Loading...
HomeMy WebLinkAboutSEOPW-CRA-2003-04-28-Discussion Item 13• • CONSTRUCTION • • CITY OF MIAMI, FLORIDA ITEM 13 ® INTER -OFFICE MEMORANDUM Honorable Arthur E. Teele, Jr., Chairman DATE: April 16, 2003 FILE: &Members of the CRA Board SUBJECT: Ratification - Metric Engineering Design Work FROM: REFERENCES: Frank . Rollason 4/28/03 CRA Board Agenda Executive Director ENCLOSURES: Community Redevelopment Agency RECOMMENDATION: It is recommended that the Board of Directors approve the attached Resolution ratifying. the the action by a CRA Administration authorizing Metric Engineering to perform the design and provide signed and sealed plans per Work Order No. 03 issued December 28, 2000, for the 9th Street Pedestrian Mall between NW 2nd and 3rd Avenues in the amount of $102,890.00. JUSTIFICATION: Research has revealed that MetriCEngineering was issued Work. Order No. 03 by a CRA Administration, without Board approval, to perform the design work and provide signed and sealed plans for the stretch of the 9th Street Pedestrian Mall between NW 2nd and 3rd Avenues. The work was completed and accepted by the CRA. In addition, the construction job was put out to bid and awarded to Community Asphalt to perform the work and their contract is in the process of being executed. Also, please be advised that payments in an approximate amount of $96,000.00 have already been made to Metric Engineering leaving a balance due of approximately $6,000.00. FUNDING SOURCE: CDBG Capital Improvements ACCOUNT NUMBER: 799126.452502.6.930 FKR:sg 4 L) Ie:.A •� Fsr.9 Sv o':cai 0 • �I RESOLUTION NO. SEOPW/CRA R- A RESOLUTION OF THE BOARD OF DIRECTORS OF THE SOUTHEAST OVERTOWN/PARK WEST COMMUNITY REDEVELOPMENT AGENCY (the "SEOPW/CRA') RATIFYING THE --ISSUANCE OF WORK ORDER #3, TO METRIC ENGINEERING, INC. FOR GENERAL ENGINEERING SERVICES FOR THE 9TH STREET PEDESTRIAN MALL BETWEEN N.W. 2' AND N.W. 3P'D AVENUES, IN AMOUNT NOT TO EXCEED $102,890.00 FROM ACCOUNT NUMBER 799126.452502.6.930, CDBG CAPITAL IMPROVEMENTS, AND APPROVING PREVIOUS PAYMENTS MADE THEREUNDER ITEM 13 WHEREAS, the design and construction of the 9P Street Pedestrian Mall is a part of the Southeast Overtown/Park West _redevelopment project; and WHEREAS, the Southeast Overtown/Park West Community Redevelopment Agency, �) required, received and made payment for general engineering services for the design of the 9 b q py g g g g Street Pedestrian Mall between N.W. 2nd and N.W. 3 avenues pursuant to Work Order #3, issued on December 28, 2000, in an amount not to exceed $102,890.00. WHEREAS, the Board of Directors desires to ratify the issuance of Work Order #3 and approve payments made thereunder. NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE SOUTHEAST OVERTOWN/PARK WEST COMMUNITY REDEVELOPMENT AGENCY OF THE CITY OF MIAMI, FLORIDA: Section 1. The recitals and findings contained in the Preamble to this Resolution are adopted and incorporated herein as if fully set forth in this Section. Page 2 of 2 0 • Section 2. The Board of Directors hereby ratify and approve Work Order #3 and the payments made thereunder from Account Number 799126.452502.6.930, CDBG Capital Improvements. Section 3. This Resolution shall be effective upon its adoption. PASSED AND ADOPTED this 28th day of April, 2003. ATTEST: PRISCILLA A. THOMPSON, CLERK OF THE BOARD APPROVED AS TO FORM AND CORRECTNESS: ALEJANDRO VILARELLO GENERAL COUNSEL ARTHUR E. TEELE, JR., CHAIRMAN i3 h"S3 m Page 2 of 2 • DATE: December 4, 2000 City oflMfiami Community Redevelopment Agency