...°, k ' File ID: #6516
Resolution
Sponsored by: Commissioner Manolo Reves
A RESOLUTION OF THE MIAMI CITY COMMISSION DIRECTING THE CITY
MANAGER TO AMEND THE "AUBURNDALE TRAFFIC CIRCLE AT SOUTHWEST 32
AVENUE AND 2 STREET PROJECT," OFFICE OF CAPITAL IMPROVEMENTS ("OCI")
PROJECT NO. B-173665 ("AUBURNDALE PROJECT"), TO INSTALL A RAISED
INTERSECTION INSTEAD OF A TRAFFIC CIRCLE; FURTHER AUTHORIZING AND
DIRECTING THE CITY MANAGER TO TAKE ANY AND ALL ACTION(S) NECESSARY
TO EXPEDITIOUSLY DESIGN AND CONSTRUCT THE AUBURNDALE PROJECT
AND THE "TRAFFIC CALMING DEVICE AT INTERSECTION OF SOUTHWEST 32
AVENUE AND SOUTHWEST 5 STREET PROJECT," OCI PROJECT NO. B-50505
WITH THE GOAL OF COMPLETING CONSTRUCTION FOR SAID PROJECTS IN
MAY 2020.
0v W 9,
City of Miami City Hall
* �h7„F UAn3500 Pan American Drive
Legislation Miami, FL 33133
www.miamigov.com
Resolution
Enactment Number: R-19-0425
File Number: 6516 Final Action Date:10/24/2019
A RESOLUTION OF THE MIAMI CITY COMMISSION DIRECTING THE CITY
MANAGER TO AMEND THE "AUBURNDALE TRAFFIC CIRCLE AT SOUTHWEST 32
AVENUE AND 2 STREET PROJECT," OFFICE OF CAPITAL IMPROVEMENTS ("OCI")
PROJECT NO. B-173665 ("AUBURNDALE PROJECT"), TO INSTALL A RAISED
INTERSECTION INSTEAD OF A TRAFFIC CIRCLE; FURTHER AUTHORIZING AND
DIRECTING THE CITY MANAGER TO TAKE ANY AND ALL ACTION(S) NECESSARY
TO EXPEDITIOUSLY DESIGN AND CONSTRUCT THE AUBURNDALE PROJECT
AND THE "TRAFFIC CALMING DEVICE AT INTERSECTION OF SOUTHWEST 32
AVENUE AND SOUTHWEST 5 STREET PROJECT," OCI PROJECT NO. B-50505
WITH THE GOAL OF COMPLETING CONSTRUCTION FOR SAID PROJECTS IN
MAY 2020.
WHEREAS, the intersections of Southwest 32nd Avenue and Southwest 2nd Street and
Southwest 32nd Avenue and Southwest 5th Street (collectively, "Southwest 32nd Avenue
Intersections") are in City of Miami ("City") residential neighborhoods that experience significant
cut -through traffic and speeding during rush hour periods; and
WHEREAS, such cut -through traffic and speeding on local residential streets, not
designed for such volume, diminishes residents' quality of life; and
WHEREAS, in addition to quality of life problems such as noise and general congestion,
such cut -through traffic and speeding creates significant life -safety risks as those residential
streets are narrower than nearby arterial roadways, increasing the risk of vehicular accidents,
including those involving pedestrians; and
WHEREAS, rush hour cut -through traffic tends to disobey posted speed limits and
signage in order to gain an advantage over using arterial roadways meant for such traffic; and
WHEREAS, in order to address these quality of life issues, the City took all necessary
and required actions to approve the "Auburndale Traffic Circle at Southwest 32 Avenue and 2
Street Project," Office of Capital Improvements ("OCI") Project No. B-173665 ("Auburndale
Project"), the scope of which consists of installing a traffic circle with minor drainage and
landscape at the Southwest 32nd Avenue Intersections; and
WHEREAS, the City's Department of Fire -Rescue ("Fire -Rescue") has advised that it
does not approve the proposed traffic circle at the Southwest 32nd Avenue Intersections
because it does not meet the turning radius requirements of emergency vehicles and would
have an adverse impact on emergency response times; and
WHEREAS, the City Commission wishes to resolve the quality of life issues raised by
residents while also addressing the concerns of Fire -Rescue by installing a raised intersection
instead of a traffic circle at the Southwest 32nd Avenue Intersections; and
WHEREAS, in order to further address these quality of life issues, the City took all
necessary and required actions to approve the "Traffic Calming Device at Intersection of
Southwest 32 Avenue and Southwest 5 Street Project," OCI Project No. B-50505 ("5th Street
Project"), the scope of which consists of installing a raised intersection along with milling and
resurfacing, miscellaneous drainage, replacement of damaged sidewalks, replacement of
damaged curbs and gutters, ADA ramps, landscaping, and pavement marking and signage; and
WHEREAS, the City Commission believes it is in the best interests of the residents to
install raised intersections at the Southwest 32nd Avenue Intersections as expeditiously as
possible;
NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF
MIAMI, FLORIDA:
Section 1. The recitals and findings contained in the Preamble to this Resolution are
adopted by reference and incorporated as if fully set forth in this Section.
Section 2. The City Commission directs the City Manager to amend the Auburndale
Project to address the concerns of the residents and Fire -Rescue by installing a raised
intersection instead of a traffic circle.
Section 3. The City Commission authorizes' and directs the City Manager to take any
and all action(s) necessary to expeditiously design and construct the raised intersections at the
Auburndale Project and the 5th Street Project with the goal of completing construction for said
projects in May 2020.
Section 4. This Resolution shall become effective immediately upon its adoption and
signature of the Mayor.2
APPROVED AS TO FORM AND CORRECTNESS:
J
Uiadez,ity ttor ey 9/17/2019
' The herein authorization is further subject to compliance with all requirements that may be imposed by
the City Attorney, including but not limited to, those prescribed by applicable City Charter and City Code
provisions.
2 If the Mayor does not sign this Resolution, it shall become effective at the end of ten (10) calendar days
from the date it was passed and adopted. If the Mayor vetoes this Resolution, it shall become effective
immediately upon override of the veto by the City Commission.