Loading...
HomeMy WebLinkAboutSEOPW-CRA-R-01-0048SEOPW/CRA ITEM 8D RESOLUTION NO. SEOPW/CRA O 1 _ 4 8 A RESOLUTION OF THE BOARD OF DIRECTORS OF THE COMMUNITY REDEVELOPMENT AGENCY ("CRA") AUTHORIZING THE CRA TO PIGGY BACK OFF THE CITY OF MIAMI'S (THE "CITY") CONTRACT WITH METRIC ENGINEERING, IOC, AN ENGINEERING FIRM ON THE CITY APPROVED LIST OF PROFESSIONAL CONSULTANTS AND FURTHER TO NEGOTIATE AN AGREEMENT IN A FORM ACCEPTABLE TO THE CITY ATTORNEY WITH DETAILED SCOPE SERVICES AND WORK PLAN TO BE SUBMITTED AND APPROVED BY THE BOARD AT THE NEXT CRA BOARD MEETING. WHEREAS, the City of Miami approved and adopted the Southeast Overtown/Park West Community Redevelopment Plan pursuant to Resolution Nos. 82-755 and 85-1247 (the "Redevelopment Plan"); and WHEREAS,. the City of Miami approved and adopted the designation of NW 3rd Avenue [D.A. Dorsey Way] from NW 8th Street to approximately NW 14th Street as the Historic Overtown Priority Business Corridor (the "Corridor") pursuant to City Resolution No. 98-592; and WHEREAS, the CRA was authorized to promote and support commercial developments along the NW 3rd Avenue Corridor by constructing new infrastructure improvements and other amenities necessary for the new and existing businesses in the Corridor pursuant to CRA Resolution SEOPW/CRA 98-14; and S]EOPW/CRA 01- 48 WHEREAS, the CRA was authorized to prepare and apply to the United States Economic Development Administration ("EDA") for a $3 million grant for the purpose of funding qualified commercial development activity in the NW 3rd Avenue Corridor pursuant to CRA Resolution No. SEOPW/CRA 98-15; and WHEREAS, the CRA desires to piggy back off the City of Miami's contract with Metric Engineering, an engineering firm of the City of Miami's approved list of professional consultants; and WHEREAS, the CRA desires to provide a detailed scope of services and work plan to be submitted and approved by the CRA Board at the next Board meeting; and NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE COMMUNITY REDEVELOPMENT AGENCY OF THE CITY OF MIAMI, FLORIDA: Section 1. The recitals and findings contained in the Preamble to this Resolution are hereby adopted by reference and incorporated as if fully set forth in this Section. Section 2. The Board of Directors of the CRA hereby authorizes the CRA to piggy back off the City of Miami's contract with Metric Engineering, an engineering firm of the City of Miami's approved list of professional consultants. Page 2 of 3 SEOPW/CRA 01-- 48 Section 3. The Board of Directors of the CRA hereby authorizes the CRA Executive Director to negotiate an agreement in a form acceptable to the City Attorney, providing a detailed scope of services and work plan, all to be submitted and approved by the CRA Board at the next Board meeting. Section 4. This Resolution shall become effective immediately upon its adoption. PASSED AND ADOPTED this 21st day of May 2001. ATTEST: Walter J. Foeman City Clerk APPROVED AS FORM AND COR NE¢ 1, it rello it ttorney Arthur E. Teele, Jr., Chairman Page 3 of 3 SEO PW/C,`RA 01- 48 `SEOPW AND OMNI/CRA CITY CLERK'S REPORT MEETING DATE: May 21, 2001 Direction to the Executive Director of the CRA: by Vice Chairman Winton to have clear recommendations and background information in the backup documentation for CRA agenda material. Page No. 18 ITEM 8-d A RESOLUTION OF THE SOUTHEAST SEOPW/CRA R-01-48 OVERTOWN/PARK WEST COMMUNITY MOVED: WINTON REDEVELOPMENT AGENCY (THE "CRA") SECONDED: GORT AUTHORIZING THE CRA TO PIGGYBACK OFF UNANIMOUS THE CITY OF MIAMI' S CONTRACT WITH METRIC ENGINEERING, INC., AN ENGINEERING FIRM ON THE CITY OF MIAMI' S APPROVED LIST OF PROFESSIONAL CONSULTANTS, IN AN AMOUNT NOT TO EXCEED THE CONTRACT, WITH DETAILED SCOPE OF SERVICES AND WORK PLAN TO BE SUBMITTED AND APPROVED BY THE BOARD AT THE NEXT MEETING; FURTHER AUTHORIZING THE CRA EXECUTIVE DIRECTOR TO EXECUTE SAID CONTRACT AND TO ISSUE NOTICES TO PROCEED PURSUANT TO ANY SCOPE OF WORK RELATING TO THE N.W. 3P-" AVENUE [D.A. DORSEY WAY] EXTENSION TO THE 9TH STREET PEDESTRIAN MALL. SEOPW/CRA, 01-- 48 J IO-OPW/CRA ITEM 8D I � �1U 1' • RESOLUTION