Loading...
HomeMy WebLinkAboutExhibit BCITY OF MIAMI, FLORIDA INTER -OFFICE MEMORANDUM TO: Annie Perez, CPPO Director Procurement Department FROM: Hector L. B Interim Director Office of Capital Improvements DATE: October 21, 2020 FILE: 40-B30737 SUBJECT: Contract Capacity Increase for Contractor's Proposal for Additional Curbing for South Bayshore Lane/Fairview Street Flood Migiation Project (40-1330737) ENCLOSURES: Terra Hyle Contractors, Inc. Original Contract and Proposal for Additional Services By this memorandum, the Office of Capital Improvements ("OCI") is requesting to modify the Professional Services Agreement (PSA) with Terra Hyle Contractor's authorization pursuant to RFQ 17-18-023 for the provision of design services for the South Bayshore Lane/Fairview Street — Flood Mitigation Project (40- B30737), to increase the original contract capacity amount of $698,755.37 by the amount of $72,064.36 for a new total contract capacity of $770,819.73, which includes the cost of construction changes previous ordered of-$3,017.18. The additional scope elements include added curbing and sodding. Backgroand The original scope consists primarily of furnishing all materials, labor, and equipment necessary for roadway improvements for the South Bayshore Lane and Fairview Street Project (40-B30737), including roadway reconstruction, drainage system installation, sidewalk and driveway approach repair and replacement, milling and resurfacing, and Swale restoration, as well as new curb and gutter, striping, signage, Americans with Disabilities Act (ADA) compliant pedestrian ramps, and storm water pump station. We are requesting the contract increase to fund additional curbing and sodding improvements that were requested by the neighborhood residents and approved by the City. Currently, the drainage work is approximately 98% completed, pending clean up of the structures and testing.The water main and services completed 100% while the concrete work is approximately 25% completed, pending road reconstruction and paving, The contractor was re -mobilized to complete work on the project following a shut down due to COVID-19. Attached you will find copy of the original executed contract and the Contract Change Order received from Terra Hyle Contractors, Inc. Should you have any questions, please feel free to contact me directly or Interim Director Hector Badia at 305- 41 E-1236 or hbadia@miamigov.com. X Approve ❑ Denied Phekwaba, �+► Nzedbe � � Nzeribe Iltekwaba, Ph. D, P.E. Date CC: Annie Perez, CPPO, Director, Procurement Fernando Ponassi Botttureira, MA Arch„ MA PPA, Assistant Director. Procurement Orlando Misas, Project Manager, OCI Robert Fenton, Construction Manager, OCI (6) Cf tp of Ohm' Contract Change Order Project Name: S Bayshore Ln and Fairview St, D2 Project No.: B-30737 Contractor: Terra Hyle Contractors, Inc. 2140 S Dixie Hwy, Ste 205K Miami, FL 33133 Change Order No.: 007 Contract Award Date: 02/25/2019 Completion Date: 0 1 /1312020 Revised Completion Date (prior to this change): 05/20/2020 Extension(s) of Time Previously Approved: 128 days Revised Completion Date (including this change): 07/04/2020 The Contractor and the City hereby agree to modify the Contract as follows: (Attach additional pages as necessary) Item No. Description of Change Contract Price Contract Tme Increase Decrease Increase Decrease 1 Change Order No 7: Additional Curbs and Sodding $72,064.36 $0.00 45 0 Difference (Net) $72,064.36 $0.00 45 0 SUMMARY OF CONTRACT AMOUNT Reason for Change Additional Curbs and Sodding requested by City Regulatory Change No Original Contract Amount $698,755.37 City Requested Yes Cost of Construction Changes Previous) Ordered ($3,017.18) Design Error No Adjusted Contract Amount Prior to this Change Order $695,738.19 Unforeseen/Unforeseeable Yes Cost of Construction Changes in this Change Order $72,064.36 Adjusted Contract Amount Including this Change $767,802.59 Percentage Increase this Change Order 9.8 % Total Percent Increase to Date 9.8 Contingency Funds Used Contingency Contingency Balance $8,139.39 Extension of Time Allowed by this Change - 45 days This change order is hereby incorporated into and ecomes a part of the Contract Documents, Accepted By Contractor: Date: June 29, 2020 Accepted By CITP Director Date: Distribution: Contractor A/E LJ Finance LJ Project File LJ Capital Improvements and Transportation Program CITP Form CO 444 SW 2nd Ave, 8th Floor Miami, Florida 33130