City of Miami
Office of Capital Improvements
p
Change Proposal Request
It
Part A
Page 1 of 2
CONTRACTOR: Terra Hyle Contractors, Inc. CPR NUMBER.: 007
ADDRESS: 2140 S Dixie Hwy, Suite 205K PROJECT NO.: B-30737
Miami, FL 33133 PROJECT TITLE: S Bayshore Ln and Fairview St, D2
Project Manager: Felix Ocana
Fax No: (786)773-1711
Phone: (786)516-1340
E-mail: felix@terrahyleinc.com
This Change Proposal Request (CPR) is submitted requesting a Change Order to the Contract to
increase/decrease the time for performance or the value of the Contract
DETAILED BASIS/SCOPE FOR CPR Please add a detailed description of proposed changes, including
background, justification and exact location of installation. Failure to submit sufficient detail may result in the rejection of or
ulfi4&raniL.3i4.TaGJ V r,,@
Additional Concrete Curbs and Sod per plans received from R Fenton via e-mail on 06/10/2020 that were not included in the
original plans.
FINANCIAL DATA
Original Contract Value:
$698,755.37
Value of Previous Change Orders ($3,017,18)
Increase/Decrease in time for Completion: 45
Current Completion Date: 05/20/2020
CPR Value: $72,064.36
Proposed Revised Contract Value: $767,802.59
(calendar days)
Proposed Completion Date: 07/04/2020
By signing and submitting this CPR the Contractor certifies that the supporting cost data is accurate and, in the opinion of the
undersigned, the stated prices and/or time request are both fair and reasonable. The signatory certifies that they are authorized
by the Contractor to execute this CPR.
Name: Felix Ocana
Title: Vice President
CITP Form CPR -A
Signature:
Date of Submittal: June 29, 2020
Revised 07/30/15
Change Proposal Request
Part A
Page 2 of 2
CONTRACTOR: Terra Hyle Contractors, Inc.
CPR NUMBER.: 007
PROJECT NO.: B-30737
PROJECT TITLE: S Bayshore Ln and Fairview St, D2
CPR VALUE: $72,064.36
City of Miami Review (CONTRACTOR DO NOT COMPLETE)
Reason for Change: Regulatory ❑ City ❑ E/O ❑ Unforeseen ❑
By signing below the signatory has either concurred with or rejected the proposed CPR as submitted:
ARCHITECT/ENGINEER: ❑ Concur ❑ Rejected
Name of Firm. -
Name Signature Date
CITY OF MIAMI
Project Manager: ❑ Concur ❑ Rejected
Name
Construction Manager:
Digitally signed by Fenton, Robert
Date: 2020.06.30, 08:22:03-04'00'
Name
Team Leader:
Name
Assistant Director:
Jorge Mora
Name
Director:
Steven C. Williamson
Name
CITP Form CPR -A
Signature Date
❑ Concur ❑ Rejected
Signature Date
❑ Concur ❑ Rejected
Signature
❑ Concu ❑ Rejected
�v7,�
Signature
J C ❑Rejected
Signature
Date
Date
7/% /2-3
Date
Revised 07/30/15
CONTRACTOR: City of Miami
Terra Hyle Contractors, Inc. Capital Improvements Program Sheet _1_ of _1_
2140 S Dixie Hwy, Ste 205K, Miami, FL CONTRACTOR CHANGE PROPOSAL REQUEST
Part B
A.
ITEM
No. '
B.
ITEM DESCRIPTION
C.
OTY
UNIT
D.N4,000.00
E.
LABOR
F. MATERIAL
(IncludingE ui ment
G.
UNIT PRICE #
(E.1 + F.1)
TOTAL LINE ITEM
PRICE (E.2 (E.2 + F.2)
2. Total
E.1 X C
1. 2. Total
Unit Cost (F.1 X C
1
Maintenance of Traffic
1
LS
00
$ 2,500.00
$
$
$ 2,500.00
$ 2,500.00
2
Survey- Layout & As-Builts
1
LS
00
$ 4,000.00
$
$ 4,000.00
$ 4,000.00
3
Concrete Crew Mobilization
1
LS
00
$ 1,500.00
$
$ 1,500.00
$ 1,500.00
Demolition and Haulin
7186CF
26
$ 9,054.36
$
$ 1.26
$ 9,054.36
6" x 12" Ribbon Curb
1535
LF
00
$ 33,770.00
$
$ 22.00
$ 33,770.00
24" Valle Gutter
210
LF
00
$ 5,670.00
$
$ 27.00
$ 5,670.00
Type "F" Curb Radius
195
LF
00
$ 5,850.00
$
$ 30.00
$ 5,850.00
6-inch Com acted Base for New Curb
1940
LF
00
$ 7,760.00
$
$ 4.00
$ 7,760.00
570-1-2
Performance Turf, Sod
280
SY
00
$ 1,960.00
$
$ 7.00
$ 1,960.00
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Overhead (self -perform)
NOTES: Overhead (subcontract perform)
1. ' Identify all items to be subcontracted with an Profit (self -perform)
2. # Designate all unit prices that are listed in contract Profit (subcontract perform)
3. Detailed back-up documentation may be requested to support stated costs
TOTAL (This Sheet)
Prepared By: Felix Ocana L^� GRAND TOTAL (Last Sheet)
Title: Vice President Signature Date:
6/29/2020
$ 72,064.36