Loading...
HomeMy WebLinkAboutR-21-0280City of Miami tn�l6_OF Fa. V Legislation *tliti fill! IiRl 11 +*� Resolution: R-21-0280 File Number: 9147 City Hall 3500 Pan American Drive Miami, FL 33133 www.miamigov.com Final Action Date: 7/8/2021 A RESOLUTION OF THE MIAMI CITY COMMISSION, WITH ATTACHMENTS, AFTER A PUBLIC HEARING, DIRECTING THE CITY MANAGER TO TAKE ANY AND ALL ACTIONS NECESSARY TO EXPEDITIOUSLY REQUEST THAT THE MIAMI-DADE COUNTY TRANSPORTATION & PUBLIC WORKS DEPARTMENT ("DTPW') CONSIDER PROPOSED TRAFFIC FLOW MODIFICATIONS REGARDING THE CITY OF MIAMI'S OFFICE OF CAPITAL IMPROVEMENTS PROJECT NO. 40-1350505 AND WAIVE THE REQUIRED RESIDENT CONCURRENCE AND EXEMPT THE BALLOTING PROCESS IN ORDER TO EXPEDITIOUSLY PROCEED WITH THE DESIGN AND CONSTRUCTION OF TWO (2) RAISED INTERSECTIONS AND A GENERIC DEVICE THAT WILL SERVE AS TRAFFIC CALMING DEVICES AT THE INTERSECTION OF SOUTHWEST 32ND AVENUE AND SOUTHWEST 5TH STREET; DIRECTING THE CITY CLERK TO SEND A CERTIFIED COPY OF THIS RESOLUTION TO THE DTPW DIRECTOR. SPONSOR(S): Commissioner Manolo Reyes WHEREAS, the intersection of Southwest 32nd Avenue and Southwest 5th Street is in a City of Miami ("City") residential neighborhood that experiences significant cut -through traffic and speeding during rush hour periods; and WHEREAS, such cut -through traffic and speeding on a local residential street not designed for such volume, diminishes residents' quality of life; and WHEREAS, in addition to quality -of -life problems such as noise and general congestion, such cut -through traffic and speeding creates significant life -safety risks as this residential street is narrower than nearby arterial roadways, increasing the risk of vehicular accidents, including those involving pedestrians; and WHEREAS, rush hour cut -through traffic tends to disobey posted speed limits and signage in order to gain an advantage over using arterial roadways meant for such traffic; and WHEREAS, in order to address these quality -of -life issues, the City took all necessary and required actions to approve the "Traffic Calming Device at Intersection of Southwest 32 Avenue and Southwest 5 Street Project," Office of Capital Improvements ("OCI") Project No. 13- 50505 ("5th Street Project"), the scope of which consists of installing a raised intersection along with milling and resurfacing, miscellaneous drainage, replacement of damaged sidewalks, replacement of damaged curbs and gutters, ADA ramps, landscaping, and pavement marking and signage; and WHEREAS, the City Commission believes it is in the best interest of the residents to install raised intersections at the intersection of Southwest 32nd Avenue and Southwest 5th Street as expeditiously as possible and the City Commission previously adopted Resolution No. R-19-0425, attached and incorporated as Exhibit "A", on October 24, 2019, which authorized City of Miami Page 1 of 2 File ID: 9147 (Revision:) Printed On: 711612021 File ID: 9147 Enactment Number: R-21-0280 and directed the City Manager to design and construct the 5th Street Project with the goal of completing said project by May 2020; and WHEREAS, Section 1.6 of the Miami -Dade County Traffic Flow Modification(s)/Street Closure(s) Procedure ("County Procedure") as revised by the Miami -Dade County Public Works Department ("PWD") Traffic Engineering Division in January 2009, attached and incorporated as Exhibit "B", states that the construction of traffic circles "[r]equires 100% concurrence of affected residents and/or property owners from four (4) corners adjacent to the proposed circles"; and WHEREAS, the skewed geometry of the intersection at Southwest 32nd Avenue and Southwest 5th Street requires more than the standard four (4) residents to be balloted; and WHEREAS, after conducting three (3) rounds of balloting, the City did not receive a sufficient response from the affected residents for a concurrence; and WHEREAS, Section 1.6 of the County Procedure, attached and incorporated as Exhibit "B", also states that "[i]n lieu of concurrence from the affected residents and/or property owners, a municipality may pass a resolution after a public hearing requesting PWD to consider the proposed traffic flow modification(s)/street cosure(s)"; and WHEREAS, it is in the best interest of the City's residents to waive the required resident concurrence and request that PWD consider the proposed traffic flow modifications regarding the 5th Street Project; NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. The recitals and findings contained in the Preamble to this Resolution are adopted by reference and incorporated as if fully set forth in this Section. Section 2. The City Commission, after a public hearing, authorizes' and directs the City Manager to take any and all actions necessary to expeditiously request that PWD consider the proposed traffic flow modifications regarding the 5th Street Project. Section3. The City Clerk is directed to send a certified copy of this Resolution to Director of Miami -Dade County's Department of Transportation & Public Works. Section 4. This Resolution shall become effective immediately upon its adoption. APPROVED AS TO FORM AND CORRECTNESS: 1 i , na i ndez, City Attor iey 6/2812021 1 The herein authorization is further subject to compliance with all legal requirements that may be imposed, including but not limited to, those prescribed by applicable City Charter and City Code provisions. City of Miami Page 2 of 2 File ID: 9147 (Revision:) Printed on: 711612021