NO. SEOPW/CRA A RESOLUTION OF THE BOARD OF DIRECTORS OF THE COMMUNITY REDEVELOPMENT AGENCY ("CRA") AUTHORIZING THE CRA TO PIGGY BACK OFF THE CITY OF MIAMI'S (THE "CITY") CONTRACT WITH METRIC ENGINEERING, INC, AN ENGINEERING FIRM ON THE CITY OF MIAMI'S APPROVED LIST OF PROFESSIONAL CONSULANTS, IN AN AMOUNT NOT TO EXCEED THE CONTRACT, WITH DETAILED SCOPE OF SERVICES AND WORK PLAN TO BE SUBMITTED AND APPROVED BY THE BOARD AT THE NEXT MEETING. FURTHER AUTHORIZING THE CRA EXECUTIVE DIRECTOR TO EXECUTE SAID CONTRACT AND TO ISSUE NOTICES TO PROCEED PURSUAN TO ANY SCOPE OF WORK RELATING TO THE NW 3an AVENUE [D.A. DORSEY WAY] EXTENSION TO THE 9TH STREET PEDESTRIAN MALL. WHEREAS, the City of Miami approved and adopted the Southeast ® Overtown/Park West Community Redevelopment Plan pursuant to Resolution Nos. 82- 755 and 85-1247 (the "Redevelopment Plan"); and WHEREAS, the City of Miami proved and adopted the designation of NW P Avenue [D.A. Dorsey Way] from NW 8 Street to approximately NW 14d' Street as the Historic Overtown Priority Business Corridor (the "Corridor") pursuant to City resolution 98-592; and • WHEREAS, the CRA was authorized to promote and support commercial developments along the NW 3rd Avenue Corridor by constructing new infrastructure improvements and other amenities necessary for the new and existing businesses in the Corridor pursuant to CRA resolution SEOPW/CRA 98-14; and WHEREAS, the CRA was authorized to prepare and apply to the United States Economic Development Administration ("EDA") for a $3 Million grant for the purpose of funding qualified commercial development activity in the NW P Avenue Corridor pursuant to CRA resolution SEOPW/CRA 98-15; and WHEREAS, the CRA is responsible for carrying out community redevelopment activities and projects in the Southeast Overtown/Park West Redevelopment Area (the "Redevelopment Area") established pursuant to the Redevelopment Plan; and SEOPW/CRA • *,--OPW/CRA ITEM 8D WHEREAS, the CRA desires to piggy back off the City of Miami's contract with Metric Engineering, an engineering firm of the City of Miami's approved list of professional consultants, in an amount not to exceed the contract; and WHEREAS, the CRA desires to provide a detailed scope of services and work plan to be submitted and approved by the CRA Board at the next Board meeting; and WHEREAS, the CRA desires to execute said contract and to issue notices to proceed with any scope of work relating to the NW 3`d Avenue [D.A. Dorsey Way] extension to the 9�h Street Pedestrian Mall. NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE COMMUNITY REDEVELOPMENT AGENCY OF THE CITY OF MIAMI, FLORIDA: Section 1. The recitals and findings contained in the Preamble to this Resolution are incorporated herein as is fully set forth in this Section. Section 2. The Board of Directors of the CRA hereby authorizes the CRA to piggy back off the City of Miami's contract with Metric Engineering, an engineering firm of the City of Miami's approved list of professional consultants, in an amount not to exceed the contract Section 3. The Board of Directors of the CRA hereby authorizes the CRA Executive Director to provide a detailed scope of services and work plan to be submitted and approved by the CRA Board at the next Board meeting. Section 4. The Board of Directors of the CRA hereby authorizes the CRA's Executive Director to execute said contract and to issue notices to proceed with any scope of work relating to the NW 3`d Avenue [D.A. Dorsey Way] extension to the 9"' Street Pedestrian Mall.. Section 5. This resolution shall be effective upon its adoption. PASSED AND ADOPTED on this 21" day of May, 2001. Arthur E. Teele, Jr., Chairman • 01- 48 SEOPW/CRA • 4*0PW/CIA ITEM 8D • ATTEST: Walter J. Foeman, City Clerk APPROVED AS TO FORM AND CORRECTNESS: Alejandro Vilarello City Attorney • 01, 48 SEOPW/OR" MAY. 12001 1 : 3 1 P M N0.3929 P. 2 METRIC ENGINEORING,INC. CONSULTING ENGINEERS - PLANNERS - SURVEYORS 13940 S.W. 136 STREET SUITE 200 MIAMI, FLORIDA 33186 PHONE: (305) 235-5090 FAX: (305) 251-5894 TN\ za File: Contract April 30, 2001 CITY OF MIAMI