Loading...
HomeMy WebLinkAboutSEOPW-CRA-2000-03-13-Discussion Item 12Ballpark Site Comparison Premises: A downtown ballpark can be a beneficial attraction 13 - 17 acres required ' Retractable roof cover required Minimal on -site (VIP) parking required -- 1,500 spaces New stadium opens in 2003, hence groundbreaking 2001 Public/non-profit ownership; Marlins as prime tenant Project financing predicated on approval of a tourist -based tax by Tallahassee and referendum Immune/exempt from ad valorem taxes C, Park West• . Criteria ' Project can be accommodated in a C. Direct Fiscal Park West ' City of Miami Tax Loss: $38,000 ' City of Miami Tax Loss: $ 0 A. Site Fit Project requires development/redevelop- ment.of 23 acres, inclusive of ROW in a portion of the park (16 acres) Impacts ' CRA Tax Increment Loss: $242,000 ' CRA Tax Increment Loss: $ 0 Requires land assembly Remainder of park available for redevelop- Limits future TIF potential Consideration for use of ballpark site Acquisition/condemnation of 19.12 acres ment with non -ballpark park uses (17 acres) Contribution from Marlins toward redevelop - of privately owned land ' No land assembly required ment of balance of park & pedestrian 72 parcels/32 buildings ' No relocation of ROW or utilities required improvements ' Adequate roadway capacity ' Adequate roadway capacity 36 property owners ` Consistent with Comprehensive Plan D. Accessl Relocation of ROW and utilities required ' Consistent with zoning Parking ' Area traffic flow may be improved for port- ` Area traffic flow may be improved for port - Consistent with Comprehensive Plan Could be accommodated in Increment 1 related reasons ' Additional signalization and other traffic related reasons Additional signalization and other traffic Consistent with zoning Would substantially deplete CRA's of Downtown DRI -- Not considered preferable management improvements may be needed management improvements may be needed DRI development rights ' Could be accommodated in Increment 2 ' Beneficial proximity to both Metrorail & Beneficial proximity to Metromover of Downtown DRI Metromover ' Improved pedestrian ways to Metrorail re- -- Scheduled to be filed Third Quarter 2000 ' Would reduce current inventory of parking quired ' No deed restrictions or other limitations in the area ` Adequate parking in area B. Costs/ *Total Assessed Value: $16.1 M ' Total Assessed Value: $ 17.3 M E. Catalytic ' Contributes to a "critical mass" of down- ' Contributes to a "critical mass" of down - Timetable Assessed Value/S.F.: $21 Assessed Value/S.F.: $ 25.43 Benefits/ town activities/downtown as a destination town activities/waterfront as a destination City's Estimated Market Value: $32.3 M City's Estimated Market Value: $44.2 M Adverse Essentially reduces Park West to west ' Fills activity "gap" linking Bayfront Park, Market Value/S.F.: $42 ' Market Value/S.F.: $65 Impacts Biscayne frontage Bayside, AA Arena, Performing Arts Center Pre -development costs (exclusive of ' Estimated Market Value based on Parrot ' Creates "dead" space 280 days a year ' Enhances Park West redevelopment potential environmental clean-up): $5.5 M Jungle (Watson Island appraisal) within fabric of downtown dynamics Potential environmental clean-up cost ' Pre -development costs (exclusive of ' Impedes Park West redevelopment unknown potential environmental clean-up): $50,000 dynamics City's estimated value/cost does not ` Environmental clean-up costs unknown Places heavy truck traffic near residential include: ' Acquisition timetable based on negotiation uses (at least in short term) Relocation costs process Places heavy truck traffic near pedstrian Professional fees (legal, appraisal) ' No other impediments to development activity at stadium entrance Transactional/Court costs Incompatibility between ballpark and Dynamic of a seller's market residential use Actual cost likely 2+ times City's estimated value F. Intangibles 'Value of waterfront open space in a non- 'Value of a civic "landmark" Use of Quick Take procedures not likely residential area ' Value of redeveloped, active waterfront Financial exposure park 'Value of enhanced predestrian activity -- Escrow requirements along waterfront and in Park West Standard Take: 1 year minimum After to property acquired additional time before construction would be required for: Replat of vacated ROW Business relocations Relocation of N.W. 1st Avenue Ballpark construction could likely not begin until 2002 J SEOPyYlCRA lu ?J AGENDA ITEM 12 MARLINS BALL PARK ALTERNATE PARK WEST LOCATION OPTION Prepared for: City of Miami Community Redevelopment Agency (CRA) March 13th, 2000 (DI BERMELLO AJAMIL & PARTNERS INC. Architecture Engineering Planning Landscape Architecture Interior Design 9 %7, x DHLLr Hi-.11011 L' %—%JO1 <.V1Ylr H1C1.7V1VJ ITE'CONSEDERA'1T Condemnation Required: No Acres to Utilize: 15.60' Number of Parcels: I Number of Existing Buildings: 3 Number of Property Owners: I Street Closures Required: No Acres of Right of Way to Vacate: 0 Acres of Right of Way to Construct: tbbdd Assessed Value of Land: $17,283,611 Assessed Value of Buildings: $0 Total Assessed Value: $17,283,61 1 Total Property Sq. Ft. 679,536 Value Per Sq. Ft.: $25.43 Estimated Market Value Per Sq. Ft.: $65 '- Total Estimated Market Value: $44.169.840 Silc()Ycnie"l'rloVC'oolparisonV I Condemnation Required: Yes Acres to Assemble: 17.66 Number of Parcels: 72 Number of Existing Buildings: 32 Number of Property Owners: 36 Street Closures Required: Yes: ' Acres of Right of Way to Vacate: 4.05 Acres of Right of Way to Construct: 3 5 �j Assessed Value of Land: $11,759,080 Assessed Value of Buildings: $6,724,685 Total Assessed Value: $16,096,510 Total Property Sq. Ft. 769,352 Value Per Sq. Ft.: $21 ' Anticipated Market Value Per Sq. Ft.: $42' Total Anticipated Market Value: $32,312,784' Condemnation Required: Yes Acres to Assemble: 18.67 a h Number of Parcels: 76 Number of Existing Buildings: 33 Number of Property Owners: D Street Closures Required: Yes:' " Acres of Right of Way to Vacate: 4.05 « Acres of Right of Way to Construct: 3 s Assessed Value of Land: $12,404,455 Assessed Value of Buildings: $6,529,921 Total Assessed Value: $16,512,326 ° Total Property Sq. Ft. 813,252 Value Per Sq. Ft.: $20 Anticipated Market Value Per Sq. Ft.: $42 ° Total Anticipated Market Value: $34,156,584 ° "ALLYAKK Jl l L %—VJ 1 UVIVIYAKISVNJ City of Miami Taxes: $0 CRA - Tax Incremental Revenue: $0 Property Value: $44,169,840 Building Demolition: $50,980 x