HomeMy WebLinkAboutOMNI-CRA-R-02-0040May 30, 2002 ITEM 11 RESOLUTION NO. OMNI/CRA R- 0 2 ` 40 A RESOLUTION OF THE BOARD OF DIRECTORS OF THE OMNI COMMUNITY REDEVELOPMENT AGENCY (CRA) AUTHORIZING THE EXECUTIVE DIRECTOR TO AMEND THE EXISTING CONTRACT WITH DANVILLE FINDORFF, IN A FORM ACCEPTABLE TO THE CRA GENERAL COUNSEL, AUTHORIZING TO AWARD FOR MODIFIED ALTERNATE `B" ("BATHROOMS") AS DETAILED IN EXHIBIT "A" UNDER BID DATED OCTOBER 2001 FOR THE ACCELERATION OF THE CONSTRUCTION OF MARGARET PACE PARK BY LABOR DAY WEEKEND, AUGUST 31, 2002, IN AN AMOUNT NOT TO EXCEED $90,000 SUBJECT TO THE AVAILABILITY OF FUNDS FROM OMNI TIF, ACCOUNT NUMBER 686001.590320.6.860; FURTHER, AUTHORIZING THE EXECUTIVE DIRECTOR TO SUBMIT THE COST FOR THE BATHROOMS TO THE CITY OF MIAMI FOR REPAYMENT THROUGH THE HOMELAND DEFENSE/NEIGHBORHOOD IMPROVEMENT BOND ISSUE; FURTHER REQUESTING THE CITY MANAGER, PURSUANT TO CITY CODE SECTION 36-6 A (I) AND (C), TO PERMIT CONSTRUCTION BETWEEN 6:00 PM AND 8:00 PM, MONDAY THROUGH SATURDAY; AUTHORIZING THE CRA EXECUTIVE DIRECTOR TO AMEND THE EXISTING CONTRACT WITH DANVILLE FINDORFF, IN A FORM ACCEPTABLE TO THE CRA GENERAL COUNSEL 1) AUTHORIZING THE AWARD OF THE MODIFIED ALTERNATE `B" (BATHROOMS) UNDER BID ORGINALLY DATED OCTOBER 2001 2) FOR THE ACCELERATION OF THE CONSTRUCTION OF MARGARET PACE PARK BY LABOR DAY WEEKEND, AUGUST 31, 2002; FURTHER, AUTHORIZING THE EXECUTIVE DIRECTOR TO SEEK REIMBURSEMENT FROM THE CITY FOR THE FULL COST OF ELIGIBLE CONTRACT ACTIVITY EXPENDITURES, INCLUDING ALL AMENDMENTS THROUGH THE HOMELAND DENFENSE/NEIGHBORHOOD IMPROVEMENT BOND ISSUE, FURTHER REQUESTING THE CITY MANAGER, PURSUANT TO CITY CODE SECTION 36-6 A(1) AND (C), TO PERMIT CONSTRUCTION BETWEEN 6:00 P.M. AND 8:00 P.M. MONDAY THROUGH SATURDAY. NOW THEREFORE, BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE OMNI COMMUNITY REDEVELOPMENT AGENCY OF THE CITY OF MIAMI, FLORIDA: Section 1. The recitals and findings contained in the Preamble to this Resolution are incorporated herein as if fully set forth in this Section. Section 2. The CRA Board of Directors hereby authorizes the CRA Executive Director to resolution authorizing the CRA Executive Director to amend the existing contract with Danville Findorff, in a form acceptable to the CRA General Counsel 1) authorizing the award of modified alternate `B" ("Bathrooms") under bid originally dated October 2001 2) for the acceleration of the construction of Margaret Pace Park by Labor Day weekend, August 31, 2002; further, authorizing the Executive Director to seek reimbursement from the City for the full cost of eligible contract activity expenditures, including all amendments through the Homeland defense/neighborhood improvement bond issue; further requesting the City Manager, 0MINITRA 02- 40 May 30, 2002 pursuant to City Code Section 36-6 a (i) and (c), to permit construction between 6:00 pm and 8:00 pm, Monday through Saturday. Section 3. This resolution shall be effective immediately upon its adoption. PASSED AND ADOPTED this 30th day of May, 2002. Priscilla Thompson, Clerk of the Board APPROVED AS TO FORM AND CORRECTNESS: Alejandro Vilarello, CRA General Counsel Arthur E. Teele, Jr., Chairman C' /C1A 02 - 40 EXHIBIT A May 30, 2002 ®Nr,qT/CRA 0Z 40 City of Miami Community Redev&pnwntAgviciy Date: May 14, 2002 MEMORANDUM TO: Annette Lewis Acting Executive