Community Redevelopment Agency 300 Biscayne Blvd. Way, Suite 430 'orida 33131 Attention: Mr. Dipak M. Parekh Executive Director Reference; PROPOSAL - "NW 3rd AVENUE IMPROVEMENTS" (From NW 9t' St. to NW 11 t, Street) City of Miami, Florida Dear Mr. Parekh: We thank you for the opportunity to participate in the design of the proposed streetscape improvements for the referenced project. Enclosed for your review and approval is a copy of the proposed Scope of Services and associated fees for this project. We would be happy to meet with you and discuss the terms of this proposal to ensure that it properly reflects the work effort expected, Should you have any questions, comments or require additional information, please let us know at your earliest convenience. Sincerely, METRIC ENGINEERING, INC. MANUEL BENITEZ, P.E. Vice President MB fjm Copy: John King, P.E.( Civil-Cadd) Contract File 01- SEOPWI "e .MAY. .2. 2001 1:32PM NO.3929 P. 3 • • CITY OF MIAMI Community Redevelopment Agency PROPOSAL for "NW P AVENUE IMPROVEMENTS" (From NW 9"' St. to NW 11" Street) City of Miami, Florida The City of Miami Community Redevelopment Agency (Client) is proposing the extension of the Ninth Street Mall decorative sidewalks and intersection improvements to NW 3'd Avenue. The proposed streetscape improvements will extend North and within the NW 3`° Avenue Right of Way from the intersection with NW 9t' Street to and including the intersection with NW 118, Street. Metric Engineering, Inc. (Engineer) will design the proposed improvements in accordance with the following Scope of Services: =PE OF�_ERV GES TASK 1: ROUTE SURVEY a) The Engineer will conduct a Route Survey within the project limits described above to include the following: b) Location of all utility castings, limits of existing pavement, medians, curbs, sidewalks, trees and all other significant above ground features for the entire width and length of the affected right-of-way(s). Survey baseline/centerline will be established along the route with stationing proceeding south to north and west to east. c) The route survey will be conducted under the direction of; and certified by, a Professional Land Surveyor registered in the State of Florida. TASK 2: DATA COLLECTION & UTILITY COORDINATION a) The Engineer will submit a written request for utility information (record as -built) to the appropriate utility companies (i.e.: FPL, Bellsouth, MDWASD, etc.). In addition, the Engineer will coordinate with F.P. & L. assuming that overhead electrical lines will be relocated underground in order to facilitate the proposed streetscape improvements. b) The Engineer will review and analyze information received from the utility companies, combine with the final route survey and prepare engineering base maps for final design. 2 0 1 — 48--e SEOPW/CIA MAY. 2.2001 1:32PM NO.3929 P. 4 TASK 3: ANALYSIS AND DESIGN 491 a) The Engineer will develop Schematic Design, Design Development and Construction Documents for the proposed Streetscape improvements. The design approach will follow the design concept approved for previous phases of the project, which includes sidewalk and intersection improvements utilizing concrete unit pavers in a "beaded motif", pavement milling and resurfacing, street lighting, traffic signage and pavement marking improvements. The design drawings will be prepared in accordance with the latest Engineering Standards for Design and Construction established by the City of Miami Department of Public Works. b) The Engineer will prepare Technical Specifications for the applicable project components following the format established by the City of Miami Department of Public Works. It is presumed that the Client will provide standard front end ("Boiler Plate") and technical specifications to the Engineer in hard and electronic formats for reference. The Engineer will modify and supplement the standard specifications as needed to satisfy project specific c) The Engineer will prepare an Engineer's Opinion of Probable Construction Costs for the applicable improvements. All drawings will be prepared using MicroStationO