Loading...
HomeMy WebLinkAboutSEOPW-CRA-R-00-0098RESOLUTION NO. SEOPW/CRA R-00-98 A RESOLUTION OF INTENT OF THE BOARD OF DIRECTORS OF THE COMMUNITY REDEVELOPMENT AGENCY ("CRA") TO AUTHORIZE THE OWNER OF THE ARENA SQUARE APARTMENTS, JOINTLY WITH THE CRA, TO DEVELOP A PLAN FOR A $900,000.00 GRANT TO THE ARENA SQUARE APARTMENTS BASED ON A FIVE TO ONE LEVERAGE RATIO TO PAY FOR IMPROVEMENTS TO THE ARENA SQUARE APARTMENTS IN A MANNER CONSISTENT WITH THE THIRD AVENUE BUSINESS CORRIDOR AND THE OVERTOWN CHARRETTE SUBJECT TO THE IMPLEMENTATION OF AFFORDABLE HOUSING DEED RESTRICTIONS WITH RESPECT TO THE ARENA SQUARE APARTMENTS. WHEREAS, the City of Miami approved and adopted the Southeast Overtown/Park West Community Redevelopment Plan pursuant to Resolution Nos. 82-755 and 85-1247 (the "Redevelopment Plan"); and WHEREAS, the CRA is responsible for carrying out community redevelopment activities and projects in the Southeast Overtown/Park West Redevelopment Area (the "Redevelopment Area") established pursuant to the Redevelopment Plan; and WHEREAS, the CRA desires that the owner of the Arena Square Apartments, jointly with the CRA, develop a plan for a $900,000.00 grant to the Arena Square Apartments based on a five to one leverage ratio to pay for improvements to the Arena Square Apartments in a manner consistent with the Third Avenue Business Corridor and the Overtown Charrette subject to the implementation of affordable housing deed restrictions with respect to the Arena Square Apartments. NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF DIRECTORS OF THE COMMUNITY REDEVELOPMENT AGENCY OF THE CITY OF MIAMI, FLORIDA: Section 1. The recitals and findings contained in the Preamble to this Resolution are incorporated herein as if fully set forth in this Section. Fps sywlc Section 2. The Board of Directors of CRA hereby authorizes the owner of the Arena Square Apartments, jointly with the CRA, to develop a plan for a $900,000.00 grant to the Arena Square Apartments based on a five to one leverage ratio to pay for improvements to the Arena Square Apartments in a manner consistent with the Third Avenue Business Corridor and the Overtown Charrette subject to the implementation of affordable housing deed restrictions with respect to the Arena Square Apartments. Section 3. The resolution shall be effective upon its adoption. PASSED AND ADOPTED on this 25th day of September, 2000. t t; 4-�w7� - ft, - � Arthur E. Teele, Jr., Chairman ATT alter4—FiIe"man, City Clerk . APPROVED AS TO FORM AND CORRECTNESS: Holland & Knight LLP CRA Legal Counsel MIA1 #972505 v1 �40— 9 New Arena Square North & South Ltd. 1023 N.W. 3 Avenue Miami, Florida 33136 Tel. (305) 372-1383 Fax. (305) 374-4451 September 18, 2000 City of Miami Community Reinvestment Agency Mr. Arthur E. Teele Jr., Chairman 300 Biscayne Boulevard Way, Suite 430 Miami, Florida 33131 Re: New Arena Square Development Dear Mr. Teele: Thank you for the meeting and attention that you and your staff dedicated to the idea of upgrading the design plans for the buildings located on the Third Avenue corridor. As explained in our meeting the Equity Partners (Guilford Capital Corp., Montgomery Al.) has committed a total investment of approximately $14,000,000.00 to the complete redevelopment of the 12 buildings of New Arena Square, which together with $1,550,000.00 approved by City of Miami Economic Development takes it to a grand total of $15,550,000.00 (Holland & Knight document enclosed). The two buildings located on the third avenue corridor are 268 N.W. 11 St. and 275 N.W. 10 St. with an as is combination of 162 apts. mainly one bedroom units and approximately 7500 sq. ft. of small stores fronting third avenue. Our original plans are for 100% gutted rehabilitation, with everything new in the apartments and a change to 124 unit mix composition with 76% two and three bedroom units, and a budget of $4,045,268.00 (cost breakdown enclosed) for both buildings covering only the