $1,087.00 If you have any questions concerning the above information, please call me. Sincerely, H.J. ROSS ASSOCIATES, INC. Charles K. Deeb, P.E. Vice President C:\My Documents\55023.91 CRA Misc\CRA Frank FDE fence Itr.doc SEOpW/CRA 03- 25 p. n • EFFECTIVE IRON WORKS, INC 6899 NW 7' Avenue Miami, FL 33150 Phone 786-251-3277 PROPOSED CHANGE ORDER ## 1 To: TLMC Enterprises, Inc_ 3800 NW 22" Avenue Miami, Fl 33142 Date: 01-14-2002 305-948-9271 305-948-1131 Project: Frederick Douglas Elementary Project #: 1045-01 Please consider the following changes made to satisfy Miami -Dade Public School Standards as well as increasing serviceability and maintenance. S 2,940.,00 Item # I ... Increased length of rolling gates and concrete footing: Please be advised that the length of several gates needed to be increased due to field directives stating to match the length of existing openings. The openings affected and related cost are: $ 500.00 One 14' gate on NW 12`t' Street to 16' = 2 ` x $ 250.00 each $ 500.00 One 20' gate on NW 12' Street to 22' = 2 ` x $ 250.00 each $ 500.00 One 20' gate on NW 12'' Street to 22' = 2 ` x $ 250.00 each $ 500.00 One 20' gate on Nv-W 1 lm Street to 22' = 2 ` x $ 250.00 each $1,440.00 8' additional concrete footing and metal track x $180.00 $2,940.00 Total cost of Item # 1 $ 10,700.00 Item# 2...Re'move and re -install North and East fencing. Please be advised, that due to grading and elevation considerations not shown on the plans, we had to remove and then re -install the metal fencing in these areas. The raising of the fencing, to accommodate the existing grades, pushed the top of the fence connections into the concrete cap making the project less attractive. $ 10,700.00 Rernove and re -install 625 lineal foot x $ 17.12 per foot • SE®PW/CIS 3= 25 • $ 2,700.00 Item# 3—Spacing of 2" x 2" posts: Please be aware that the plans call for 8' spacing between posts. Upon fabrication, -u,e noticed bowing and wealmess due to the 8' spans specified. We do not guarantee that the 8' spans would meet Miami -Dade Public School Standards. Thus the change to 6' spacings of the posts. Due to life safety and Miami -Dade Public Schools requirements we would like for you to consider the following upgrades in the structural components for our fence fabrication and installation. $ 2,700.00 60 additional posts @ $ 45.00 each - $ 1,087.00 Item# 4... Increased size of cross rails: Please understand, that in addition to Item # 3 mentioned above, additional considerations needed to be addressed as the specified 1" x 1" cross rails could not - carry the weight of the column to post spans. In addition, the usage of the 1 " x 2" cross rails stabilized the fencing system to meet Miami -Dade Public School Standards. Furthermore, the 1 " x 2" cross rails will add years of life and durability as well as being more ethically pleasing architecturally. $ 1,087.00 4,350 lineal feet x $ .25 per lineal foot $ 17,427.00 Total Proposed Change Order 4 1 0 Please process this Change Order as soon as possible. Yours truly. a r _,,---Latlian White, President • SE®PW/CRA 03- 25 0 U :v=' •,;: si' ..ors t /'I�'IJaml-�3ade� �o�n�y��'�bllc Schools Principal Cathleen A. McGinnis Assistant Principal Rene Baly h July 22, 2002 Commissioner Arthur Teele City of Miami 3500 Pan American Drive Miami, FL 33133 Dear`•Commissioner Teele, THANK YOU! THANK YOU! THANK YOU! r. . I . ;trr students' Miami -Dade County School Board Pena tabares Hantman, Chair Dr. Michael M. Krop, Vice Chair Frank J. BOIanOS Frank J. Cobo Dr. Robert B. Ingram Betsy H. Kaplan Manty Sabat6s Morse Dr. Marta Perez Dr. Solomon C. Stinson Superintendent of Schools Merrett R. Slierheim Your generosity and concern toward our school and our children is very much appreciated. Being an inner city school, the faculty and the administration are constantly looking for ways to help our children develop positive character/self-esteem and a feeling of safety as they come to school each day. You have helped this become a reality for over 700 students this school year. The installation of our beautiful new fence that surrounds the bui;ding, has not only given our campus a wonderful facelift, it has given all of us a greater sense of security during the school day. It has also added charm to our school, and is a great source of protection to all of us. Again, your community spirit is outstanding and much appreciated. We thank you. Sincerely, Cathleen A. McGinnis Principal CAM/mv FREDE ICK DO! GLASS ELEN;IENTARY SCHOOL 314 Id. V✓. 