software and Engineer's drafting standards. All annotations and dimensions will be provided in English units. All written documents will be prepared in MS -Word format. TASK 4: REGULATORY PROCESS ASSISTANCE ® a) The Engineer will assist the Client in obtaining approvals from the regulatory agencies having jurisdiction over the project, limited to providing the Client with the necessary sets of construction documents and applicable calculations required by the regulatory agencies and revise construction documents as needed to reflect agency review comments. This proposal presumes that the Client will be responsible for submittal of the construction documents and applicable permit fees to the regulatory. agencies and obtaining the necessary permit/approvals. TASK 5: -BIDDING SERVICES The Engineer will assist the Client during the bidding Phase of the project, limited to: a) Providing responses to Bidders' R.F.1.'s and clarifications of construction drawings. b) Prepare addenda related to the construction documents, if needed. TASK fi: CONSTRUCTION SERVICES The Engineer will provide assistance during the construction phase of the project as follows: a) Attend pre -construction meeting with Client and the selected Contractor. b) Review shop drawings and evaluate the acceptability of substitute ("or equal") materials submitted by the Contractor. • c) Respond to Requests for Information submitted by the Contractor during Construction and issue clarification of the construction documents, if needed. 3 01- 48 SEOPW/O ; MAY. 2.2001 1:32PM NO.3929 P. 5 0 Task 7: COORDINATION MEETINGS • a) The Engineer will attend coordination meetings requested by the Client, limited to a maximum of EIGHT (8) local meetings during all phases of the project. All meetings will be attended by the Engineer's designated Project Manager and Project Engineer. Attendance to additional meetings will be considered additional services. As detailed in the attached Engineering Fee Estimate. The Engineer will submit monthly invoices for services rendered and costs incurred in accordance with the terms and conditions stipulated in signed agreement between Client and Engineer. s At the request of the Client, Engineer's services will be compensated based on Two Project Segments, described as follows: Segment One: Streetscape improvements extending North and within the NW 3`d Avenue Right of Way from the intersection with NW 9"' Street and terminating approximately 150 feet south of the intersection with NW I ft' Street. Segment Two: Streetscape improvements starting at the terminus of Segment One and extending North and within the NW 3'd Avenue Right of Way to and including the intersection with NW 11 uh Street. The following services will not be required by the Client, thus excluded from the above Scope of Services and associated fees: a) Attendance to City Commission and County Commission meetings. b) Improvements such as traffic studies and signalization improvements, water, sewer, drainage design. c) Research, coordination and preparation of Legal Descriptions for Utility Easements, if required for this project. d) Preparation of Pollution Remediation plans, EnvironmentaVContamination site assessments and environmental permitting, if applicable to this project. e) Construction Contract Administration and Construction inspections. f) Engineering testing (le: Drainage Tests, Soils Borings, etc.) Services. The Engineer will be pleased to provide a proposal for the above services, if so requested by the Client and/or required by the regulatory agencies. -END- PROPOSAL 4 01 - 4 8 � SEOPW/CRA- Metric Engineering, Inc. 13940 S.W. 136th Street, Suite 200 Mlaml, Florida 33186 (305)235-5098 COST PROPOSAL SUMMARY(SEGMENT ONE) CITY OF MIAM1 COMMUNITY REDEVELOPME AGENCY NW 3rd AVENUE IMPROVEMENTS C.1.13 Project No., TBO NO. / ACTIVITY Project Manager Professional En sneer Engineer Technician Hours $70.00 $55.00 Cost For Activity Average Hourly Refs $10100 $90.00 SK 2; Data CollectlenWill, Coord. 