housing portion of the properties, without any changes in the exterior (besides painting) or any repairs in the commercial area. When the announcement of development plans of the Third Avenue corridor, we thought that being our property at the South entrance of the corridor, it would be great for the area and the community to come up with additional plans on a design that would completely change the image of Overtown and would make a statement of how future development should set the standards from and that is what we are submitting herewith. To accomplish the above in accordance to the additional plans and cost breakdown enclosed, we are respectfully requesting a grant in the amount of $1,167,187.00 that will cover all of the items not included in our original development budget. We are very excited about the beautification of the third avenue corridor and strongly believe that will be extremely helpful in turning around the image and the economy of the Overtown Community. Sincerely, New Arena S uare rth & South Ltd. Salom en rOpWice,. Law Offices HOLLAND & NIGHT LLP 701 Brickell Avenue, Suite 3000 P.O. Box 015441(ZIP 33101-5441) Miami, Florida 33131 305-374-8500 FAX 305-789-7799 www.hklaw.com September 15, 2000 Mr. Salomon Yuken 1023 N.W. 3rd Avenue Miami, Florida 33136 Atlanta Orlando Boston Providence Bradenton St. Petersburg Chicago San Francisco Fort Lauderdale Seattle Jacksonville Tallahassee Lakeland Tampa Los Angeles Tokyo Melbourne Washington, D.C. Mexico City West Palm Beach Miami Rep wAbi veper: New York BMW Aims Northern Virginia Tel Aviv LYNN C. WASHINGTON 305-789-7798 Internet Address: lwashing@hklaw.com Re: Confirmed Financing For New Arena Square North and South, Ltd. Dear Mr. Yuken: The purpose of this letter is to confirm the committed financing for the rehabilitation of the buildings owned by New Arena Square North and South, Ltd. (the "Partnership"). As of this date, the Partnership has committed financing in the amount of $15,534,791 from the following sources: 1. City of Miami/CDBG 2. City of Miami/HOME 3. Guilford Capital Corporation 4. Guilford Capital Corporation $300,000 $1,250,000 $1,213,791 (existing equity) $12,771,000 (new equity) If you need any further questions regarding this matter, please do not hesitate to contact me. Very truly yours, HOLLAND & KNIGHT up By: 9A' � � e -W. Lynn Washington MIAl #972282 vl ) 2921 N.W. 6th Ave. �1 Miami, FL 33127 Tel. (305) 571-8353 Fax (305) 571-8357 Contractor's & Mortgagor's: Cost Breakdown: Schedules of values: Date: April 11 ", 2000 Project Name: New Arena Square Apts. Location: 275 N.W. 101" St. Builder: Encore Builders, Inc. Address: ,- 2921 N.W. 60' Avenue Arquitect: Forma Arquitect Address: 3451 N.E. 160 St. —North Miami Beach, FL. General Conditions: Temporary facilities: Site cleaning: Conc. Cutting: Excabations: Clean-up & hauling: Site Utilities: Water supply & related items: Sanitary sewer: Electric service: Storm sewer & drainage: Site Improvements: Fences: Walls, columns: Trash collection pad: Road & Walks: Curb & gutter: Sidewalk: Asphalt resurfacing: Description: Cost: Temporary toilet. 1680.00 Prepare & clean as needed. 7500.00 For new plumbing & elect. 10,500.00 As required. 5700.00 Remove & disp of all debri. 8000.00 Repair or provide & inst. New. 9500.00 Provide new as per plans. 750.00 Repair as needed. 4700.00 Repair as needed. 3500.00 Resurface existing. 6000.00 OEOPWICRA � 0 - . 