HomeMy WebLinkAboutR-22-0087City of Miami
tn�l6_OF
Fa. V Legislation
*tliti fill! IiRl 11 +*�
Resolution: R-22-0087
File Number: 11376
City Hall
3500 Pan American Drive
Miami, FL 33133
www.miamigov.com
Final Action Date: 3/10/2022
A RESOLUTION OF THE MIAMI CITY COMMISSION, WITH ATTACHMENT(S),
AUTHORIZING THE CITY MANAGER TO EXECUTE AN OFF -SYSTEM
CONSTRUCTION AND MAINTENANCE AGREEMENT, IN SUBSTANTIALLY
THE ATTACHED FORM, WITH THE STATE OF FLORIDA DEPARTMENT OF
TRANSPORTATION ("FDOT"), FOR IMPROVEMENTS ON STATE ROAD
972/CORAL WAY FROM SOUTH OF INTERSTATE 95 (1-95) TO EAST OF
SOUTHWEST 3RD AVENUE, MIAMI, FLORIDA, FOR THE
RECONSTRUCTION OF THE EXISTING INTERSECTION TO PROVIDE A
ROUNDABOUT, INCLUDING IMPROVEMENTS ON ROADS NOT ON THE
STATE HIGHWAY SYSTEM.
WHEREAS, the Florida Department of Transportation (TDOT") has developed design
plans Financial Management (TM") Project No. FM 444450-1-52-01 for State Road ("SR")
972/Coral Way from south of Interstate 95 (1-95") to east of Southwest 3rd Avenue for the
reconstruction of the existing intersection to provide a roundabout, replacement of signals,
pullboxes, new lighting, additional drainage, pier protection, and landscaping ("Project"); and
WHEREAS, FDOT intends to undertake and complete the Project, a portion of which
includes work on roads not on the State Highway System but City of Miami ("City") right-of-way,
specifically Southwest 15th Road/Broadway Street from Southwest 12th Street to Southwest
2nd Court, and on Southwest 3rd Avenue from Coral Way to Southwest 12th Street; and
WHEREAS, the Project includes roadway reconstruction, sidewalk, curb, utility
adjustments, raised medians, guardrail, driveways, pier protection, pedestrian ramps, pavement
markings, signage, drainage structures, landscaping, and lighting ("Local Roadway
Improvements") and all activities associated with, or arising out of the construction of the Local
Roadway Improvements; and
WHEREAS, the Off -System Construction and Maintenance Agreement ("Agreement"),
attached and incorporated as Exhibit "A", establishes the terms, conditions, and responsibilities
of FDOT and the City to accomplish the Project and Local Roadway Improvements on the City's
Streets; and
WHEREAS, the City agrees with the terms and conditions in the Agreement, in
substantially the attached form;
NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF
MIAMI, FLORIDA:
Section 1. The recitals and findings contained in the Preamble to this Resolution are
adopted by reference and incorporated as if fully set forth in this Section.
City of Miami Page 1 of 2 File ID: 11376 (Revision:) Printed On: 312112022
File ID: 11376
Enactment Number: R-22-0087
Section 2. The City Manager is authorized' to execute the Agreement, in substantially
the attached form, with FDOT, for the Project on SR 972/Coral Way from south of 1-95 to east of
Southwest 3rd Avenue, Miami, Florida, which includes improvements on roads not on the state
highway system, and the Local Roadway Improvements.
Section 3. This Resolution shall become effective immediately upon its adoption.
APPROVED AS TO FORM AND CORRECTNESS:
1
,A(
i ria i ndez, Cify H.ttor iey 2/28/2022
' The herein authorization is further subject to compliance with all legal requirements that may be
imposed, including but not limited to, those prescribed by applicable City Charter and City Code
provisions.
City of Miami Page 2 of 2 File ID: 11376 (Revision:) Printed on: 312112022