Race Track Demolition: Unavailable New Infrastructure: Unavailable Total Costs: $44,220,820 ' Based on Sports Complex footprint 2 Based on'00 appraisal for Parrot Jungle project on Watson Island $5 demolition cost per sq. A. ofexisting buildings Street Closures: NE 9th St. ` Realignment of NE Ist Avenue " 6 Parcels not included. require additional research ,�xcdlx�a�.tl'' IJ.DR Site0vcniei% 1'rint/C'umpansunv I City of Miami Tax Loss: $38,000 10 CRA - Tax Incremental Revenue Loss: $242,000, 11 Property Acquisition: $32,312,784 12 Building Demolition: $1,683,180 13 New Infrastructure: $5,500,000 " Weuiufr-truetute- 4vt4nn onw nA 3 Total Costs: $4b Optional Property $16,638,120 Total w/Optional Property: $, St 5141},opct Total value divided by total sq... r Based on assessments Total value multiplied by anticipated market value 10 Based on'99 City of Miami Taxes Due " Based on City and County combined millage at 15.8 mills ''" Estimate provided by Bcrmello AJamil & Partners City of Miami Tax Loss: $39,000 10 CRA Incremental Revenue Loss: $248,000 " Property Acquisition: $34,156,584 " Building Demolition: $1,764,395 13 New Infrastructure: $5,500,000 14 3khlnFkfK9"'A": VAAAAAAAAAi - I,r„�i.c��I��G.� d 1114 ` 2.0,1-11 Total Costs: 3A Optional Property $16,638,120 Total w/Optional Property: T6A;559jN9 4 58.05q,-D99 PARK WEST SITE Optional Additional Property SITE CONSIDERATIONS Condemnation Required: Yes Acres to Assemble: 2.49 Number of Parcels: 10 Number of Buildings: 2 Number of Property Owners: tbd Assessed Value of Land: $10,540,000 Assessed Value of Buildings: $2,617,103 Total AssessedValue: $13,157,103 Total Property Sq. Ft. 108,464 Value Per Sq. Ft.: $121 Anticipated Market Value Per Sq. Ft. $150 Anticipated Total Market Value : $16,269,660 LICATIONS' AT City of Miami Tax Loss: $31,000 CRA Incremental Revenue Loss: $198,000 1 PRE -DEVELOPMENT COSTS Property Acquistion: $16,269,660 1 Building Demolition: $368,460 Total Costs: $16,638,120 SEOPW/CRA _-_ SiteOvcrviewPrint/Optionalpropert} V. I b Metrorail Park West Arena Towers People Mover Metrorail Station Chiller Plant RR tracks to POMh' People Mover Station Vehicular Circulation N.W. 9th Street Mall it� Miami Arena CITY OF MIAMI MARUNS BALL PARK DOWNTOWN PRELIAIINARY ALTERNATIVE LOCATIONS EVALUATION AJA.......r...,..,_............... MWa FIDPlDA DEVELOPMENT CONSTRAINTS PARK WEST SITE POTENTIAL ALTERNATE SITES j mm I� ^� ■ 4 BIL7 Firs. Parking Structure- 220 Cars/Floor —�-..jotal, Chiller Plant ARK ST =_ SIT a a I IN liiii IIIIIIIII IN r_ American Airlines Arena PARK !NEST SITE POTENTIAL ALTERNATE SITES Miami Arena N.W. 6th. St. Z . --_ Realigned N.E. 1st Ave. ........................ 395 I I I � I OICENTENNIA4 I r I I , I S LE re is 11 -----------.--- —J American Airlines Arena i l l l llN Zilllilll \ �`_- � � N W W Z Z I� Property to Condemn ..... 19.12 Acres R.O.W. to Vacate 4.67 Acres REQUIRED PROPERTY Sub -Total ..................... 23.79 Acres CONDEMNATION Optional .. . .2.31 Acres PARK WEST SITE Total .............. 26.1 Acres POTENTIAL ALTERNATE SITES CTIY OF MIAMI MARUNS BALL PARK DOWNTOWN - - PRELDAMARY ALTERNATIVE LOCATIONS EVALUATION WAK FLORMA t, P :t r 444-1, ".r *Wk Nor .w_ h E . 