Director Community Redevelopment Agency FROM: David HernandeA Director of Construction Management Community Redevelopment Agency Subject: Margaret Pace Park/ Schedule Acceleration I am in receipt of Danville-Findorff, Inc. response to the CRA's request for the schedule acceleration on the Margaret Pace Park project for a new completion date of August 31 st, 2002. w In summary, the schedule acceleration anticipates extended work 6 day and 7 day work weeks as dictated by the materials on hand, the needs of the project and progression of work to meet the substantial completion date of August 31 ", 2002. A waiver of the noise ordinance would be required. Bathroom Alternate (Per Bid dated, October 01, 2001).... $357,887.09 Accelerate Bathroom Schedule 50 days .....................$ 40,000.00 Total Bathroom..................................................$397,887.09 Accelerate Balance of the Project .............................$ 50,000.00 TOTAL PROPOSAL FOR ACCELERATION ......... $447,887.09 OTI,TNT/C"A 02- 40 M DATE: REQUESTOR: aac CONSULTANTNENDOR: City of Miami Community Redevelopment Agency REQUEST FOR SERVICE May 08, 2002 David Hernandez, CRA Danville-Findorff, Inc. (Please submit a scope of services and fee proposal as appropriate) Request: For Accelerated Schedule of Margaret Pace Park for completion on August 31". 2002, including Restrooms as amended. Cesar Calas, H.J. Ross Associates, Inc. avid er WM� nstruction Mgmt Annette Lewis, Chief Financial Officer (CFO) f-'0 o> Date s Date 5-�-� Date OMNI/CRA 02-w 40 City of Miami Community Redevelopment Agency To: Danville-Findorff, Inc. 2811 S.W. 701h Avenue Miami, Florida 33155 From: David Hernandez, Director of Construction Date: May 14, 2002 Purpose: Accelerated Schedule Work Order Number: 557 WORK ORDER To expedite the construction of the park and include the restrooms, as amended and approved, by the City of Miami. SCOPE OF WORK To accelerate the schedule of the project; to allow an earlier completion date. The work shall also include the construction and completion of the restrooms. In order to accomplish the work the contractor will be allowed the extension of the regular working hours to include Saturdays, Sundays and Holidays. The contractor is to attain substantial completion of said project no later than August 31", 2002. Total Cost: $603,850.59 Estimated Cost(s): Not to exceed the above described fees, unless otherwise agreed upon by the CRA. Approvals: Cesar Cala Lewis, Acting Director Executive '�7 -'- V _ c;' -)— Date s- /5 - Date Date 0 ��TI/�`l�1 Post-ii® Fax Note 7671 Pt- - .9.9 a,, IQ" y s� From CoMept. I Co Phone # 004 ', Fax # DANVILE FiN0011IFF FAX TRANSMISSION DANVILLE-FINDoRsF, iNC.. 2811 S.W, 70th Ave. Miami, FL 33155 (305) 262-9337 L:xtension 227 - Fax: (305) 262-7349 To: H.J. Aoss & Associates, Inc. ATTN: Mr, Cesar Calas /FAX 305-Sti7-177'1 May 9, 2002 (V), including cover sheet COP/-- @S TO. CRA - Annette Lewis Fax-305-372-4646 Bermello, Ajamil & Partners ATTN: Ms, Elizabeth Newland / FAX. $05-860-3759 From: Maria L Houle To: Margaret Pace Pa SCHEDULE ACCELF-RATION schedule, which shows a Project comp Attached date of August 31, 2002. Thspproposed schedule includes additional activities for the bathroom alternate. We have detailed below our costs for accelerating the which would also include completing project to allow an early contract completion date, the bathrooms during this same time frame. The schedule acceleration anticipates extended work 6 day and 7 day work weeks as dictated by the material on hand, the needs of the Project, and progress of work to meet a substantial completion date of August 31, 2002. A waiver from the nowise ordinance would be required; however, we anticipate limited work on Sundays and late hours outside the ordinance restrictions. Bathroom Alternate . .