12 Street , Miami, FL 33136 - 305-371-4687 • Fax .305-3Njj9 /CRA 03- 25 CITY OF MIAMI, FLORIDA INTER -OFFICE MEMORANDUM TO : Depak M. Parekh DATE : May 17"', 2001 F,LE Executive Director City of Miami Community SUBJECT : Proposed Fence/Columns Project for Redevelopment Agency Frederick Douglas Elementary School FROM: ector �ima REFERENCES Director Building Department ENCLOSURES : Per your request, the City of Miami Building Department personnel performed a courtesy review of the plans for the structural components of the proposed fence/columns project for Frederick Douglas Elementary School. The plans meet the present South Florida Building Code requirements, however, they have not been signed and sealed by the Architect/P.E. As routinely done, they have been perforated for identification purposes. Please note that, as stated above, the review of these plans was performed as a courtesy to you. The Building Department does not have jurisdiction to issue permits, conduct inspections, and/or review plans when it comes to the Dade County Public School System. If you have any additional questions or concerns, please do not hesitate to call me at 305.416.1105. C: Jose Ferras, Building Official C, SEOPW/CRA 03- 25 RESOLUTION NO. 0 1 -- 8 ' A RESOLUTION OF THE BOARD OF DIRECTORS OF THE SOUTHEAST .OVERTOWN/PARK WEST COMMUNITY REDEVELOPMENT AGENCY ("CRA") AMENDING SEOPW RESOLUTION NO. R-01-52 APPROVED ON MAY 21, 2001 TO AUTHORIZE THE CRA TO RETAIN TLMC ENTERPRISES ("TLMC") TO CONSTRUCT NEW FENCING AROUND FREDRICK DOUGLASS ELEMENTARY SCHOOL PURSUANT TO ITS EXISTING CONTRACT WITH THE CRA WHICH INCLUDES THE CONSTRUCTION OF FENCING IN LIEU OF SEEKING COMPETITIVE BIDS, AND AUTHORIZING THE EXECUTIVE DIRECTOR OF THE CRA TO EXECUTE A CHANGE ORDER TO THE CONTRACT WITH TLMC TO ADD THE CONSTRUCTION OF THE FENCE TO THE SCOPE OF SERVICES IN THE AMOUNT NOT TO EXCEED $200,000.00. WHEREAS, the CRA is responsible for carrying out redevelopment activities and projects in the Southeast Overtown/Park West Community Redevelopment Area established pursuant to the CRA Redevelopment Plan; and WHEREAS, pursuant to SEOPW Resolution No. R-01-52, the Board of Directors -of the CRA has authorized the CRA to enter into a Use Agreement with the School Board of Miami - Dade County with respect to the construction of new fencing around Frederick Douglass Elementary School (the "Fencing"), and authorize the CRA to retain the contractor through competitive bidding; and WHEREAS, CRA desires to expedite construction of the Fencing so that the Fencing is completed during the summer break; and WHEREAS, the CRA would like to retain TLMC to construct the Fencing pursuant to its existing contract with the CRA which was authorized by SEOPW/CRA Resolution No. 00-106 and SEOPW/CRA Resolution No. 00-107 and authorize Executive Director of the CRA to execute a change order in an amount not to exceed $200,000.00 to the existing contract to include the Fencing in lieu of seeking competitive bidding for the construction of the Fencing. NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE SOUTHEAST OVERTOWN PARKWEST COMMUNITY REDEVELOPMENT AGENCY OF THE CITY OF MIAMI, FLORIDA: Section 1. The recitals and findings contained in the Preamble to this Resolution are incorporated herein as if fully set forth in this Section. SEOPW/CRA 01- 87 SEOPW/CRA 03- 25 E • • Section 2. The Board of Direciors of the CRA hereby amends SEOPW Resolution No. R-01-52 approved on May 21, 2001 to authorize the Executive Director to issue a change order to its existing contract with TLMC to include the construction of the Fencing at cost not to exceed $200,000.00, in lieu of seeking competitive bids for the construction of the Fencing. Section 3. This resolution shall be effective upon its adoption. PASSED AND ADOPTED this 10t' day of July, 2001. Wshe City Clerk APPROVED AS TO FORM AND CORRECTNESS: Holland & Knight LLP CRA Legal Counsel Now Arthur E. Teele, Jr., Chairman 2 M0rW/C9C-' - 0 1 - 8 r SEOPW/CRA 03- 25 MEETING DATE: May 21, 2001 E SEOPW AND OIVINI/CRA CITY CLERK'S REPORT Page No. 24 ITEM 16-a A RESOLUTION I) AUTHORIZING THE SEOPW/CRA R-01-52 COMMUNITY REDEVELOPMENT AGENCY MOVED: SANCHEZ ("CRA") TO ENTER INTO A USE AND SECONDED: WINTON TEMPORARY CONSTRUCTION AGREEMENT ABSENT: REGALADO WITH SCHOOL BOARD OF MIAMI-DADE COUNTY, FLORIDA SUBSTANTIALLY IN THE FORM OF EXHIBIT "A" ATTACHED AND MADE A PART HEREOF (THE "AGREEMENT"), II) AUTHORIZING THE CRA TO EXPEND AN AMOUNT NOT TO EXCEED TWO HUNDRED • THOUSAND AND 00/100 DOLLARS ($200,000.00) IN CONNECTION WITH THE CONSTRUCTION OF NEW ARCHITECTURAL FENCING PURSUANT TO THE AGREEMENT (THE "FENCING"), UTILIZING TAX INCREMENT FUNDS ("TIF" ), AND III AUTHORIZING THE CRA TO SEEK BIDS FOR A CONTRACTOR TO CONSTRUCT THE FENCING AND TO SELECT THE LOWEST QUALIFIED BIDDER FROM AMONG SUCH CONTRACTORS SUBMITTING QUALIFYING BIDS. • SEOPW / CRA 03- 25