1 111 .t tip.. -14 f t i a -` .O . yam, _ i Chiller Plant N.W. 11th. ST. N.W. 10th. 1V muin. o 1 . mAL-t N.W. 8th. ST. Miami Arena U O to O �O N.W. 11th. sT. Z CITY OF MIAMI MARLINS BALL PARK DOWNTOWN MELUYUKARY ALTERNATIVE LOCATIONS EVALUATION WARE FLORMA Q W J D 0 m W Z U CO) to LEGEND �ww Site ■; ' 16.4 Acres (_ Open Space l� 4.44 Acres Realigned N.E. 1st Ave 2.95 Acres / 1,754' View Corridor 2.31 Acres Q c N W Z -IE PARK WEST SITE POTENTIAL ALTERNATE SITES N.E. 1St Avenue - West Alignment Order of Magnitude Preliminary Cost Estimate CITY OF MIAMI MARLINS BALL PARK PARK WEST SITE - WEST ALIGNMENT - ORDER OF MAGNITUDE PRELIMINARY COST ESTIMATE* Relocation of N.E. 1" Avenue (From R.R. Tracks to N.E. 111" Street) New Roadway ± 2400 L.F. @ 4 lanes of pavement @ 75' R/W A. Roadway (no demolition work included in estimate) 1. Subgrade preparation 18,700 s.y. @ $5.00 = $ 93,500 2. Base (crushed limerock - 8" thick) 4,174 c.y. @ $15.00 = 62,610 3. Pavement (2" thick) 11,700 s.y.. @ $6.00 = 70,200 4. Curb & Gutter 4400 x $12.00 = 52,800 5. Sidewalks 4400 L.F. x $15.00 = 66,000 6. Striping & signage (L.S.) = 30,000 Subtotal: S 375 11 n Lighting, Landscaping, Traffic Signalization and Drainage B. Street Lighting 48 light poles @ $750.00 = $ 36,000 C. Landscaping (Trees, tree grates, etc. L.S.) = 24,000 D. Traffic Light Systems = 200,000 E. Modifications to adjacent & intersecting streets (L.S.) = 250,000 F. Storm Drainage 18 catch basin @ $4,000 = 72,000 24,000 L.F. exfiltration trench @ $100.00 240,000 Subtotal: $ 822,000 *Developed from conceptual design and from preliminary concept drawings, not based on actual site survey or detailed design drawings. U N A CITY OF MIAMI MARLINS BALL PARK PARK WEST SITE - WEST ALIGNMENT - ORDER OF MAGNITUDE PRELIMINARY COST ESTIMATE* Utility Relocations and New Installations G. Utility Relocations and New Installations 8" sanitary sewer w/manholes 2400 L.F. @ $250.00 = $ 600,000 H. Water Mains 2400 L.F. @ $200.00 = 480,000 I. Telephone 2400 L.F. @ $100.00 = 240,000 J. Gas 2400 L.F. @ $150.00 = 360,000 K. Underground Electric 2400 L.F. @ $300.00 = 720,000 L Telecommunications 2400 L.F. @ $100.00 = 240,000 M. 24" Sewer Force Main 1000 L.F. @ $125.00 = 125,000 Subtotal: $ 2,765,000 Subtotal: $ 3,962,110 15% - Design & C.A. $ 594,316 20% - Contingency 911,285 Total Costs: $ 5,467,711 *Developed from conceptual design and from preliminary concept drawings, not based on actual site survey or detailed design drawings. Appendix East Alignment M F7 FTT -1 395, 7 Floors Parking Structure 220 Cars/Floor Total 1,600 cars Miami Arena Chiller Plant fY PARK 0 '40 7E w ----------------- z Uj V' IN Ui 2i Site CITY OF NHANU MARLINS BALL PARK DOWNTOWN PREL&M-4ARY ALTERNATIVE LOCATIONS EVALUATTON NMAW FLOPMk PICENTENNIA' p Rp S E 115.6 crb/s EAST LOOP ROAD ALTERNATIVE PARK WEST POTENTIAL ALTERNATE SITES d oo w dl� tjt:J m' v= d i 395 n- L I E I 1 _M Miami Arena 1111111111 MM IN I 1-1-furl d i `i C Property to Condemn 17.76 Acres �J R.O.W. to Vacate 4.05 Acres ----- New R.O.W. 3 Acres/1,754 I.f. CITY OF MIAMI MARLINS BALL PARK DOWNTOWN PRELB494ARY ALTERNATIVE LOCATIONS EVALUATION I I I I 0I;CENTENNIA4 ►! I S LE I �16S ----------------J REQUIRED PROPERTY CONDEMNATION PARK WEST SITE East Loop Road Alternative POTENTIAL ALTERNATE SITES r�� 0 C