TO: Manuel Benitez, P.E. President Metric Engineering, Inc. FOR: Non- Exclusive Professional Services PROJECT NO. 104.035 COMPLETION OF 9' STREET PEDESTRIAN MALL — PHASE III Work Order Number: 03 WORK ORDER FOR CONCEPTUAL PLANNING SERVICES Pursuant to a request from the Miami CRA, the Metric Engineering, Inc., (the "Consultant") proposes and agrees to perform professional services (the "service" or the "work") within the attached schedule for Community Redevelopment Projects and Programs and pursuant to the applicable scope, terms and conditions of the attached consulting services agreement entered into by the Consultant and (CRA), for providing miscellaneous professional services to the City of Miami, Community Redevelopment Agency in the Non-exclusive Professional Services Agreement, City of Miami, Contract & Resolution Number 99-708, approved on January 4, 2000. SCOPE OF WORK DESCRIPTION COST Schematic Design $ 3,500.00 Roadway Plans $ 33,330.00 TrafficControl Plans $ 1,655.00 Ublity Coordination $ 5,120.00 Lighting Plans $ 6,140.00 Subconsultant Schematic Design $ 12,500.00 Subconsultant Design Development $ 12, 500.00 Subconsultant Construction Documents $ 25,000.00 Subconsultant Bidding Assistance $ 3,125.00 TOTAL $ 102,890.00 Project # 104.035 Ninth Street Work Order # 3 Page 2 - Cont'd Time Frame The work is to be completed not later than One (1) Year from the signed date of this Work Order by the Consultant and City of Miami, Community Redevelopment Agency (CRA). Estimated Cost: Do not exceed the described above fees, unless otherwise agreed to by the City of (Compensation) Miami, Community Redevelopment Agency (CRA). Project Number Individual Projects to be assigned Approved and Agreed to: 12 17,'� I b°" Dipak M. Parekh, �/��----- 01 / 0:2 / 01 Metric Engineering, Inc., Authorized Representative Date C:mydocumentlwork order planning services P104.0352 wo # 3 2 COST PROPOSAL SUMMARY Description: City of Miami Metric Engineering, Inc. 13940 S.W. 136th Street, Suite 200 NW 9th Street Pedestrian mall Miami, Florida 33186 C.I.P Project No.: TBD (305)235-5098 Professional Cost Average NO. / ACTIVITY Project Manager Engineer Engineer Technician Hours For Hourly Rate Activity $100.00 $90.00 $70.00 $55.00 Schematic Design 8 16 12 81 44 $3,520.00 Roadway Plans 50 72 144 2141 480 $33,330.00 Traffic Control Plans 2 4 7 ill 24 $1,655.00 Utility Coordination 6 12 24 32 74 $5,120.00 Lighting Plans 4 12 32 44 92 $6,140.00 TOTAL MANHOURS 70 TOTAL SALARY COSTS $7,000.00 116 219 309 714 $10,440.001 $15,330.00 $161995.00 $49,765.00 $69.70 TOTAL CONTRACT FEE COMPUTATION (Check Appropriate Box) Other Costs: [X] Initial Estimate a) Post Design Services (Upset Limit Fee) Total Activity Salary Costs $49,765.00 [ ] Revision No. 1 PM 12 hrs 0 $100.00/1 $1,600.00 [ ] Revision No. 2 PE 36 hrs @ $ 90.00/I 3600.00 Subconsultant Services (WRT) $53,125.00 If revised estimate, give reason ENGR. 72 hrs @ $ 70.001 5760.00 4 for revisions: Subconsultant (WRT) 9375.00 Subtotal (Lump Sum Services) $102,890.00 $20,335.00 b)Roadway Reconstruction (Optional Services) 1 PM 20 hrs @ $100.00/ $2,000.00 PE 30 hrs @ $ 90.00/I 2700.00 ENGR. 60 hrs @ $ 70.001 4200.00 TECH. 80 hrs @ $ 55.00A 4400.00 $13,300.00 c) Subconsultant Services . Schematic Design $12,500.00 Design Development 12500.00 Revised by: Construction Documents 25000.00 Bidding Assistance 3125.00 $53,125.00 Prepared By: Manuel Benitez, P.E. Date: 10/25/00 . NACONTRAC-RCity of Miarrul1412C Ninth St. Phase III\Cost Proposal.123 0 E H H l� W