$357 ,887.09 Accelerate Bathroom Schedule 50 days .................... 40 400.00 TOTAL BATHROOM. Accelerate Balance of the Pr $397,887.09 00000 TOTAL PROPOSAL FOR ACCELERATION ........... $447,887.09 (INCLUDING BATHROOM ALTERNATE) SUBSTANTIAL COMPLETION DATE: AUGUST 31, 2002 contingent upon release of Permit and release of the foundation only for construction (i.e. underground electrical, water, and sewer, foundations, slab -on -grade, etc. OMW/CRA 02- 4Q t)ANVII_ o-FINDQRFF Inc., General Con"010ra - COnatrucdon Managers 2811 S.W. 70�1h Ave. / P.C. box 140908 /Corgi &Wlas, Florida 33114-0938 / (305j 262.9337 • FAX (305) 262.7349 may ue uk� 08:16p H.J. Ross Associates 305-567-1771 p.2 The cost breakdown for the "foundation only" work is as follows: General Conditions .......... Earthwork....... .. .........................................$15,000.00 ................................. $5, 500.00 Termite.... .................. 1 500.00 ReinforcingSteel...... Cast -in -Place Concrete.................... ............................................. .......................................$4,500.00 $a2,041J.00 Electrical Underground..................'..........................$9,500.00 .......................... 21 000.00 Plumbing Underground .......... TOTAL ........... If the permit cannot be released to allow for the work to commence immediately, we recommend a foundation only permit be applied for, which would allow the above referenced work to commence now while the balance of the permit issues are being resolved. This will allow us to meet the tight schedule requirements of this Proiect. The above costs do not include: • Temporary fencing, barricades, and costs for out of sequence work if permit issues delay immediate commencement of the work (Should this be an issue, we would complete the 'Youndation only" work as indicated above and complete the balance of the bathroom work while the park, is open. This would require the bathrooms to be cordoned off from public access.) • Permit comments that are over and above the original anticipated work I can be reached at 305-345-7427. If you have any questions, comments, or concerns, please do not hesitate to contact me. 0MINTI/C A 02— 40 2811 S.W. 70th Ave DAPN01 Box 1' 40935 Coral Gables, Florida 33114-OM / 252.9337 FAX (305) 282-7349 5 I AC4vtty 10 t1w.Anfit Odp I Rem I Early ! Early Our ` Our Bt d Finish [02�0 00.00 MASTER PERANT _ 1; 0 271dAR02A 27MAR02A MASTER PERUrr 0D-20 FOUND ONLYPERId FWIA _ 6 6 15MAY02 21MAY02 00'10 NOTICE TO PROCEED 7 .28MAR02AOBAPR02A NOTICE TO PR(00.00 •ELECTRICAL UIG8 01APR02A 129AtAY02 00.40 ELECTRICAL UIG BATH5 5 221d1AY02 27MAY02.00 EARTHWORK 15, 0 01APR02A EART111WO1 0.00 PLUMBING U5APR02A 09MAY02A 0.30 PLUMBING U1G BA1H5 5'22MAY02 27MAY02 W-21 LIGHT POLE DELIVERY 20 20 ISMAY02 06JU0.37 FIXTUREDELIVERY20 20 t5MAY02 OSJUN02 0.01 LIGHT POLE SUBM 16D00.11 FIXTURE SUBMITTAt -�5 0 - 5 0 028I0.00 fRRIGATION UIG 30 30 15WY02 '18JUN02 03300.10 BLDG t, 4 & 5 FOUNDATIONS _ 9 1 ISMAY02 ' 15MAY02 033DQ.30 BLDG 2 SLAB ON_GRADE 10. 