3:ANALYSIS AND DESIGN 2 8 40 16 66 $4,600.00 rTASK Schematic Design B 12 20 10 50 $3,830.00 Design Development 18 40 66 40 154 $11.520.00 Construction Documents 36 so 104 80 300 $22,460.00 ASK 4: Regulatory Procese Assistance 4 4 12 8 28 $2,040.00 TASK 5: Bidding Phase ServTce6 4 9 6 4 22 $1'760.00 TASK 6: Construction Services 8 8 26 8 50 $3,790.00 TASK7: Coordination Meetfn SIX( 24 12 12 0 14B $4.320.00 TOTAL MANHOURS 104 172 276 166 $19.320.00 $9,130.00 71B W,330 00 $75.67 TOTAL SALARY COSTS $10,400.00 $115,480.0of TOTAL CONTRAC I rtt uvroru A���n her Costs: Total Activity Salary Costs $54,330.00 Subconsullanl Servloes (WRT) Task 1: Route Survey $3,0W.0( Schematic Design $3,000.00 5ubconsultanl Services (WRI) $15,000.0( Design Development 3000.00 Construction Documents 6000.00 Total (Lump Sum Services) $72,330.01 Bidding Assistance 750.00 Construction Phase $2,250.00 Reimbursable Costs(printing, mileage, sic.) a 5% of total $3,816.51 $15,000.00 )) TASK 1: ROUTE SURVEY(by Metric) $3,000.00 GRAND TOTAL $75,900.00 Prepared By: Manuel Benitez, P.E. Date: 04=01 (X) Inilial Estimate j ] Revision No.1 I Revision No. 2 If revised estimate, give reason for revisions: COST PROPOSAL SUMMARY( SEGMEN,, TWO) CITY OF MIAMI COMMUNITY REDEVEL.OPMEN, AGENCY Metric Engineering, Inc. NW 3rd AVENUE IMPROVEMENTS 13240 S.W. ISM Street, Suite 200 C.I.P Project No.: TBD Miami, Florida 33186 (305)235-5098 Professional Cost Average NO./ACTIVITY Proect Mana er En ineer Engineer Technician HoUm Aa° Rat Hourly $tOD.DD $90.001 $70.00 1 $55,DD TASK 2; Data CollectlonlUtii. Coord. 21 4 12 4 22 $1,620.00 TASK 3: ANALYSIS AND DESIGf1 8 20 $1,380.00 Schematla Design 2 2 8 24 16 52 $3,66D.00 Design Development 4 B 40 40 104 $7,240.00 Construction Documents 8 16 12 8 28 $2,040.00 TASK 4: Regulatory Process Assistance 41 48- 4 2 18 $1,510.00 TASKS:altidin Phase Services 4 16 ID 38 $2,790.00 TASK 6: Construction Services 41 8 4 0 1s $1,440.00 TASK 7: Coordination Meet(n s(TWO)8 4 TOTALMANHOURS 36 54 1201 88 298 $21,700.00 $72.82 TOTAL SALARY COSTS $3,600.00 $4.1360-001 $8,40D.00 $4,840.0O FEE COMPUTATION (Check Appropriale Box) TOTAL CONTRACT (X) Initiat Estimate Other Costs: Total Activity Salary Costs $21,700.00 [ )Revlslon No. 1 a) Subconsullant Services (WRT) Task 1: Route Survey $1,000.00 I $5,00o.00 ti ) Revlslon No. 2 revised estimate, give reason Schematic Design $1,000.00 Suboonsullard Services (WRT) for revisions: Design Development Construction Documents 1000.00 2000.00 Total (Lump Sum Services) $27,700,00 Bidding Assistance 250.00 Reimbursable Costs(printing, mileage, etc.) @ 5% of total $1,385.00 Construction Phase $750.00 $5,000.00 b) TASK 1: ROUTE SURVEY(by Metric) $1,000.00 GRAND TOTA3 $29,100.00 b �I -r•P. �o Prepared By: Manuel Benitez, P.E. Date. OV30101 by: -00 FROM is • Chairman Teele and Members of the CRA Board Dipak M. Parekli, i Executive Director ' RECOMMENDATION CITY OF MIAMI. FLORIDA ITEM 8d INTER -OFFICE MEMORANDUM May 21, 2001 DATE: FILE . CRA authorizes a contract with Metric SUBJECT Engineering, Inc., which is on the City of Miami's approved list of professional consultants with the sum not exceeding the REFERENCESamount of the contract that is presently in place with the City. ENCLOSURES: Resolution It is recommended that the Southeast Overtown/Parkwest Community Redevelopment Agency (CRA) authorizes a contract with Metric Engineering, Inc. which is on the City of Miami's approved list of professional consultants with the sum not exceeding the amount of the contract that is presently in place with the city, it is further recommended that the Board authorize the Executive Director to execute said contract and to issue notices to proceed with any work relating the NW 3rd Avenue (Dorsey Way) Extension. BACKGROUND The attached resolution approves a contract with Metric Engineering, Inc, an approved City of Miami professional consultant firm, for a sum not to exceed that which they already have accepted with the City of Miami in another existing contractual obligation. It is also authorizes the Executive Director to proceed with the work need in the NW 3`d Avenue Extension to the Pedestrian Mall. Funding Source: N/A Account Number: N/A €i1- 48 SEOPW/O