0 Arquitectural & Structural: Conc. Material: Conc. Labor: Lumber rough carpentry: Lumber finish carpentry: Door, jambs, & hardware: Windows: Window sills: Cabinets, kitchen, others: Ornamental iron: Roofing & downspouts: Plumbing rough: Plumbing finish: Electrical rough: Electrical finish: Air & heat rough: Air & heat finish: Framing lumber: Framing labor: Floors: Finish floors: Lath, plaster, sheetrock: Tile work, bathrooms fls & walls: Exterior stucco: Interior painting: Exterior painting: Plumbing fixtures: Electrical fixtures: Closet shelves & rods: Appliances: Landscaping: Concrete, asphalt, pavers: Walks & exterior stairs: Fire extinguishers: Fire alarm: Termite treatment: Clean-up during & after const. Mailboxes: Security: Pour all trenches & bathrms firs. Excavate, prepare, pour & finish. All necessary repairs int. & ext. All int. & ext. finishes. Provide & install new int. & ext. Repair or replace as needed. Marble window sills. Kitchen & med. Cabinets. Repair railings & rails. Remove as needed. Abandon existing re -pipe. All finish inst. of fixtures. Complete rewire & new meters. All trim after drywall & paint. New central air & heat (pump). Prov. & inst all grills & thermt. As needed per plans & specs. As needed per plans & specs. Gyperete 2"d & 3rd floors. Vinyl tile entire unit. Drywall/finish texture. As required per plans & specs. Repairs as needed. Seal & paint all units. Pressure clean & paint. All fixtures & faucets. Ceiling fans, lights. As required. Range, frig, w/heater, disposal. Sod, shrubs & trees. As per plans. Repair as needed. In each unit. As req. by fire dept. By tent method. As needed. Postal approved. 180 days @ 16 hrs @ 6.25. 16,000.00 25,000.00 33,000.00 63,515.00 70,444.00 40,202.00 4000.00 55,000.00 6000.00 50,000.00 120,927.00 33,758.00 224,263.00 37,533.00 93,410.00 31,758.00 24,436.00 38,870.00 25,984.00 60,000.00 95,273.00 65,000.00 18,660.00 36,458.00 26,561.00 63,515.00 32,000.00 19,050.00 56,000.00 11,550.00 8660.00 4330.00 1960.00 22,000.00 6200.00 16,000.00 1960.00 21,000.00 '47,C)PWICRA: Sub Total: Builders overhead & profit 25%: Total Cost: rr��PV�/CRAi 1,618,107.00 404,527.00 2,022,634.00 r 2921 N.W. 6th Ave. Miami, FL 33127 Tel. (305) 571-8353 Fax (305) 571-8357 Contractor's & Mortgagor's: Cost Breakdown: Schedules of values: Date: April 14t', 2000 Project Name: New Arena Square Apts. Location: 268 N.W. I Vh St. Builder: Encore Builders, Inc. Address: 2921 N.W. Oh Avenue Arquitect: Forma Arquitect, Address: - 3451 NE 164t' Sf. - North Miami Beach, FL. General Conditions: Description: Cost: Temporary facilities: Temporary toilet. 1680.00 Site cleaning: Prepare & clean as needed. 7500.00 Conc. Cutting: For new plumbing & elect. 10,500.00 Excabations: As required. 5700.00 Clean-up & hauling: Remove & disp of all debri. 8000.00 Site Utilities: Water supply & related items: By owner. Sanitary sewer: By owner. Electric service: By owner. Storm sewer & drainage: Site Improvements: Fences: Repair or provide & inst. New Walls, columns: Trash collection pad: Provide new as per plans. Road & Walks: Curb & gutter: Sidewalk: Asphalt resurfacing: Repair as needed. Repair as needed. Resurface existing. , i OP t 14 CRA 9500.00 -0- 750.00 4700.00 3500.00 6000.00 tf _` Arquitectural & Structural: Conc. Material: Pour all trenches & bathrms flrs. 16,000.00 Conc. Labor: Excavate, prepare, pour & finish. 25,000.00 Lumber rough carpentry: All necessary repairs int. & ext. 33,000.00 Lumber finish carpentry: All int. & ext. finishes. 63,515.00 Door, jambs, & hardware: Provide & install new int. & ext. 70,444.00 Windows: Repair or replace as needed. 40,202.00 Window sills: Marble window sills. 4000.00 Cabinets, kitchen, others: Kitchen & med. Cabinets. 55,000.00 Ornamental iron: Repair railings & rails. 6000.00 Roofing & downspouts: Remove as needed. 50,000.00. Plumbing rough: Abandon existing re -pipe. 120,927.00 Plumbing finish: All finish inst. of fixtures. 33,758.00 Electrical rough: Cpmplete rewire & new meters. 224,263.00 Electrical finish: = All trim after drywall & paint. 37,533.00 Air & heat rough: New central air & heat (pump). 93,410.00 Air & heat finish: Prov & inst all grills & thernits. 31,758.00 Framing lumber: As needed per plans & specs. 24,436.00 Framing labor: As needed per plans & specs. 38,870.00 Floors: Gyperete 2H & 3d floors. 25,984.00 Finish floors: Vinyl tile entire unit. 60.000.00 Lath, plaster, sheetrock: Drywall/finish texture. 95,273.00 Tile work, bathrooms fls & walls: As required per plans & specs. 