10 28MAY02 07JUN02 BLDG 2 SLAB ON 15450.10 INSTALL PLUMBING Fl) TURE5 5: 5 15MAY02 2OWY02 02300.10 SITELAYOUT 10 -0------ - 03300.60 BLDG 1.2, 4 & 5 - 7 7 16MAY02 23MAY02 628 00.20 BLDG 1 IRRIGATION 1 _ 116MAY02 161.01AY02 16000.30 SLOG 1 6 2 ELECTRICALS 2 2 16MAY02 11MAY02 033;WW BLOC 1 SLAB ON GRADE --- 2 2 ISMAY02 20MAY02 15450.20 PLUMBING FINAL CONNECT 1 1 21MAY02 21MAY02 07411.20 BLDG 4 METAL ROOF 10 10 24MAY02 04"02 U4300.10 BLDG 5 P1S JOISTS 1 1 24MAY02 24MAY02 W910.I BLDG 1 &2 MASONRY 3• 3 24MAY02 271,1002 0612010 BLDG 1 8 2 STEEL JOISTS 3 - - 3:28MAY02 30MAY02� _0726710 ' BLDG 1 & 2 SPRAYED FFP _ 3 3 31MAY02 03JUN02 i6000.20 ELE;,TRICAI FINALCONNECT 3 3 2411AY02 21N1AX02 0 47 11.10 BLDG 1 & 2 METAL ROOF fi 6 04JUII 2 tOJUN02 04900.10 SLOG415 STONE CLADDING 9 9 06JUN02 .14JUN02+ 09210.00 (BLDG 1 & 2 STUCCO 3 3 11JUNCZ 13JUN02 ill10.00 8LDG 1 8 2 STEEL DOORtFRAME 2 2 11JUN02 12JUN02 09700.00 AL Ctc, 1 Jt 2 FPDXv FLOOR 2 2 44 lI1NO2 ! 2AUN02 10200.00 BLDG 1 & 2 LOUVERS / VENTS2 Z 19JUND212JUN02 0990D.00 .BLDG J &2 PAINTING 3 3' 14AJN02 17IM02 08710.00 'IFINISHHARDWARE �� i 113ILJN02 13JUNl)2 02610.10 INSTALLHEADS� 10 1019JIJN02 29JUN02 8hft Gale 21 SER02 LT�'II�% Easy Bar Do* 20SEPD2 Daes Date ISMAY42 Kbat B.' Wr' Dak 091MYOI 1416 P mp2ss b, C111cat Ad"y C' P1lmsvera Svslems. Inc. - - - - - - --VFOUND ONLY PERMIT BATH ED --�ELECTRIGAL U/G - ----TELECTFUCAL UIG BATH I U ING U/G T : -- �PLUMBINGUIGBATH I • UGNT POLE DELIVERY "--VFLXnJRE DELIVERY I'• I UGHf• POLE SUBM FIXTURE SUBMITTAL i .---VIRRIGATION UIG 766 BLDG 1, 4 & 5 FOUNDATIDNS - I I INSTALL PLUMBING FIXTURES • , I SITE LAYOUT 1, 2.4 & 5 BEAM&COLUMNS -'BLDG 1 WMGA1110N ! ---- WBLDG 1 & 2 ELECTPJCAL 1 SLAB ON GRADE 1 _ `-�PWMB(NGFINAL CONNECT i - -- -- VOLOO 4 METAL ROOF I I I --�5LOG 5 PIS JOISTS I! I 1 & 2 MASONRY 7 ---t9LDG 1 & 2 STEEL JOISTS II -"--'-'BLDG 1 & 2 SPRAYED F/P , - '-'-�ELECTTdCAL FINAL CONNECT I I I BLDG 1& 2 METAL. ROOF " - SLOG 4 15 STONE CLADDING i -- -- IFea oG 1 & 2 STUCCO { { I BLDG 1 & 2 STEEL DDOR/FRAME 2 EPO,YY PLOM BLOG 1 & 2 LOUVERS F VEtm I --VBLDG 1 & 2 PAINTTNO - W FINISH HARDWARE -INSTALL HEADS shN1 I of 2 V _ DANVILLE-FINDORFF, INC. MARGARET PACE PARK PHASE 18 Classic Schedule L.ayaut C t C t1 C a 'a x 0 N N N N 0 0 01 c1 (D M Ll 4 t AcH1y I AMAY 0m'0 I Rem I Early — Wy ID_ _ DesCrlpSotl Our Dur start Finish 161M.10 PREP / SET POLES _ _30,p 07JU1102 1 t�UL02 02810.30 INSTALL PUMPICONTROLS _ 3 3 01JUL02 03JUL02J' 03300'00 SITE CONC, COURTS, PADS, 27 27 12JUL02 12AUG02 02500.10 PAVING J —3 i2JUL02 i5J11L02 iiiO.10 SITE FURNISHIN_GSIEOUIP 15 15 MAUG02 29AUG02 021I0010 LANDSCAPING / SOD -- to 10113AUG02 23AU_G01 02540.i0 . PLAYCOURTSURFACE 5 5 13AUG02 17AUG02_ 02545.10 PLAYGROUND SURFACING 5 5 73AUG02 17AUG02 05720..10 AiISC. HANDRAILS— 3 3 13AUG02 f5AUG02 10155.10 TOILET COMPARTA(ENTS 3 J 11JUN02 f 3JUNo2 10155.20 'TOILET & BATH ACCESSORIES 3 3 11 IJUN02 13JUN02 17001).0 PUNCHOtfT 18 16'31AM02 20SEPOZ 10522A0 FIRE EXT1CABINETS 1 131AUG02 3fA0002 17000.OD SUBSTANTIAL COMPLETE 1 -- f 30AUG02 JOAUG02 17000.20 FINAL COMPLETION 0; 0 - 205EP02 r ;7 C) Still Dale MAW Fetish fte 20SEFW EaAi-6u Dots Dre IS AYGZ �.. ---� � am 11 Date 09MAYG2t9.26 pwets Be, Ggiral ACU ity DANVILLE-FINDORFF, INC_ MARGARET PACE PARK PHASE 1 B Classic Schedule Layout .ru°°�_f—uis�T �—L�r 1L .