65,000.00 Exterior stucco: Repairs as needed. 18,660.00 Interior painting: Seal & paint all units. 36,458.00 Exterior painting: Pressure clean & paint. 26,561.00 Plumbing fixtures: All fixtures & faucets. 63,515.00 Electrical fixtures: Ceiling fans, lights. 32,000.00 Closet shelves & rods: As required. 19,050.00 Appliances: Range, frig, w/heater, disposal. 56,000.00 Landscaping: Sod, shrubs & trees. 11,550.00 Concrete, asphalt, pavers: As per plans. 8660.00 Walks & exterior stairs: Repair as needed. 4330.00 Fire extinguishers: In each unit. 1960.00 Fire alarm: As req. by fire dept. 22,000.00 Termite treatment: By tent method. 6200.00 Clean-up during & after const. As needed. 16,000.00 Mailboxes: Postal approved. 1960.00 Security: 180 days @ 16 hrs @ 6.25. 21,000.00 Sp_OPW / CRA Sub Total: Builders overhead & profit 25%: 1,618,107.00 404,527.00- Total Cost: 2,022,634.00 � ,,OPWICRA 9 O lk_.j V L �I2't�DrrE ��.tt�EXS, �2'Ct. 2921 N.W. M Ave. Miami. FL 33127 Tel. {3QlS) 571-WW Fax 67/41367 September 18, 2000 New Arena Square North & South 275 N.W. l 0`h St. Miami, FL 33136 Re: 275 and 268 Buildings Attention: Mr. Salomon Yuken: Addendum # 1 to original construction plan. This addendum covers the area comprised of buildings - 268 N.W. 11 St. and 275 N.W. 10`h St. fronting 3`d ave_ Removal of interiors of existing commercial & residential units: Shores & scaffolding as needed. Clean up & hauling of all debris: Structural & Arquitectural: 50,000.00 New addition to existing, commercial and Residential rants as per plans & specs. New foundations New CBS walls New tie beam & columns New floor slabs New roof 340,000.00 Front elevation along 3 d ave. Construction of new entrance with arch & columns as per plans &. specs. � SOPW % M i r" �� r S New store fronts and enlargement addition. New stucco to entire faeade and sidcwa)ls. Removal where needed of CBS overhang and refinish as needed. Construction of four decorative towers with Spanish file roofs. Decorative crown roof & windows. Two glass caps elevators. Sub Total: Profit & Overhead 25%: Total Addendum #2 Public Works: a. Provisions for a temporary protected pedestrian walkway With temporary lighting along 3d ave. from 10 street to. 11 Street. , b. Removal of existing sidewalk c. Removal of existing curb & gutter. d. Replace sidewalk with interlocking pavers. e. Build new island planters as approved by D.O.T. and /or Public Works Department. £ Build new curb & gutter as required Sub Total: Profit & Overhead 25%: Total Thank you for your attention to this matter. SUOPWICRA 425,000.00 815,000.00 203,750.00 1,018,750.00 118,750.00 29,697.00 148,437.00 0 CITY OF MIAMI, FLORIDA TO: Chairman Teele and Members of the CRA Board FROM : Robert L. Tyler Dir. Of Op., Admin. & Dev. INTER -OFFICE MEMORANDUM DATE . September 18, 2000 FILE . SUBJECT: Arena Square Apartments REFERENCES: ENCLOSURES: Resolution and Letter of Intent RECOMMENDATION It is respectfully requested that the Board adopt the attached resolution authorizing the development of a $900,000.00 grant to Arena Square Apartments owners issued jointly by the CRA & Miami -Dade Empowerment Trust. BACKGROUND Resolution authorizing the owner of the Arena Square Apartments jointly with the Empowerment Trust to develop a plan for a $900,000.00 grant to the Arena Square Apartments based on a five to one leverage ratio to pay for improvements to the Arena Square Apartments in a manner consistent with the Third Avenue Business Corridor and the Overtown Charette. It is the intent of the CRA to partner with the Miami -Dade Empowerment Trust to provide a $900,000 grant to bridge the gap in the $5.5 million improvement plan for the New Arena Square Apartments. For every one dollar of grant funds the owner must show five (5) dollars of other financing. Funding Source: To Be Determined Account Number: To Be Determined SEOPW/CRA in Ion Aw Amw Jw�x rffu - SEOFW! CI�A- *- I 0 m Aw iT- L. lip SLOP-WICID-LA