�11-23.__X-7••,-, 9�2.L�4,1!?._r ." —PREP/ SET POLES VINSTALL PUMPICONTROLS — 431TE CONC. COURTS, PADS, WALLS IV— __TPAVING •SRE FURNSNINGSlEOUIP 'LANDSCAPIN0130D — - -IPLAYCOURT SURPACE PLAYGROUND SURFACINO _ — VMISC. HANaRAILS -- 1 —VTOILETCOMPAMMENTS '--IT0ILET & BATH ACCE5SORM '---� PUNCftOUT —�FiRE Elt 1'lCABINET'S +SUBSTANTIAL COMPLETE _�'--FINAL COMPLETION shm 2a 2 n U C a 0 lh N 0 b Y• Ct m t0 Margaret Pace Park Change Order Summary 502002 FP 1 - SOD UPGRADE 85,663.56 -86,663.50 0.00 PENDING OWNER UiHEU i IUry FP 2 - PERMIT COSTS 3,831.28 -3,831.28 0.00 ALLOWANCE ACCOUNT FP 3 - REMOVAL OF O/G WEEDS 5,348.00 -5,348.00 0.00 ALLOWANCE ACCOUNT FP 4 - BLDG 1 MODIFICATIONS 14,225.86 -14,225.86 0.00 ALLOWANCE ACCOUNT FP 5 - ELEC / SITE MODS 4,413.14 -4413.14 0.00 ALLOWANCE ACCOUNT FP 6 - RELOCATE TRAILER 1,405.42 -1,405.42 0.00 ALLOWANCE ACCOUNT FP 7 - CREDIT PERFORATED PIPE 256.20 -256.20 0.00 ALLOWANCE ACCOU1114T' FP 8 - ROUNDUP APPLICATION 4,277.35 -4,277.35 4,277,35 ALLOWANCE ACCOUNT DTAL PENDING OWNER C.O.'S - - - 4,533.55 -33,757.25-86,663.50 4,277.35 _LOWANCE ACCOUNT 35,000 .SS RFP ABOVE ALLOWANCE -33,757.25 UPGRADE 86,663.50 SAND / FERTILIZER REQUIREMENTS 6,000.00 APPROXIMATE See A/E Memo dated 4-24-02 'ETBALl COURT REVISIONS 4,800.00 APPROXIMATE Survey, Layout i 2 MODIFICATONS KNOW TO DATE 3,500.00 APPROXIMATE AIT DRAWINGS (STRUCT NOT DETERMINED 20,00.00 APPROXIMATE Struct Drawings not Reviewed by Permit Department BURSE ALLOWANCE ACCOUNT 35,000.00 NOWNWOMMMMO 1L INCREASE FOR ALLOWANCE ACCOUNT 165,963.50 C �7 C'Q'�O"&.- 5-1-�. CITY OF MIAMI, FLORIDA INTER -OFFICE MEMORANDUM May 30,2002 TO: DATE: ITEM 11 ILE: Chairman Arthur E. Teele, Jr. and May 30, 2002 Members of the CRA Board SUBJECT: Acceleration of Margaret Pace Park FROM: REFERENCES: Construction Annette E. Lewis Acting Executive Directo ENCLOSURES: Resolution, supporting documents RECOMMENDATION It is respectfully recommended that the CRA Board of Directors approve the attached resolution authorizing the CRA Executive Director to amend the existing contract with Danville Findorff, in a form acceptable to the CRA General Counsel 1) authorizing the award of modified alternate "B" (`Bathrooms") under bid originally dated October 2001 2) for the acceleration of the construction of Margaret Pace Park by Labor Day weekend, August 31, 2002; further, authorizing the Executive Director to seek reimbursement from the City for the full cost of eligible contract activity expenditures, including all amendments through the Homeland defense/neighborhood improvement bond issue; further requesting the City Manager, pursuant to City Code Section 36-6 a (i) and (c), to permit construction between 6:00 pm and 8:00 pm, Monday through Saturday. BACKGROUND In an effort to expedite the completion of Margaret Pace Park, the CRA is interested in contracting with Danville Findorff for a modified Alternate B which will accelerate the project for completion by August 31, 2002. The acceleration authorizes Danville Findorff to work extended 6-7 days work weeks, with more manpower to complete the project. General Source: OMNI TIF, Homeland Defense/Neighborhood Improvement Bond Issue Account Number: 686001.590320.6.860 OMINT/C'p A 02- 40